POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 1501–1600 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231576|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231576|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231576|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231576|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231576|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231576|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ac2347301c03f440 stable_project_id kproj_3752d32dd7f5f922 source_key 202609|231576|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 당수변전소 건설사업 project_name_detail 154kV 당수S/S 건설사업 region_summary_raw 경기도 수원시 권선구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2021.09 참여 위원 수 : 13 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.08 ~ 2024.12 기본설계: 2023.01 ~ 2023.03 실시설계: 2024.08 ~ 2024.12 설계담당자: [redacted] [진행경과] □‘21. 7 : 제 9차 장기 송변전설비계획 반영 □‘21.11 : 입지선정실무위원회 결과보고 □‘22. 2 : 입지확정위원회 결과보고 □‘23. 3 : 부지매수 계약체결 □‘23. 5 : 건축허가 완료 □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 관련 협조 요청 (←수원시 기업유치과) □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 추진일정 회신 (→수원시 기업유치과) □‘26. 3 : 변전·토건 실시설계 완료 [향후계획] □‘26. 8 : 토건공사 착공 □‘26. 9 : 변전공사 착공 □‘28.10 : 준공 및 가압 future_plan_redacted □ 향후계획 [진행경과] □‘21. 7 : 제 9차 장기 송변전설비계획 반영 □‘21.11 : 입지선정실무위원회 결과보고 □‘22. 2 : 입지확정위원회 결과보고 □‘23. 3 : 부지매수 계약체결 □‘23. 5 : 건축허가 완료 □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 관련 협조 요청 (←수원시 기업유치과) □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 추진일정 회신 (→수원시 기업유치과) □‘26. 3 : 변전·토건 실시설계 완료 [향후계획] □‘26. 8 : 토건공사 착공 □‘26. 9 : 변전공사 착공 □‘28.10 : 준공 및 가압 attachment_count 0 source_detail_sha256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231576|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac2347301c03f440
Sources EV-4e7bf1cfde5b6e17f8c0e6ae Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1 행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_3752d32dd7f5f922 stable_project_key prjtDef:231576:ESB project_definition 231576 first_region_code ESB manual_source_format false project_name 154kV 당수S/S 건설사업 project_name_list 154kV 당수변전소 건설사업 purpose 수원당수 공공주택지구 신규부하 공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2021.07~2027.10 project_scale_raw 154KV M.TR 60MVA × 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_3752d32dd7f5f922
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_3752d32dd7f5f922
Sources EV-647869cd6d9c1e997e58104f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d868ca5f4631acc93596cbe7f4a145ddcbbb3209c50192cc55f220ccc1b5c2b8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-91bf19e5765404cb21823870
Detailed source fields Original source field Published value or condition stable_project_id kproj_87b5b8d42fb463a1 stable_project_key prjtDef:234649:ESB project_definition 234649 first_region_code ESB manual_source_format false project_name 154kV 당수분기 전력구공사 전력구 건설사업 project_name_list 154kV 당수분기 전력구공사 purpose 수원당수 공공주택지구 신규부하 전력공급능력 확보 project_region_detail 경기도 수원시 권선구 project_period_raw 2022.08~2024.10 project_scale_raw 터널 632M, 전력구 976M responsible_office_raw 경인건설본부/경기건설지사 equipment_type 전력구 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_87b5b8d42fb463a1
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_87b5b8d42fb463a1
Sources EV-91bf19e5765404cb21823870 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 93945263ebf7dba8a3dcba0b38eb71834156c6e5e79261fd10d5d34724b5a7c2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2024-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234649|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_88de12c6bc8f0cbc
Sources EV-9355c302e92a50fd090d5525 Evidence SHA-256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70 행 SHA-256 a6b77b2a5d83ad7d2af2330d7800c350eff640e65dad282d6651e35da23c7045 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234649|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_88de12c6bc8f0cbc
Sources EV-9355c302e92a50fd090d5525 Evidence SHA-256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70 행 SHA-256 a6b77b2a5d83ad7d2af2330d7800c350eff640e65dad282d6651e35da23c7045 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_88de12c6bc8f0cbc stable_project_id kproj_87b5b8d42fb463a1 source_key 202609|234649|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 당수분기 전력구공사 project_name_detail 154kV 당수분기 전력구공사 전력구 건설사업 region_summary_raw 경기도 수원시 권선구등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project purpose 수원당수 공공주택지구 신규부하 전력공급능력 확보 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] ㅁ설계용역착수 : '22.09 ㅁ기본설계심의 : '23.09 ㅁ실시설계심의 : '23.12 ㅁ공사계약 재의뢰 : 25.05(1차) ㅁ수의계약 검토 : 25.11(2차) ㅁ공사 착수 : 26.1(1차), 26.3(2차) future_plan_redacted □ 향후계획 ㅁ설계용역착수 : '22.09 ㅁ기본설계심의 : '23.09 ㅁ실시설계심의 : '23.12 ㅁ공사계약 재의뢰 : 25.05(1차) ㅁ수의계약 검토 : 25.11(2차) ㅁ공사 착수 : 26.1(1차), 26.3(2차) attachment_count 0 source_detail_sha256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234649|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_88de12c6bc8f0cbc
Sources EV-9355c302e92a50fd090d5525 Evidence SHA-256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70 행 SHA-256 a6b77b2a5d83ad7d2af2330d7800c350eff640e65dad282d6651e35da23c7045 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_87b5b8d42fb463a1 stable_project_key prjtDef:234649:ESB project_definition 234649 first_region_code ESB manual_source_format false project_name 154kV 당수분기 전력구공사 전력구 건설사업 project_name_list 154kV 당수분기 전력구공사 purpose 수원당수 공공주택지구 신규부하 전력공급능력 확보 project_region_detail 경기도 수원시 권선구 project_period_raw 2022.08~2024.10 project_scale_raw 터널 632M, 전력구 976M responsible_office_raw 경인건설본부/경기건설지사 equipment_type 전력구 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_87b5b8d42fb463a1
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_87b5b8d42fb463a1
Sources EV-91bf19e5765404cb21823870 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 93945263ebf7dba8a3dcba0b38eb71834156c6e5e79261fd10d5d34724b5a7c2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a0648cf696e5a2bfe857ede4
Detailed source fields Original source field Published value or condition stable_project_id kproj_a460c67c03bff04f stable_project_key prjtDef:232593:ESB project_definition 232593 first_region_code ESB manual_source_format false project_name 154kV 당수분기T/L 건설사업 project_name_list 154kV 당수분기T/L 건설사업 purpose 수원 당수 공공주택지구 신규부하 공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2021.12~2027.10 project_scale_raw STACIR/AW 240 *S*2C,0.5KM,C/T 1기,사각철탑1기 교체 responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a460c67c03bff04f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a460c67c03bff04f
Sources EV-a0648cf696e5a2bfe857ede4 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8c4a8c5f5a6bb41dfa14ea88d55adc79a6fbfc84e81f2e47a465c50be7d0521a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7079abedc9a41cc0 stable_project_id kproj_a460c67c03bff04f source_key 202609|232593|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 당수분기T/L 건설사업 project_name_detail 154kV 당수분기T/L 건설사업 region_summary_raw 경기도 수원시 권선구등 1 지역 equipment_type_raw 가공송전 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 STACIR/AW 240 *S*2C,0.5KM,C/T 1기,사각철탑1기 교체 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.07~2023.09 경과지(부지) 확정: 2023.05 환경/재해 영향평가 환경영향평가: 2024.06 ~ 2025.04 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2024.11 ~ 2024.11 설명회·공청회: 2024.11 자체설명회: [추진실적] □‘21.09 : 제9차 장기 송변전설비계획 반영 □‘23.05 : 경과지 확정 □‘23.07 : 지장유무조회 □‘24.11 : 사업시행계획 열람공고 및 주민설명회 개최, 실시계획승인 신청 □‘25.04 : 실시계획승인신청 및 지자체 협의 [향후계획] □‘26.08 : 공사 착공 □ '27.10 : 공사 준공 future_plan_redacted □ 향후계획 [추진실적] □‘21.09 : 제9차 장기 송변전설비계획 반영 □‘23.05 : 경과지 확정 □‘23.07 : 지장유무조회 □‘24.11 : 사업시행계획 열람공고 및 주민설명회 개최, 실시계획승인 신청 □‘25.04 : 실시계획승인신청 및 지자체 협의 [향후계획] □‘26.08 : 공사 착공 □ '27.10 : 공사 준공 attachment_count 0 source_detail_sha256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232593|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a460c67c03bff04f stable_project_key prjtDef:232593:ESB project_definition 232593 first_region_code ESB manual_source_format false project_name 154kV 당수분기T/L 건설사업 project_name_list 154kV 당수분기T/L 건설사업 purpose 수원 당수 공공주택지구 신규부하 공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2021.12~2027.10 project_scale_raw STACIR/AW 240 *S*2C,0.5KM,C/T 1기,사각철탑1기 교체 responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a460c67c03bff04f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a460c67c03bff04f
Sources EV-a0648cf696e5a2bfe857ede4 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8c4a8c5f5a6bb41dfa14ea88d55adc79a6fbfc84e81f2e47a465c50be7d0521a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5504127c9489c558cbc6d528
Detailed source fields Original source field Published value or condition stable_project_id kproj_a9ff662a8d855b6f stable_project_key prjtDef:231420:ESB project_definition 231420 first_region_code ESB manual_source_format false project_name 154kV 당하(舊검단)S/S 건설사업 project_name_list 154kV 당하S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 인천광역시 검단구 project_period_raw 2015.07~2029.10 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a9ff662a8d855b6f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a9ff662a8d855b6f
Sources EV-5504127c9489c558cbc6d528 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a871ed8ae5e5c0d26846d57fdc4a1d03b387df8f6ddca32e12f6ed05d0449f70 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2029-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2015-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2015-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e22ae015e880dd8b stable_project_id kproj_a9ff662a8d855b6f source_key 202609|231420|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 당하S/S 건설사업 project_name_detail 154kV 당하(舊검단)S/S 건설사업 region_summary_raw 인천광역시 검단구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.01 참여 위원 수 : 15 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○추진실적 □ ‘15.07월 : 송변전설비계획계획 신규반영 (준공목표 : ’25.10) □ ‘21.10월 : 인천검단지구 택지개발사업 지구내 변전소 부지 반영 - 변전소 부지 면적 등 LH 변경 협의 □ ‘24.04월 : 입지선정실무위원회 개최 □ ‘24.12월 : 인천검단지구 지구지정(6차), 개발계획(11차), 실시계획(10차) 변경 알림 □ ‘25.04월 : 부지확정 보고 □ ‘25.12월 : 변전소 명칭 변경(타사업소 중복) : 검단S/S → 당하S/S ○향후계획 □ ‘28. 2: 변전, 토건공사 착공 □ ‘29.10: 변전소 가압 future_plan_redacted □ 향후계획 ○추진실적 □ ‘15.07월 : 송변전설비계획계획 신규반영 (준공목표 : ’25.10) □ ‘21.10월 : 인천검단지구 택지개발사업 지구내 변전소 부지 반영 - 변전소 부지 면적 등 LH 변경 협의 □ ‘24.04월 : 입지선정실무위원회 개최 □ ‘24.12월 : 인천검단지구 지구지정(6차), 개발계획(11차), 실시계획(10차) 변경 알림 □ ‘25.04월 : 부지확정 보고 □ ‘25.12월 : 변전소 명칭 변경(타사업소 중복) : 검단S/S → 당하S/S ○향후계획 □ ‘28. 2: 변전, 토건공사 착공 □ ‘29.10: 변전소 가압 attachment_count 0 source_detail_sha256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231420|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a9ff662a8d855b6f stable_project_key prjtDef:231420:ESB project_definition 231420 first_region_code ESB manual_source_format false project_name 154kV 당하(舊검단)S/S 건설사업 project_name_list 154kV 당하S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 인천광역시 검단구 project_period_raw 2015.07~2029.10 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a9ff662a8d855b6f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a9ff662a8d855b6f
Sources EV-5504127c9489c558cbc6d528 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a871ed8ae5e5c0d26846d57fdc4a1d03b387df8f6ddca32e12f6ed05d0449f70 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7e2878bd4dc833417af2d787
Detailed source fields Original source field Published value or condition stable_project_id kproj_d05c9e3800dc494b stable_project_key prjtDef:231538:ESB project_definition 231538 first_region_code ESB manual_source_format false project_name 154kV 대곡S/S 건설사업 project_name_list 154kV 대곡변전소 건설사업 purpose (일산, 능곡S/S 등) 공급능력 포화 및 부하분담 필요 project_region_detail 경기도 고양시 덕양구 project_period_raw 2025.08~2031.04 project_scale_raw 154KV M.TR(45/60MVA)×2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d05c9e3800dc494b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d05c9e3800dc494b
Sources EV-7e2878bd4dc833417af2d787 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6b3a3ae6a7493e28e72ec2323b91a3da81f3b681e0807a347eb532ac4e09fad0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231538|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b786ea8c1682351
Sources EV-84903a0dba3b6118c3987a6b Evidence SHA-256 13318abb94e6aac9ffb8de33e621010f40386c5da530d5be97ef85e64d5f0cec 행 SHA-256 115bd2bb14e1bfac0c9775600bec132f32608792d965ed01ae248e25996de494 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231538|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b786ea8c1682351
Sources EV-84903a0dba3b6118c3987a6b Evidence SHA-256 13318abb94e6aac9ffb8de33e621010f40386c5da530d5be97ef85e64d5f0cec 행 SHA-256 115bd2bb14e1bfac0c9775600bec132f32608792d965ed01ae248e25996de494 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4b786ea8c1682351 stable_project_id kproj_d05c9e3800dc494b source_key 202609|231538|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 대곡변전소 건설사업 project_name_detail 154kV 대곡S/S 건설사업 region_summary_raw 경기도 고양시 덕양구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project purpose (일산, 능곡S/S 등) 공급능력 포화 및 부하분담 필요 사업 규모 154KV M.TR(45/60MVA)×2BANK 계획확정 제11차 장기송변전설비계획 반영(2025.02) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '25.05 : 제11차 장기 송변전설비계획 반영 [향후계획] □ '26.06 ~ : 사업시행자 부지 관련 협의 future_plan_redacted □ 향후계획 [진행경과] □ '25.05 : 제11차 장기 송변전설비계획 반영 [향후계획] □ '26.06 ~ : 사업시행자 부지 관련 협의 attachment_count 0 source_detail_sha256 13318abb94e6aac9ffb8de33e621010f40386c5da530d5be97ef85e64d5f0cec first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231538|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b786ea8c1682351
Sources EV-84903a0dba3b6118c3987a6b Evidence SHA-256 13318abb94e6aac9ffb8de33e621010f40386c5da530d5be97ef85e64d5f0cec 행 SHA-256 115bd2bb14e1bfac0c9775600bec132f32608792d965ed01ae248e25996de494 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d05c9e3800dc494b stable_project_key prjtDef:231538:ESB project_definition 231538 first_region_code ESB manual_source_format false project_name 154kV 대곡S/S 건설사업 project_name_list 154kV 대곡변전소 건설사업 purpose (일산, 능곡S/S 등) 공급능력 포화 및 부하분담 필요 project_region_detail 경기도 고양시 덕양구 project_period_raw 2025.08~2031.04 project_scale_raw 154KV M.TR(45/60MVA)×2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d05c9e3800dc494b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d05c9e3800dc494b
Sources EV-7e2878bd4dc833417af2d787 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6b3a3ae6a7493e28e72ec2323b91a3da81f3b681e0807a347eb532ac4e09fad0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a8c80f6245f0f5cb36130398
Detailed source fields Original source field Published value or condition stable_project_id kproj_5af77ca6ed07bd8c stable_project_key prjtDef:232761:ESB project_definition 232761 first_region_code ESB manual_source_format false project_name 154kV 대곡분기T/L 건설사업 project_name_list 154kV 대곡분기 송전선로 건설사업 purpose 대곡지구 전력공급 및 인근변전소 부하분담 project_region_detail 경기도 고양시 일산동구 project_period_raw project_scale_raw 154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_5af77ca6ed07bd8c
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5af77ca6ed07bd8c
Sources EV-a8c80f6245f0f5cb36130398 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c9c08ea547559e00951d4c5853c4af6aee8244896e33093461d4d23c9fdabd4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_db40808578ca930b stable_project_id kproj_5af77ca6ed07bd8c source_key 202609|232761|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 대곡분기 송전선로 건설사업 project_name_detail 154kV 대곡분기T/L 건설사업 region_summary_raw 경기도 고양시 일산동구등 1 지역 equipment_type_raw 가공송전 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 f8fd2865803f48a5238339995ce567c743906d99d273bbad13ea2a45b517fc3a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232761|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_db40808578ca930b
Sources EV-aad14c4413d6da0944f34746 Evidence SHA-256 f8fd2865803f48a5238339995ce567c743906d99d273bbad13ea2a45b517fc3a 행 SHA-256 eab526ee32f0e0237af7637e44453029ac27fb476c832a453710cee1dc18f725 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5af77ca6ed07bd8c stable_project_key prjtDef:232761:ESB project_definition 232761 first_region_code ESB manual_source_format false project_name 154kV 대곡분기T/L 건설사업 project_name_list 154kV 대곡분기 송전선로 건설사업 purpose 대곡지구 전력공급 및 인근변전소 부하분담 project_region_detail 경기도 고양시 일산동구 project_period_raw project_scale_raw 154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_5af77ca6ed07bd8c
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5af77ca6ed07bd8c
Sources EV-a8c80f6245f0f5cb36130398 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c9c08ea547559e00951d4c5853c4af6aee8244896e33093461d4d23c9fdabd4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-c22ed6bf3788feea88093617
Detailed source fields Original source field Published value or condition stable_project_id kproj_2c69ea716cd3e747 stable_project_key prjtDef:231446:ESB project_definition 231446 first_region_code ESB manual_source_format false project_name 154kV 대산개폐소 건설사업 project_name_list 154kV 대산개폐소 건설사업 purpose 대산석유화학단지 전력공급 능력 확충 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2020.10~2025.10 project_scale_raw 154KV GIS 10CCT responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_2c69ea716cd3e747
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2c69ea716cd3e747
Sources EV-c22ed6bf3788feea88093617 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b478e74ae2c2f4be371cc849016692ae842aa298c0ce3c9a9f3896d809372d08 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231446|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_dab37e47ca0217b5
Sources EV-53788ec6c714762db5cb81f8 Evidence SHA-256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1 행 SHA-256 7d0fbd24062042fe1e809f30d653eff29c0ee3f73b8c4b901551840ef9cb437a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231446|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_dab37e47ca0217b5
Sources EV-53788ec6c714762db5cb81f8 Evidence SHA-256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1 행 SHA-256 7d0fbd24062042fe1e809f30d653eff29c0ee3f73b8c4b901551840ef9cb437a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_dab37e47ca0217b5 stable_project_id kproj_2c69ea716cd3e747 source_key 202609|231446|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 대산개폐소 건설사업 project_name_detail 154kV 대산개폐소 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Seosan City, South Chungcheong Province 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.11 공사 기간: 2023.11 ~ 2025.10 감독자: [redacted], 실적): 100, 74 □ ‘18.11 ∼ 20.12 : 부지확정, 대관 인·허가, 민원협의 □ ’21.01 : 전원개발사업 실시계획 승인신청 □ ’22.06 : 적정성 검토 완료(준공목표 변경 완료 : ‘22.10 → ’23.10) □ ’22.10 : 전원개발사업실시계획 승인(산업자원부고시 제2022-171호) □ ’23.11 : 적정성 검토 요청(준공목표 변경 요청 : ‘23.10 → ’25.10) □ ’24.02 : 토목공사 착공 □ ' 24.07 : 변전공사 실착공 □ ’25.01 : 170kV GIS 설치공사 착공 □ ’25.05 : 보호배전반 및 일반도급공사 시공 중 □ ’25.10 : 실부하가압 완료 future_plan_redacted □ 향후계획 □ ‘18.11 ∼ 20.12 : 부지확정, 대관 인·허가, 민원협의 □ ’21.01 : 전원개발사업 실시계획 승인신청 □ ’22.06 : 적정성 검토 완료(준공목표 변경 완료 : ‘22.10 → ’23.10) □ ’22.10 : 전원개발사업실시계획 승인(산업자원부고시 제2022-171호) □ ’23.11 : 적정성 검토 요청(준공목표 변경 요청 : ‘23.10 → ’25.10) □ ’24.02 : 토목공사 착공 □ ' 24.07 : 변전공사 실착공 □ ’25.01 : 170kV GIS 설치공사 착공 □ ’25.05 : 보호배전반 및 일반도급공사 시공 중 □ ’25.10 : 실부하가압 완료 attachment_count 0 source_detail_sha256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231446|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_dab37e47ca0217b5
Sources EV-53788ec6c714762db5cb81f8 Evidence SHA-256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1 행 SHA-256 7d0fbd24062042fe1e809f30d653eff29c0ee3f73b8c4b901551840ef9cb437a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2c69ea716cd3e747 stable_project_key prjtDef:231446:ESB project_definition 231446 first_region_code ESB manual_source_format false project_name 154kV 대산개폐소 건설사업 project_name_list 154kV 대산개폐소 건설사업 purpose 대산석유화학단지 전력공급 능력 확충 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2020.10~2025.10 project_scale_raw 154KV GIS 10CCT responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_2c69ea716cd3e747
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2c69ea716cd3e747
Sources EV-c22ed6bf3788feea88093617 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b478e74ae2c2f4be371cc849016692ae842aa298c0ce3c9a9f3896d809372d08 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-c3cb04afb82bc5dc1611cb9e
Detailed source fields Original source field Published value or condition stable_project_id kproj_d99caedd9fac17de stable_project_key prjtDef:234734:ESB project_definition 234734 first_region_code ESB manual_source_format false project_name 154kV 대산개폐소-신대산 전력구 건설사업 project_name_list 서산지역 전기공급시설 전력구공사(대산개폐소-신대산) purpose 서산지역 재생E 연계를 위한 계통보강 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2025.06~2030.11 project_scale_raw 154KV XLPE 2500X2C, L=0.7KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_d99caedd9fac17de
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d99caedd9fac17de
Sources EV-c3cb04afb82bc5dc1611cb9e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9b58cc0db667dc30b62ec34e59af1ca93b8c70b9b7fae039c391492aecd865e3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234734|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0f53cd9443a3ff7f
Sources EV-d022e3756b6a93e6d86f5e36 Evidence SHA-256 576ab3444a89fc6d54a3dcd6cb29515c9bf8445450481a96b077b125093012d8 행 SHA-256 6ad4d13cc107b92aa7fe0db202f6f5dd7bdf905fe67b1d10acb010f627db019a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234734|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0f53cd9443a3ff7f
Sources EV-d022e3756b6a93e6d86f5e36 Evidence SHA-256 576ab3444a89fc6d54a3dcd6cb29515c9bf8445450481a96b077b125093012d8 행 SHA-256 6ad4d13cc107b92aa7fe0db202f6f5dd7bdf905fe67b1d10acb010f627db019a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0f53cd9443a3ff7f stable_project_id kproj_d99caedd9fac17de source_key 202609|234734|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 서산지역 전기공급시설 전력구공사(대산개폐소-신대산) project_name_detail 154kV 대산개폐소-신대산 전력구 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Seosan City, South Chungcheong Province 사업 규모 154KV XLPE 2500X2C, L=0.7KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] -23.05 제 10차 장기 송변전설비계획 수립 -25.04 신설 송전선로 지중화 심의위원회 결과보고 -25.05 제 11차 장기 송변전설비계획 수립(지중화 물량 반영) -26.01 현장답사 분석결과 보고 -26.01 기본계획 수립 future_plan_redacted □ 향후계획 -23.05 제 10차 장기 송변전설비계획 수립 -25.04 신설 송전선로 지중화 심의위원회 결과보고 -25.05 제 11차 장기 송변전설비계획 수립(지중화 물량 반영) -26.01 현장답사 분석결과 보고 -26.01 기본계획 수립 attachment_count 0 source_detail_sha256 576ab3444a89fc6d54a3dcd6cb29515c9bf8445450481a96b077b125093012d8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234734|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0f53cd9443a3ff7f
Sources EV-d022e3756b6a93e6d86f5e36 Evidence SHA-256 576ab3444a89fc6d54a3dcd6cb29515c9bf8445450481a96b077b125093012d8 행 SHA-256 6ad4d13cc107b92aa7fe0db202f6f5dd7bdf905fe67b1d10acb010f627db019a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d99caedd9fac17de stable_project_key prjtDef:234734:ESB project_definition 234734 first_region_code ESB manual_source_format false project_name 154kV 대산개폐소-신대산 전력구 건설사업 project_name_list 서산지역 전기공급시설 전력구공사(대산개폐소-신대산) purpose 서산지역 재생E 연계를 위한 계통보강 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2025.06~2030.11 project_scale_raw 154KV XLPE 2500X2C, L=0.7KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_d99caedd9fac17de
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d99caedd9fac17de
Sources EV-c3cb04afb82bc5dc1611cb9e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9b58cc0db667dc30b62ec34e59af1ca93b8c70b9b7fae039c391492aecd865e3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-df6219f578ba9fb9128528e6
Detailed source fields Original source field Published value or condition stable_project_id kproj_2cf29a75712fbc35 stable_project_key prjtDef:232529:ESB project_definition 232529 first_region_code ESB manual_source_format false project_name 154kV 대산개폐소분기T/L 건설사업 project_name_list 154kV 대산개폐소분기T/L 건설사업 purpose 신규부하(대산석유화학단지)공급 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2025.10 project_scale_raw HSTACIR/AW 330㎟ × S × 2C × 0.38KM responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_2cf29a75712fbc35
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2cf29a75712fbc35
Sources EV-df6219f578ba9fb9128528e6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d9551db2f06e6af25af052f09573cd6f018fbed7ae2900b3cd977c3fcb9f89f0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2022-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2021-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2019-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2019-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2022-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2022-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232529|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_03d38bc8d86b56f2
Sources EV-09baca188aa30e2eae97bf7b Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649 행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e Observations for this power asset History for this project Previous Next