POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 델타S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-31d211252e0cd70925854193
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b68dc23a62d510c0
stable_project_keyprjtDef:231448:ESB
project_definition231448
first_region_codeESB
manual_source_formatfalse
project_name154kV 델타S/S 건설사업
project_name_list154kV 델타S/S 건설사업
purpose에코델타시티내 부하분담 및 공급능력 확보
project_region_detail부산광역시 강서구
project_period_raw
project_scale_rawM.TR(154/23KV 20MVA×3대)×2BANK, 154KV GIS×10CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_da6395bf23de3af5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_b68dc23a62d510c0

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b68dc23a62d510c0

Sources EV-31d211252e0cd70925854193
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 fb761d8420f68489b429017c1571ad1fd18d52559c0ac6ab97f95bafe158cf64
Source snapshots by date · KOR · kepco_planned

154kV 델타S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_da6395bf23de3af5
stable_project_idkproj_b68dc23a62d510c0
source_key202609|231448|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 델타S/S 건설사업
project_name_detail154kV 델타S/S 건설사업
region_summary_raw부산광역시 강서구등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 에코델타시티내 부하분담 및 공급능력 확보
Project region
  • 부산광역시 강서구
Project period
사업 규모
  • M.TR(154/23KV 20MVA×3대)×2BANK, 154KV GIS×10CCT
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
ㅇ '30.04 : 변전소 가압
future_plan_redacted□ 향후계획 ㅇ '30.04 : 변전소 가압
attachment_count0
source_detail_sha256b0c3d08abc3cf35a77f62d83af4d0f626916867a2dc36cafa9e5d6483aeec32c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231448|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_da6395bf23de3af5

Sources EV-00b97dc31770cbda3d8fb818
Evidence SHA-256 b0c3d08abc3cf35a77f62d83af4d0f626916867a2dc36cafa9e5d6483aeec32c
행 SHA-256 2d5b1623bf430a2e35c5a4ad91345f83b4578b53fc502a588b3e48330520ca86
Source snapshots by date · KOR · kepco_planned

154kV 델타S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b68dc23a62d510c0
stable_project_keyprjtDef:231448:ESB
project_definition231448
first_region_codeESB
manual_source_formatfalse
project_name154kV 델타S/S 건설사업
project_name_list154kV 델타S/S 건설사업
purpose에코델타시티내 부하분담 및 공급능력 확보
project_region_detail부산광역시 강서구
project_period_raw
project_scale_rawM.TR(154/23KV 20MVA×3대)×2BANK, 154KV GIS×10CCT
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_da6395bf23de3af5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_b68dc23a62d510c0

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b68dc23a62d510c0

Sources EV-31d211252e0cd70925854193
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 fb761d8420f68489b429017c1571ad1fd18d52559c0ac6ab97f95bafe158cf64

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel