POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 대산개폐소 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c22ed6bf3788feea88093617
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2c69ea716cd3e747
stable_project_keyprjtDef:231446:ESB
project_definition231446
first_region_codeESB
manual_source_formatfalse
project_name154kV 대산개폐소 건설사업
project_name_list154kV 대산개폐소 건설사업
purpose대산석유화학단지 전력공급 능력 확충
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2020.10~2025.10
project_scale_raw154KV GIS 10CCT
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_dab37e47ca0217b5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_2c69ea716cd3e747

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2c69ea716cd3e747

Sources EV-c22ed6bf3788feea88093617
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b478e74ae2c2f4be371cc849016692ae842aa298c0ce3c9a9f3896d809372d08
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231446|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_dab37e47ca0217b5

Sources EV-53788ec6c714762db5cb81f8
Evidence SHA-256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1
행 SHA-256 7d0fbd24062042fe1e809f30d653eff29c0ee3f73b8c4b901551840ef9cb437a
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231446|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_dab37e47ca0217b5

Sources EV-53788ec6c714762db5cb81f8
Evidence SHA-256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1
행 SHA-256 7d0fbd24062042fe1e809f30d653eff29c0ee3f73b8c4b901551840ef9cb437a
Source snapshots by date · KOR · kepco_planned

154kV 대산개폐소 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_dab37e47ca0217b5
stable_project_idkproj_2c69ea716cd3e747
source_key202609|231446|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 대산개폐소 건설사업
project_name_detail154kV 대산개폐소 건설사업
region_summary_raw충청남도 서산시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 대산석유화학단지 전력공급 능력 확충
Project region
  • Seosan City, South Chungcheong Province
Project period
  • 2020.10~2025.10
사업 규모
  • 154KV GIS 10CCT
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.11 공사 기간: 2023.11 ~ 2025.10 감독자: [redacted], 실적): 100, 74
□ ‘18.11 ∼ 20.12 : 부지확정, 대관 인·허가, 민원협의 □ ’21.01 : 전원개발사업 실시계획 승인신청 □ ’22.06 : 적정성 검토 완료(준공목표 변경 완료 : ‘22.10 → ’23.10) □ ’22.10 : 전원개발사업실시계획 승인(산업자원부고시 제2022-171호) □ ’23.11 : 적정성 검토 요청(준공목표 변경 요청 : ‘23.10 → ’25.10) □ ’24.02 : 토목공사 착공 □ ' 24.07 : 변전공사 실착공 □ ’25.01 : 170kV GIS 설치공사 착공 □ ’25.05 : 보호배전반 및 일반도급공사 시공 중 □ ’25.10 : 실부하가압 완료
future_plan_redacted□ 향후계획 □ ‘18.11 ∼ 20.12 : 부지확정, 대관 인·허가, 민원협의 □ ’21.01 : 전원개발사업 실시계획 승인신청 □ ’22.06 : 적정성 검토 완료(준공목표 변경 완료 : ‘22.10 → ’23.10) □ ’22.10 : 전원개발사업실시계획 승인(산업자원부고시 제2022-171호) □ ’23.11 : 적정성 검토 요청(준공목표 변경 요청 : ‘23.10 → ’25.10) □ ’24.02 : 토목공사 착공 □ ' 24.07 : 변전공사 실착공 □ ’25.01 : 170kV GIS 설치공사 착공 □ ’25.05 : 보호배전반 및 일반도급공사 시공 중 □ ’25.10 : 실부하가압 완료
attachment_count0
source_detail_sha256ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231446|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_dab37e47ca0217b5

Sources EV-53788ec6c714762db5cb81f8
Evidence SHA-256 ee9a6d04597c4a94975f0827c8b8c1bc8c58972173c09bc0818454d737259ee1
행 SHA-256 7d0fbd24062042fe1e809f30d653eff29c0ee3f73b8c4b901551840ef9cb437a
Source snapshots by date · KOR · kepco_planned

154kV 대산개폐소 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2c69ea716cd3e747
stable_project_keyprjtDef:231446:ESB
project_definition231446
first_region_codeESB
manual_source_formatfalse
project_name154kV 대산개폐소 건설사업
project_name_list154kV 대산개폐소 건설사업
purpose대산석유화학단지 전력공급 능력 확충
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2020.10~2025.10
project_scale_raw154KV GIS 10CCT
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_dab37e47ca0217b5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_2c69ea716cd3e747

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2c69ea716cd3e747

Sources EV-c22ed6bf3788feea88093617
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b478e74ae2c2f4be371cc849016692ae842aa298c0ce3c9a9f3896d809372d08

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel