POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 15items · current page 1–15 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동구지S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b573edca0534f031f850fb12
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5dc13235c4597d7f
stable_project_keyprjtDef:231426:ESB
project_definition231426
first_region_codeESB
manual_source_formatfalse
project_name154kV 동구지S/S 건설사업
project_name_list154kV 동구지S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail대구광역시 달성군
project_period_raw2026.01~2027.12
project_scale_raw154KV M.TR(60MVA)×2BANK,170KV GIS×12CCT 등
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d32ef44120453817
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5dc13235c4597d7f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5dc13235c4597d7f

Sources EV-b573edca0534f031f850fb12
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9a6052f865ab1810ec2f894849907dcd09b1985c3086f20473ccf80bea58a48a
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source schedule candidates · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231426|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source snapshots by date · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d32ef44120453817
stable_project_idkproj_5dc13235c4597d7f
source_key202609|231426|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 동구지S/S 건설사업
project_name_detail154kV 동구지S/S 건설사업
region_summary_raw대구광역시 달성군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 대구광역시 달성군
Project period
  • 2026.01~2027.12
사업 규모
  • 154KV M.TR(60MVA)×2BANK,170KV GIS×12CCT 등
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
1. 진행경과 □ '15.10 : 제7차 장기 송변전설비계획에 따른 신규사업 반영 □ '18.10 : 154kV 동구지(舊, 구지#3)변전소 입지확정 보고 □ '19.11 : 변전소 부지면적 변경 협조요청(1.5CB방식적용) □ '20.05 : 용지매수 의뢰 □ '24.12 : 동구지 변전소 준공목표 변경 알림('26.12 → '27.12) 2.향후계획 □ '26.07 : 공사 착공 □ '27.12 : 준공 및 가압
future_plan_redacted□ 향후계획 1. 진행경과 □ '15.10 : 제7차 장기 송변전설비계획에 따른 신규사업 반영 □ '18.10 : 154kV 동구지(舊, 구지#3)변전소 입지확정 보고 □ '19.11 : 변전소 부지면적 변경 협조요청(1.5CB방식적용) □ '20.05 : 용지매수 의뢰 □ '24.12 : 동구지 변전소 준공목표 변경 알림('26.12 → '27.12) 2.향후계획 □ '26.07 : 공사 착공 □ '27.12 : 준공 및 가압
attachment_count0
source_detail_sha256fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231426|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d32ef44120453817

Sources EV-fa53444285ce9d33ba8ca2df
Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e
행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6
Source snapshots by date · KOR · kepco_planned

154kV 동구지S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5dc13235c4597d7f
stable_project_keyprjtDef:231426:ESB
project_definition231426
first_region_codeESB
manual_source_formatfalse
project_name154kV 동구지S/S 건설사업
project_name_list154kV 동구지S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail대구광역시 달성군
project_period_raw2026.01~2027.12
project_scale_raw154KV M.TR(60MVA)×2BANK,170KV GIS×12CCT 등
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d32ef44120453817
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5dc13235c4597d7f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5dc13235c4597d7f

Sources EV-b573edca0534f031f850fb12
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9a6052f865ab1810ec2f894849907dcd09b1985c3086f20473ccf80bea58a48a

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel