POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 25items · current page 1–25 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e8f7e40548ee0ffc203140c2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_86656cb445fe8fce
stable_project_keyprjtDef:232556:ESB
project_definition232556
first_region_codeESB
manual_source_formatfalse
project_name154kV 동면분기T/L 건설사업
project_name_list154kV 동면분기 송전선로 건설사업
purpose수열에너지 융복합 클러스터 단지 전력공급
project_region_detail강원특별자치도 춘천시
project_period_raw2018.06~2027.10
project_scale_rawACSR 330㎟×S×2C/4C, 1.5KM
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_56c5c8dae31cad85
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_86656cb445fe8fce

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_86656cb445fe8fce

Sources EV-e8f7e40548ee0ffc203140c2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f2f7d7f4be3489bbbb4c98945d09691498dc101378d8faae06838091b0f9d1c1
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source schedule candidates · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232556|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source snapshots by date · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_56c5c8dae31cad85
stable_project_idkproj_86656cb445fe8fce
source_key202609|232556|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 동면분기 송전선로 건설사업
project_name_detail154kV 동면분기T/L 건설사업
region_summary_raw강원특별자치도 춘천시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 수열에너지 융복합 클러스터 단지 전력공급
Project region
  • 강원특별자치도 춘천시
Project period
  • 2018.06~2027.10
사업 규모
  • ACSR 330㎟×S×2C/4C, 1.5KM
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
  • 제08차 장기송변전설비계획 반영(2018.06)
입지선정
  • 전력입지영향평가 용역 착수: 2024.09 입지선정위원회 구성시기: 2025.01 참여 위원 수 : 8 지장유무 조회: 2025.04~2025.05 경과지(부지) 확정: 2025.03
환경/재해 영향평가
  • 환경영향평가: 2025.06 ~ 재해영향평가: 2025.06 ~
주민의견 수렴
  • 지자체 공고 열람: 2026.03 ~ 2026.03 설명회·공청회: 2026.03 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ 2018.06 : 제8차 장기송변전설비계획 사업 신규반영 □ 2024.09 : 설계측량용역 계약 및 착수 □ 2025.01 : 입지선정위원회 위원 구성 □ 2025.02 : 입지선정위원회 1차 회의 시행 □ 2025.03 : 입지선정위원회 2차 회의 시행 □ 2025.04 : 입지선정위원회 3차 회의 시행 □ 2025.04 : 경과지 지장유무 조회 □ 2026.03 : 사업시행계획 주민공람 및 설명회 개최
□ 2026.하반기 : 전원개발실시계획 승인신청
future_plan_redacted□ 향후계획 □ 2026.하반기 : 전원개발실시계획 승인신청
attachment_count0
source_detail_sha25671e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232556|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_56c5c8dae31cad85

Sources EV-2257579cafe05c9b9befa86a
Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79
행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf
Source snapshots by date · KOR · kepco_planned

154kV 동면분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_86656cb445fe8fce
stable_project_keyprjtDef:232556:ESB
project_definition232556
first_region_codeESB
manual_source_formatfalse
project_name154kV 동면분기T/L 건설사업
project_name_list154kV 동면분기 송전선로 건설사업
purpose수열에너지 융복합 클러스터 단지 전력공급
project_region_detail강원특별자치도 춘천시
project_period_raw2018.06~2027.10
project_scale_rawACSR 330㎟×S×2C/4C, 1.5KM
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_56c5c8dae31cad85
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_86656cb445fe8fce

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_86656cb445fe8fce

Sources EV-e8f7e40548ee0ffc203140c2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f2f7d7f4be3489bbbb4c98945d09691498dc101378d8faae06838091b0f9d1c1

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel