POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동면S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-55f97cc0d7d2992111b324d5
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_82d39daa5e07ad6f
stable_project_keyprjtDef:231459:ESB
project_definition231459
first_region_codeESB
manual_source_formatfalse
project_name154kV 동면S/S 건설사업
project_name_list154KV 동면변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail강원특별자치도 춘천시
project_period_raw2018.10~2027.10
project_scale_raw154/23KV 60MVA * 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_75447d633b910437
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_82d39daa5e07ad6f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_82d39daa5e07ad6f

Sources EV-55f97cc0d7d2992111b324d5
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 62b6fecc86ced3025968a5807cecc44049b576709064c8751ef08608775d7569
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source schedule candidates · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231459|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source snapshots by date · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_75447d633b910437
stable_project_idkproj_82d39daa5e07ad6f
source_key202609|231459|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154KV 동면변전소 건설사업
project_name_detail154kV 동면S/S 건설사업
region_summary_raw강원특별자치도 춘천시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 강원특별자치도 춘천시
Project period
  • 2018.10~2027.10
사업 규모
  • 154/23KV 60MVA * 2BANK
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2023.11
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
○‘18.06 : 제8차 전력수급기본계획 반영 ○‘23.05 : 강원 수열에너지 융복합 클러스터 실시계획 승인 고시(산단 내 변전소 반영) ○‘23.11 : 부지 확정 ○‘25.08 : 기본설계 확정 ○‘25.12 : 용지매수 완료 [향후계획] ○‘26.09 : 변전공사 착공 ○‘28.10 : 변전공사 준공
future_plan_redacted□ 향후계획 ○‘18.06 : 제8차 전력수급기본계획 반영 ○‘23.05 : 강원 수열에너지 융복합 클러스터 실시계획 승인 고시(산단 내 변전소 반영) ○‘23.11 : 부지 확정 ○‘25.08 : 기본설계 확정 ○‘25.12 : 용지매수 완료 [향후계획] ○‘26.09 : 변전공사 착공 ○‘28.10 : 변전공사 준공
attachment_count0
source_detail_sha256ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231459|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_75447d633b910437

Sources EV-b9c38b9b832312c6df098370
Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd
행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2
Source snapshots by date · KOR · kepco_planned

154kV 동면S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_82d39daa5e07ad6f
stable_project_keyprjtDef:231459:ESB
project_definition231459
first_region_codeESB
manual_source_formatfalse
project_name154kV 동면S/S 건설사업
project_name_list154KV 동면변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail강원특별자치도 춘천시
project_period_raw2018.10~2027.10
project_scale_raw154/23KV 60MVA * 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_75447d633b910437
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_82d39daa5e07ad6f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_82d39daa5e07ad6f

Sources EV-55f97cc0d7d2992111b324d5
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 62b6fecc86ced3025968a5807cecc44049b576709064c8751ef08608775d7569

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel