POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 15items · current page 1–15 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-5504127c9489c558cbc6d528
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a9ff662a8d855b6f
stable_project_keyprjtDef:231420:ESB
project_definition231420
first_region_codeESB
manual_source_formatfalse
project_name154kV 당하(舊검단)S/S 건설사업
project_name_list154kV 당하S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail인천광역시 검단구
project_period_raw2015.07~2029.10
project_scale_raw154KV M.TR 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e22ae015e880dd8b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_a9ff662a8d855b6f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a9ff662a8d855b6f

Sources EV-5504127c9489c558cbc6d528
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 a871ed8ae5e5c0d26846d57fdc4a1d03b387df8f6ddca32e12f6ed05d0449f70
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2029-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2015-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source schedule candidates · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2015-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231420|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source snapshots by date · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e22ae015e880dd8b
stable_project_idkproj_a9ff662a8d855b6f
source_key202609|231420|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 당하S/S 건설사업
project_name_detail154kV 당하(舊검단)S/S 건설사업
region_summary_raw인천광역시 검단구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 인천광역시 검단구
Project period
  • 2015.07~2029.10
사업 규모
  • 154KV M.TR 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.01 참여 위원 수 : 15 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○추진실적 □ ‘15.07월 : 송변전설비계획계획 신규반영 (준공목표 : ’25.10) □ ‘21.10월 : 인천검단지구 택지개발사업 지구내 변전소 부지 반영 - 변전소 부지 면적 등 LH 변경 협의 □ ‘24.04월 : 입지선정실무위원회 개최 □ ‘24.12월 : 인천검단지구 지구지정(6차), 개발계획(11차), 실시계획(10차) 변경 알림 □ ‘25.04월 : 부지확정 보고 □ ‘25.12월 : 변전소 명칭 변경(타사업소 중복) : 검단S/S → 당하S/S ○향후계획 □ ‘28. 2: 변전, 토건공사 착공 □ ‘29.10: 변전소 가압
future_plan_redacted□ 향후계획 ○추진실적 □ ‘15.07월 : 송변전설비계획계획 신규반영 (준공목표 : ’25.10) □ ‘21.10월 : 인천검단지구 택지개발사업 지구내 변전소 부지 반영 - 변전소 부지 면적 등 LH 변경 협의 □ ‘24.04월 : 입지선정실무위원회 개최 □ ‘24.12월 : 인천검단지구 지구지정(6차), 개발계획(11차), 실시계획(10차) 변경 알림 □ ‘25.04월 : 부지확정 보고 □ ‘25.12월 : 변전소 명칭 변경(타사업소 중복) : 검단S/S → 당하S/S ○향후계획 □ ‘28. 2: 변전, 토건공사 착공 □ ‘29.10: 변전소 가압
attachment_count0
source_detail_sha256ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231420|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e22ae015e880dd8b

Sources EV-fef53ba00214664c05d7a6d6
Evidence SHA-256 ac14fb17da3cf9bc8e1f88008eab5df371d99fc7094d4e666b19e22731bb3043
행 SHA-256 5b3613d0cd4c507598609df996e472014ab9eb9106965aca0abbb32554dd8fb7
Source snapshots by date · KOR · kepco_planned

154kV 당하(舊검단)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a9ff662a8d855b6f
stable_project_keyprjtDef:231420:ESB
project_definition231420
first_region_codeESB
manual_source_formatfalse
project_name154kV 당하(舊검단)S/S 건설사업
project_name_list154kV 당하S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail인천광역시 검단구
project_period_raw2015.07~2029.10
project_scale_raw154KV M.TR 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e22ae015e880dd8b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_a9ff662a8d855b6f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a9ff662a8d855b6f

Sources EV-5504127c9489c558cbc6d528
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 a871ed8ae5e5c0d26846d57fdc4a1d03b387df8f6ddca32e12f6ed05d0449f70

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel