POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 15items · current page 1–15 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5504127c9489c558cbc6d528
Detailed source fields Original source field Published value or condition stable_project_id kproj_a9ff662a8d855b6f stable_project_key prjtDef:231420:ESB project_definition 231420 first_region_code ESB manual_source_format false project_name 154kV 당하(舊검단)S/S 건설사업 project_name_list 154kV 당하S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 인천광역시 검단구 project_period_raw 2015.07~2029.10 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a9ff662a8d855b6f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a9ff662a8d855b6f
Sources EV-5504127c9489c558cbc6d528 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a871ed8ae5e5c0d26846d57fdc4a1d03b387df8f6ddca32e12f6ed05d0449f70 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2029-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2015-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2015-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231420|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e22ae015e880dd8b stable_project_id kproj_a9ff662a8d855b6f source_key 202609|231420|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 당하S/S 건설사업 project_name_detail 154kV 당하(舊검단)S/S 건설사업 region_summary_raw 인천광역시 검단구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.01 참여 위원 수 : 15 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○추진실적 □ ‘15.07월 : 송변전설비계획계획 신규반영 (준공목표 : ’25.10) □ ‘21.10월 : 인천검단지구 택지개발사업 지구내 변전소 부지 반영 - 변전소 부지 면적 등 LH 변경 협의 □ ‘24.04월 : 입지선정실무위원회 개최 □ ‘24.12월 : 인천검단지구 지구지정(6차), 개발계획(11차), 실시계획(10차) 변경 알림 □ ‘25.04월 : 부지확정 보고 □ ‘25.12월 : 변전소 명칭 변경(타사업소 중복) : 검단S/S → 당하S/S ○향후계획 □ ‘28. 2: 변전, 토건공사 착공 □ ‘29.10: 변전소 가압 future_plan_redacted □ 향후계획 ○추진실적 □ ‘15.07월 : 송변전설비계획계획 신규반영 (준공목표 : ’25.10) □ ‘21.10월 : 인천검단지구 택지개발사업 지구내 변전소 부지 반영 - 변전소 부지 면적 등 LH 변경 협의 □ ‘24.04월 : 입지선정실무위원회 개최 □ ‘24.12월 : 인천검단지구 지구지정(6차), 개발계획(11차), 실시계획(10차) 변경 알림 □ ‘25.04월 : 부지확정 보고 □ ‘25.12월 : 변전소 명칭 변경(타사업소 중복) : 검단S/S → 당하S/S ○향후계획 □ ‘28. 2: 변전, 토건공사 착공 □ ‘29.10: 변전소 가압 attachment_count 0 source_detail_sha256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231420|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e22ae015e880dd8b
Sources EV-fef53ba00214664c05d7a6d6 Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043 행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a9ff662a8d855b6f stable_project_key prjtDef:231420:ESB project_definition 231420 first_region_code ESB manual_source_format false project_name 154kV 당하(舊검단)S/S 건설사업 project_name_list 154kV 당하S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 인천광역시 검단구 project_period_raw 2015.07~2029.10 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a9ff662a8d855b6f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a9ff662a8d855b6f
Sources EV-5504127c9489c558cbc6d528 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a871ed8ae5e5c0d26846d57fdc4a1d03b387df8f6ddca32e12f6ed05d0449f70 Observations for this power asset History for this project