POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 1601–1700 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2021-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_03d38bc8d86b56f2 stable_project_id kproj_2cf29a75712fbc35 source_key 202609|232529|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 대산개폐소분기T/L 건설사업 project_name_detail 154kV 대산개폐소분기T/L 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Seosan City, South Chungcheong Province 사업 규모 HSTACIR/AW 330㎟ × S × 2C × 0.38KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2019.02~2019.03 경과지(부지) 확정: 2019.06 환경/재해 영향평가 환경영향평가: 2019.12 ~ 2022.12 재해영향평가: 2019.12 ~ 2022.12 주민의견 수렴 지자체 공고 열람: 2020.10 ~ 2020.11 설명회·공청회: 2020.11 자체설명회: 2019.06 ~ 2020.02 사업설계 설계용역: 기본설계: 2022.03 ~ 2022.06 실시설계: 2022.06 ~ 2022.11 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.09 공사 기간: 2024.09 ~ 2025.12 감독자: [redacted], 실적): 100, 57 □ 진행경과 -'18.06 : 제8차 장기 송변전설비계획 반영 -'18.11 : 입지선정실무위원회 착수회의 시행 -'19.02 : 지장유무조회(->서산시청) -'19.03 : 토지소유주 사업계획 안내 및 보상협의 시행 -'19.06 : 154kV 대산개폐소 및 연관 송전선로 건설사업 입지확정위원회 심의(원안가결) -'20.02 : 마을주민 대상 사전 사업설명회 시행 -'20.04 : 설계측량 용역 계약 및 측량 시행 -'20.07 : 상생발전협의체 구성·운영 시행 -'20.08 : 공동협력 상생발전협약 체결, 회의시행 -'20.11 : 사업시행계획 공고 및 주민설명회 시행 -'21.03 : 전원개발사업 실시계획 승인신청 -'21.06 : 실시계획 승인신청에 따른 관계기관 협의 -'21.10 : 산지전용허가 협의 완료 -'21.11 : 중토위 협의 완료 -'21.12 : 농지전용허가 협의 완료 -'22.04 : 기본설계 확정 및 보고 -'22.06 : 준공목표변경('22.10->'23.10) -'22.10 : 실시계획 승인 -'22.11 : 실시설계 완료 -'23.03 : 도급공사 및 감리용역 계약 -'24.05 : 준공목표 변경('23.10->'25.10) -'24.08 : 시공측량 완료 및 착공 전 안전회의 시행 -'24.09 : 공사착공_진입로 및 기타 부지 개설 -'24.10 : 철탑기초 설치 -'24.11~12 : 철탑 조립 및 연·긴선 작업 -'25.10 휴전작업 및 가압완료 □ 향후계획 -'25.12 : 준공 future_plan_redacted □ 향후계획 □ 진행경과 -'18.06 : 제8차 장기 송변전설비계획 반영 -'18.11 : 입지선정실무위원회 착수회의 시행 -'19.02 : 지장유무조회(->서산시청) -'19.03 : 토지소유주 사업계획 안내 및 보상협의 시행 -'19.06 : 154kV 대산개폐소 및 연관 송전선로 건설사업 입지확정위원회 심의(원안가결) -'20.02 : 마을주민 대상 사전 사업설명회 시행 -'20.04 : 설계측량 용역 계약 및 측량 시행 -'20.07 : 상생발전협의체 구성·운영 시행 -'20.08 : 공동협력 상생발전협약 체결, 회의시행 -'20.11 : 사업시행계획 공고 및 주민설명회 시행 -'21.03 : 전원개발사업 실시계획 승인신청 -'21.06 : 실시계획 승인신청에 따른 관계기관 협의 -'21.10 : 산지전용허가 협의 완료 -'21.11 : 중토위 협의 완료 -'21.12 : 농지전용허가 협의 완료 -'22.04 : 기본설계 확정 및 보고 -'22.06 : 준공목표변경('22.10->'23.10) -'22.10 : 실시계획 승인 -'22.11 : 실시설계 완료 -'23.03 : 도급공사 및 감리용역 계약 -'24.05 : 준공목표 변경('23.10->'25.10) -'24.08 : 시공측량 완료 및 착공 전 안전회의 시행 -'24.09 : 공사착공_진입로 및 기타 부지 개설 -'24.10 : 철탑기초 설치 -'24.11~12 : 철탑 조립 및 연·긴선 작업 -'25.10 휴전작업 및 가압완료 □ 향후계획 -'25.12 : 준공 attachment_count 0 source_detail_sha256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232529|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2cf29a75712fbc35 stable_project_key prjtDef:232529:ESB project_definition 232529 first_region_code ESB manual_source_format false project_name 154kV 대산개폐소분기T/L 건설사업 project_name_list 154kV 대산개폐소분기T/L 건설사업 purpose 신규부하(대산석유화학단지)공급 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2025.10 project_scale_raw HSTACIR/AW 330㎟ × S × 2C × 0.38KM responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_2cf29a75712fbc35
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2cf29a75712fbc35
Sources EV-df6219f578ba9fb9128528e6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d9551db2f06e6af25af052f09573cd6f018fbed7ae2900b3cd977c3fcb9f89f0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-f7ae78da1223fbb823cd8255
Detailed source fields Original source field Published value or condition stable_project_id kproj_f88d492ceb13648a stable_project_key prjtDef:233594:ESB project_definition 233594 first_region_code ESB manual_source_format false project_name 154kV 대소-성본 지중T/L 건설사업 project_name_list 154kV 대소-성본 지중T/L 건설사업 purpose 진천,음성지역 방사상 계통 해소 등 계통보 project_region_detail 충청북도 음성군 project_period_raw 2024.10~2025.06 project_scale_raw 154KV PP 1,600㎟, 1C-8.3㎞ responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_f88d492ceb13648a
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f88d492ceb13648a
Sources EV-f7ae78da1223fbb823cd8255 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5bba1495d66ecd1275161e7250e8db59c799d174bbff2de6314b72569c195669 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233594|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9a7fc3193c67da22
Sources EV-4269da808c3c6ccf75e4b8b5 Evidence SHA-256 402a867beab5fda7f1b750e19572a6ff0ed2ec1662e6e2bd5295fbd2462b3b17 행 SHA-256 da94be62497498d9b3ce6c48faca1560308890becf14f9a0cf5be63eead94db9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233594|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9a7fc3193c67da22
Sources EV-4269da808c3c6ccf75e4b8b5 Evidence SHA-256 402a867beab5fda7f1b750e19572a6ff0ed2ec1662e6e2bd5295fbd2462b3b17 행 SHA-256 da94be62497498d9b3ce6c48faca1560308890becf14f9a0cf5be63eead94db9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_9a7fc3193c67da22 stable_project_id kproj_f88d492ceb13648a source_key 202609|233594|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 대소-성본 지중T/L 건설사업 project_name_detail 154kV 대소-성본 지중T/L 건설사업 region_summary_raw 충청북도 음성군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 402a867beab5fda7f1b750e19572a6ff0ed2ec1662e6e2bd5295fbd2462b3b17 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233594|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9a7fc3193c67da22
Sources EV-4269da808c3c6ccf75e4b8b5 Evidence SHA-256 402a867beab5fda7f1b750e19572a6ff0ed2ec1662e6e2bd5295fbd2462b3b17 행 SHA-256 da94be62497498d9b3ce6c48faca1560308890becf14f9a0cf5be63eead94db9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f88d492ceb13648a stable_project_key prjtDef:233594:ESB project_definition 233594 first_region_code ESB manual_source_format false project_name 154kV 대소-성본 지중T/L 건설사업 project_name_list 154kV 대소-성본 지중T/L 건설사업 purpose 진천,음성지역 방사상 계통 해소 등 계통보 project_region_detail 충청북도 음성군 project_period_raw 2024.10~2025.06 project_scale_raw 154KV PP 1,600㎟, 1C-8.3㎞ responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_f88d492ceb13648a
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f88d492ceb13648a
Sources EV-f7ae78da1223fbb823cd8255 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5bba1495d66ecd1275161e7250e8db59c799d174bbff2de6314b72569c195669 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7344da78f3ed655676ff073e
Detailed source fields Original source field Published value or condition stable_project_id kproj_a9c3d418f469a598 stable_project_key prjtDef:231628:ESB project_definition 231628 first_region_code ESB manual_source_format false project_name 154kV 대소원S/S 건설사업 project_name_list 154kV 대소원변전소 건설사업 purpose 인근지역 개발에 따른 신규 공급능력 확보 project_region_detail Chungju City, North Chungcheong Province project_period_raw 2023.05~2031.10 project_scale_raw 154/23KV 45/60MVA × 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a9c3d418f469a598
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a9c3d418f469a598
Sources EV-7344da78f3ed655676ff073e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 7e97a9669d0bd4ace75dd1207453549feb49c6f97b1b258a9775b632ac1f85bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2029-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2031-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2028-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2031-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231628|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b31c33b3430d7efc stable_project_id kproj_a9c3d418f469a598 source_key 202609|231628|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 대소원변전소 건설사업 project_name_detail 154kV 대소원S/S 건설사업 region_summary_raw 충청북도 충주시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields Project region Chungju City, North Chungcheong Province 사업 규모 154/23KV 45/60MVA × 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 [진행경과] □ ’23.05 : 제10차 장기 송변전설비계획 반영 □ ‘25.05 ~ ’26.08 : 충주 드림파크 산업단지 내 변전소 부지반영 협의 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] [향후계획] □ ‘28.11 : 용지 매수 □ ‘29.11 : 공사 착공 □ ‘31.10 : 준공 및 가압 future_plan_redacted □ 향후계획 [향후계획] □ ‘28.11 : 용지 매수 □ ‘29.11 : 공사 착공 □ ‘31.10 : 준공 및 가압 attachment_count 0 source_detail_sha256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231628|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b31c33b3430d7efc
Sources EV-2ae283247b353bab566d0dda Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba 행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a9c3d418f469a598 stable_project_key prjtDef:231628:ESB project_definition 231628 first_region_code ESB manual_source_format false project_name 154kV 대소원S/S 건설사업 project_name_list 154kV 대소원변전소 건설사업 purpose 인근지역 개발에 따른 신규 공급능력 확보 project_region_detail Chungju City, North Chungcheong Province project_period_raw 2023.05~2031.10 project_scale_raw 154/23KV 45/60MVA × 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a9c3d418f469a598
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a9c3d418f469a598
Sources EV-7344da78f3ed655676ff073e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 7e97a9669d0bd4ace75dd1207453549feb49c6f97b1b258a9775b632ac1f85bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9d76f4a1aae1c52ac7ae7985
Detailed source fields Original source field Published value or condition stable_project_id kproj_e1db47a51ae377b8 stable_project_key prjtDef:232617:ESB project_definition 232617 first_region_code ESB manual_source_format false project_name 154kV 대소원분기T/L 건설사업 project_name_list 154kV 대소원분기T/L 건설사업 purpose 인근지역 개발에 따른 신규 전력공급 project_region_detail Chungju City, North Chungcheong Province project_period_raw project_scale_raw ACSR410 * 2B responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_e1db47a51ae377b8
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e1db47a51ae377b8
Sources EV-9d76f4a1aae1c52ac7ae7985 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1ab07fe33b22a8ddc9162c41530e6c3abde4e4f90b3322293a9eb0305fd29c72 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b63c13a72922234c stable_project_id kproj_e1db47a51ae377b8 source_key 202609|232617|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 대소원분기T/L 건설사업 project_name_detail 154kV 대소원분기T/L 건설사업 region_summary_raw 충청북도 충주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields Project region Chungju City, North Chungcheong Province 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 00a045cf639a9f6f71c82181bc70e8be921fd7fe978bce36143fb01911aa5a5f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232617|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b63c13a72922234c
Sources EV-2d3628156c553639a03a092d Evidence SHA-256 00a045cf639a9f6f71c82181bc70e8be921fd7fe978bce36143fb01911aa5a5f 행 SHA-256 0e9d8043420e52190e79b310779a49a7907f7efdb3ac0df5255925a52dc83868 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e1db47a51ae377b8 stable_project_key prjtDef:232617:ESB project_definition 232617 first_region_code ESB manual_source_format false project_name 154kV 대소원분기T/L 건설사업 project_name_list 154kV 대소원분기T/L 건설사업 purpose 인근지역 개발에 따른 신규 전력공급 project_region_detail Chungju City, North Chungcheong Province project_period_raw project_scale_raw ACSR410 * 2B responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_e1db47a51ae377b8
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e1db47a51ae377b8
Sources EV-9d76f4a1aae1c52ac7ae7985 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1ab07fe33b22a8ddc9162c41530e6c3abde4e4f90b3322293a9eb0305fd29c72 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-932af869dcf1cabb2a06afa0
Detailed source fields Original source field Published value or condition stable_project_id kproj_f44a34d7d0e02207 stable_project_key prjtDef:231623:ESB project_definition 231623 first_region_code ESB manual_source_format false project_name 154kV 대장S/S 건설사업 project_name_list 154kV 대장S/S 건설사업 purpose 부천대장 공공주택지구 신규전력 공급 project_region_detail 경기도 부천시 오정구 project_period_raw 2023.05~2028.02 project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f44a34d7d0e02207
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f44a34d7d0e02207
Sources EV-932af869dcf1cabb2a06afa0 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 748dc93ffd1c960de79ecefc6dc5212ceddbf0a8feec1cdb1e7d476ffcc047ea Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2025-09-30 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2029-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2023-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11-24 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231623|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_03aba0523307c2e4 stable_project_id kproj_f44a34d7d0e02207 source_key 202609|231623|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 대장S/S 건설사업 project_name_detail 154kV 대장S/S 건설사업 region_summary_raw 경기도 부천시 오정구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR(60MVA) × 2BANK 계획확정 제10차 장기송변전설비계획 반영(2024.07) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 13 경과지(부지) 확정: 2025.12 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [추진실적] ㅁ '21.12 ~ : 부천대장 공공택지지구내 부지 반영 협의 (LH공사) ㅁ '22.12 : 부천대장지구 내 변전소 부지위치 변경 요청 (→LH공사) ㅁ '23.05 : 송변전설비계획 확정 ㅁ '23.11 : 부천대장 공공주택지구 실시계획 변경 (국토교통부) ㅁ '24.09 : 입지확정위원회 시행 ㅁ '25.05 : 실시계획 변경승인 대기 중 ㅁ‘25.09.30 : 154kV대장S/S 건설사업 관련 배전선로 초기 인출계획 문의 ㅁ‘25.11.24 : 국토교통부 고지변경(4차) [향후계획] ㅁ '26.12 : 변전소 부지 매수 ㅁ '27.12 : 공사착공 ㅁ '27.12 : 변전소 가압 및 공사준공 - 변전소 비표준 건축(실준공 :2029.09). 끝. future_plan_redacted □ 향후계획 [추진실적] ㅁ '21.12 ~ : 부천대장 공공택지지구내 부지 반영 협의 (LH공사) ㅁ '22.12 : 부천대장지구 내 변전소 부지위치 변경 요청 (→LH공사) ㅁ '23.05 : 송변전설비계획 확정 ㅁ '23.11 : 부천대장 공공주택지구 실시계획 변경 (국토교통부) ㅁ '24.09 : 입지확정위원회 시행 ㅁ '25.05 : 실시계획 변경승인 대기 중 ㅁ‘25.09.30 : 154kV대장S/S 건설사업 관련 배전선로 초기 인출계획 문의 ㅁ‘25.11.24 : 국토교통부 고지변경(4차) [향후계획] ㅁ '26.12 : 변전소 부지 매수 ㅁ '27.12 : 공사착공 ㅁ '27.12 : 변전소 가압 및 공사준공 - 변전소 비표준 건축(실준공 :2029.09). 끝. attachment_count 0 source_detail_sha256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231623|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03aba0523307c2e4
Sources EV-82c534e68ce89a40bfe08b62 Evidence SHA-256 6e4a65d2242ea0ac2a26cb4d083ebb4b5795608f173061621913b1456edc6a5d 행 SHA-256 adecfbaba6145ceec6e3dcc66bf4d2dd09c1cf8333e0f4542bbb2ad5286822bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f44a34d7d0e02207 stable_project_key prjtDef:231623:ESB project_definition 231623 first_region_code ESB manual_source_format false project_name 154kV 대장S/S 건설사업 project_name_list 154kV 대장S/S 건설사업 purpose 부천대장 공공주택지구 신규전력 공급 project_region_detail 경기도 부천시 오정구 project_period_raw 2023.05~2028.02 project_scale_raw 154KV M.TR(60MVA) × 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f44a34d7d0e02207
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f44a34d7d0e02207
Sources EV-932af869dcf1cabb2a06afa0 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 748dc93ffd1c960de79ecefc6dc5212ceddbf0a8feec1cdb1e7d476ffcc047ea Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-cf05ac171ff554e3adab502b
Detailed source fields Original source field Published value or condition stable_project_id kproj_e09d0ab3f4412cd5 stable_project_key prjtDef:234443:ESB project_definition 234443 first_region_code ESB manual_source_format false project_name 154kV 대저-어방 전력구 건설사업 project_name_list 김해-강서지역 전기공급시설 전력구공사(대저-어방 1차) purpose 부산 강서구 및 경남 김해지역 계통보강 project_region_detail 경상남도 김해시 부산광역시 강서구 project_period_raw 2019.04~2029.07 project_scale_raw 터널3,675M, 압입249M, 관로4,258M, 전력구10M responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_e09d0ab3f4412cd5
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e09d0ab3f4412cd5
Sources EV-cf05ac171ff554e3adab502b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0a5abdca21c60e85f062b1a05f4a733c5eab868b0a3f84bb36e838633b7fe2e3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2019-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2029-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2028-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2019-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234443|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_105ccad9287a643d stable_project_id kproj_e09d0ab3f4412cd5 source_key 202609|234443|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 김해-강서지역 전기공급시설 전력구공사(대저-어방 1차) project_name_detail 154kV 대저-어방 전력구 건설사업 region_summary_raw 경상남도 김해시등 2 지역 equipment_type_raw 전력구 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 터널3,675M, 압입249M, 관로4,258M, 전력구10M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2019.03 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2019.04 ~ 2022.05 기본설계: 2019.04 ~ 2020.03 실시설계: 2019.04 ~ 2022.05 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.05 공사 기간: 2023.05 ~ 2028.05 감독자: [redacted], 실적): 37, 17 □ 18.05 : 현장답사 및 분석결과 보고(→송변전건설처) □ 19.04 : 설계용역 착수 □ 20.03 : 기본설계심의 시행 □ 21.04 : 공사 시행 지시(←송변전건설처) □ 22.01 : 실시설계심의 시행 □ 23.04 : 공사계약((주)호반산업) □ 23.05 : 공사착수 □ 26.02 : 공사중지 □ 28.05 : 1차 공사 준공(예정) □ 29.02 : 2차 공사 준공(예정) future_plan_redacted □ 향후계획 □ 18.05 : 현장답사 및 분석결과 보고(→송변전건설처) □ 19.04 : 설계용역 착수 □ 20.03 : 기본설계심의 시행 □ 21.04 : 공사 시행 지시(←송변전건설처) □ 22.01 : 실시설계심의 시행 □ 23.04 : 공사계약((주)호반산업) □ 23.05 : 공사착수 □ 26.02 : 공사중지 □ 28.05 : 1차 공사 준공(예정) □ 29.02 : 2차 공사 준공(예정) attachment_count 0 source_detail_sha256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234443|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_105ccad9287a643d
Sources EV-94e7d07c59cdc3921d7383d4 Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe 행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e09d0ab3f4412cd5 stable_project_key prjtDef:234443:ESB project_definition 234443 first_region_code ESB manual_source_format false project_name 154kV 대저-어방 전력구 건설사업 project_name_list 김해-강서지역 전기공급시설 전력구공사(대저-어방 1차) purpose 부산 강서구 및 경남 김해지역 계통보강 project_region_detail 경상남도 김해시 부산광역시 강서구 project_period_raw 2019.04~2029.07 project_scale_raw 터널3,675M, 압입249M, 관로4,258M, 전력구10M responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_e09d0ab3f4412cd5
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e09d0ab3f4412cd5
Sources EV-cf05ac171ff554e3adab502b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0a5abdca21c60e85f062b1a05f4a733c5eab868b0a3f84bb36e838633b7fe2e3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-31d211252e0cd70925854193
Detailed source fields Original source field Published value or condition stable_project_id kproj_b68dc23a62d510c0 stable_project_key prjtDef:231448:ESB project_definition 231448 first_region_code ESB manual_source_format false project_name 154kV 델타S/S 건설사업 project_name_list 154kV 델타S/S 건설사업 purpose 에코델타시티내 부하분담 및 공급능력 확보 project_region_detail 부산광역시 강서구 project_period_raw project_scale_raw M.TR(154/23KV 20MVA×3대)×2BANK, 154KV GIS×10CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_b68dc23a62d510c0
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b68dc23a62d510c0
Sources EV-31d211252e0cd70925854193 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 fb761d8420f68489b429017c1571ad1fd18d52559c0ac6ab97f95bafe158cf64 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_da6395bf23de3af5 stable_project_id kproj_b68dc23a62d510c0 source_key 202609|231448|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 델타S/S 건설사업 project_name_detail 154kV 델타S/S 건설사업 region_summary_raw 부산광역시 강서구등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 M.TR(154/23KV 20MVA×3대)×2BANK, 154KV GIS×10CCT 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 ㅇ '30.04 : 변전소 가압 attachment_count 0 source_detail_sha256 b0c3d08abc3cf35a77f62d83af4d0f626916867a2dc36cafa9e5d6483aeec32c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231448|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_da6395bf23de3af5
Sources EV-00b97dc31770cbda3d8fb818 Evidence SHA-256 b0c3d08abc3cf35a77f62d83af4d0f626916867a2dc36cafa9e5d6483aeec32c 행 SHA-256 2d5b1623bf430a2e35c5a4ad91345f83b4578b53fc502a588b3e48330520ca86 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_b68dc23a62d510c0 stable_project_key prjtDef:231448:ESB project_definition 231448 first_region_code ESB manual_source_format false project_name 154kV 델타S/S 건설사업 project_name_list 154kV 델타S/S 건설사업 purpose 에코델타시티내 부하분담 및 공급능력 확보 project_region_detail 부산광역시 강서구 project_period_raw project_scale_raw M.TR(154/23KV 20MVA×3대)×2BANK, 154KV GIS×10CCT responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_b68dc23a62d510c0
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b68dc23a62d510c0
Sources EV-31d211252e0cd70925854193 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 fb761d8420f68489b429017c1571ad1fd18d52559c0ac6ab97f95bafe158cf64 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-431475b5a5fd0b8a85411d50
Detailed source fields Original source field Published value or condition stable_project_id kproj_5f4da17fccc1f832 stable_project_key prjtDef:234572:ESB project_definition 234572 first_region_code ESB manual_source_format false project_name 154kV 델타분기 전력구 건설사업 project_name_list 부산 강서지역 전기공급시설 전력구공사(델타분기) purpose 에코델타시티 개발에 따른 전력공급 위한 전력구공사 project_region_detail 부산광역시 강서구 project_period_raw 2020.03~2030.04 project_scale_raw SHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5f4da17fccc1f832
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5f4da17fccc1f832
Sources EV-431475b5a5fd0b8a85411d50 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 997531832b542ff549be4eb0bf04c526b9a58228681a71e05db06e9aa20e2a4f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Previous Next