Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 대소원분기T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9d76f4a1aae1c52ac7ae7985
Sources EV-9d76f4a1aae1c52ac7ae7985 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1ab07fe33b22a8ddc9162c41530e6c3abde4e4f90b3322293a9eb0305fd29c72Source snapshots by date · KOR · kepco_planned
154kV 대소원분기T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_b63c13a72922234c
stable_project_id
kproj_e1db47a51ae377b8
source_key
202609|232617|ESB
basic_ym
202609
source_stage_raw
project_name_list
154kV 대소원분기T/L 건설사업
project_name_detail
154kV 대소원분기T/L 건설사업
region_summary_raw
충청북도 충주시등 1 지역
equipment_type_raw
가공송전
headquarters_raw
중부건설본부
office_raw
충북강원건설지사
section_fields
Project purpose
인근지역 개발에 따른 신규 전력공급
Project region
Chungju City, North Chungcheong Province
Project period
사업 규모
ACSR410 * 2B
담당 사업소
중부건설본부/충북강원건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-2d3628156c553639a03a092d Evidence SHA-256 00a045cf639a9f6f71c82181bc70e8be921fd7fe978bce36143fb01911aa5a5f 행 SHA-256 0e9d8043420e52190e79b310779a49a7907f7efdb3ac0df5255925a52dc83868Source snapshots by date · KOR · kepco_planned