POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 13items · current page 1–13 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-55f97cc0d7d2992111b324d5
Detailed source fields Original source field Published value or condition stable_project_id kproj_82d39daa5e07ad6f stable_project_key prjtDef:231459:ESB project_definition 231459 first_region_code ESB manual_source_format false project_name 154kV 동면S/S 건설사업 project_name_list 154KV 동면변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 춘천시 project_period_raw 2018.10~2027.10 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_82d39daa5e07ad6f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_82d39daa5e07ad6f
Sources EV-55f97cc0d7d2992111b324d5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 62b6fecc86ced3025968a5807cecc44049b576709064c8751ef08608775d7569 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_75447d633b910437 stable_project_id kproj_82d39daa5e07ad6f source_key 202609|231459|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154KV 동면변전소 건설사업 project_name_detail 154kV 동면S/S 건설사업 region_summary_raw 강원특별자치도 춘천시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2023.11 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] ○‘18.06 : 제8차 전력수급기본계획 반영 ○‘23.05 : 강원 수열에너지 융복합 클러스터 실시계획 승인 고시(산단 내 변전소 반영) ○‘23.11 : 부지 확정 ○‘25.08 : 기본설계 확정 ○‘25.12 : 용지매수 완료 [향후계획] ○‘26.09 : 변전공사 착공 ○‘28.10 : 변전공사 준공 future_plan_redacted □ 향후계획 ○‘18.06 : 제8차 전력수급기본계획 반영 ○‘23.05 : 강원 수열에너지 융복합 클러스터 실시계획 승인 고시(산단 내 변전소 반영) ○‘23.11 : 부지 확정 ○‘25.08 : 기본설계 확정 ○‘25.12 : 용지매수 완료 [향후계획] ○‘26.09 : 변전공사 착공 ○‘28.10 : 변전공사 준공 attachment_count 0 source_detail_sha256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231459|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_82d39daa5e07ad6f stable_project_key prjtDef:231459:ESB project_definition 231459 first_region_code ESB manual_source_format false project_name 154kV 동면S/S 건설사업 project_name_list 154KV 동면변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 춘천시 project_period_raw 2018.10~2027.10 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_82d39daa5e07ad6f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_82d39daa5e07ad6f
Sources EV-55f97cc0d7d2992111b324d5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 62b6fecc86ced3025968a5807cecc44049b576709064c8751ef08608775d7569 Observations for this power asset History for this project