POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 대소원분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9d76f4a1aae1c52ac7ae7985
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e1db47a51ae377b8
stable_project_keyprjtDef:232617:ESB
project_definition232617
first_region_codeESB
manual_source_formatfalse
project_name154kV 대소원분기T/L 건설사업
project_name_list154kV 대소원분기T/L 건설사업
purpose인근지역 개발에 따른 신규 전력공급
project_region_detailChungju City, North Chungcheong Province
project_period_raw
project_scale_rawACSR410 * 2B
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_b63c13a72922234c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_e1db47a51ae377b8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e1db47a51ae377b8

Sources EV-9d76f4a1aae1c52ac7ae7985
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1ab07fe33b22a8ddc9162c41530e6c3abde4e4f90b3322293a9eb0305fd29c72
Source snapshots by date · KOR · kepco_planned

154kV 대소원분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b63c13a72922234c
stable_project_idkproj_e1db47a51ae377b8
source_key202609|232617|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 대소원분기T/L 건설사업
project_name_detail154kV 대소원분기T/L 건설사업
region_summary_raw충청북도 충주시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 인근지역 개발에 따른 신규 전력공급
Project region
  • Chungju City, North Chungcheong Province
Project period
사업 규모
  • ACSR410 * 2B
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha25600a045cf639a9f6f71c82181bc70e8be921fd7fe978bce36143fb01911aa5a5f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232617|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b63c13a72922234c

Sources EV-2d3628156c553639a03a092d
Evidence SHA-256 00a045cf639a9f6f71c82181bc70e8be921fd7fe978bce36143fb01911aa5a5f
행 SHA-256 0e9d8043420e52190e79b310779a49a7907f7efdb3ac0df5255925a52dc83868
Source snapshots by date · KOR · kepco_planned

154kV 대소원분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e1db47a51ae377b8
stable_project_keyprjtDef:232617:ESB
project_definition232617
first_region_codeESB
manual_source_formatfalse
project_name154kV 대소원분기T/L 건설사업
project_name_list154kV 대소원분기T/L 건설사업
purpose인근지역 개발에 따른 신규 전력공급
project_region_detailChungju City, North Chungcheong Province
project_period_raw
project_scale_rawACSR410 * 2B
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_b63c13a72922234c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_e1db47a51ae377b8

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e1db47a51ae377b8

Sources EV-9d76f4a1aae1c52ac7ae7985
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1ab07fe33b22a8ddc9162c41530e6c3abde4e4f90b3322293a9eb0305fd29c72

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel