POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 55items · current page 1–55 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-df6219f578ba9fb9128528e6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2cf29a75712fbc35
stable_project_keyprjtDef:232529:ESB
project_definition232529
first_region_codeESB
manual_source_formatfalse
project_name154kV 대산개폐소분기T/L 건설사업
project_name_list154kV 대산개폐소분기T/L 건설사업
purpose신규부하(대산석유화학단지)공급
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2018.06~2025.10
project_scale_rawHSTACIR/AW 330㎟ × S × 2C × 0.38KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_03d38bc8d86b56f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_2cf29a75712fbc35

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2cf29a75712fbc35

Sources EV-df6219f578ba9fb9128528e6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d9551db2f06e6af25af052f09573cd6f018fbed7ae2900b3cd977c3fcb9f89f0
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2022-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2021-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2022-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2022-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2021-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source schedule candidates · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232529|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source snapshots by date · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_03d38bc8d86b56f2
stable_project_idkproj_2cf29a75712fbc35
source_key202609|232529|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 대산개폐소분기T/L 건설사업
project_name_detail154kV 대산개폐소분기T/L 건설사업
region_summary_raw충청남도 서산시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 신규부하(대산석유화학단지)공급
Project region
  • Seosan City, South Chungcheong Province
Project period
  • 2018.06~2025.10
사업 규모
  • HSTACIR/AW 330㎟ × S × 2C × 0.38KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2019.02~2019.03 경과지(부지) 확정: 2019.06
환경/재해 영향평가
  • 환경영향평가: 2019.12 ~ 2022.12 재해영향평가: 2019.12 ~ 2022.12
주민의견 수렴
  • 지자체 공고 열람: 2020.10 ~ 2020.11 설명회·공청회: 2020.11 자체설명회: 2019.06 ~ 2020.02
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.03 ~ 2022.06 실시설계: 2022.06 ~ 2022.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.09 공사 기간: 2024.09 ~ 2025.12 감독자: [redacted], 실적): 100, 57
□ 진행경과 -'18.06 : 제8차 장기 송변전설비계획 반영 -'18.11 : 입지선정실무위원회 착수회의 시행 -'19.02 : 지장유무조회(->서산시청) -'19.03 : 토지소유주 사업계획 안내 및 보상협의 시행 -'19.06 : 154kV 대산개폐소 및 연관 송전선로 건설사업 입지확정위원회 심의(원안가결) -'20.02 : 마을주민 대상 사전 사업설명회 시행 -'20.04 : 설계측량 용역 계약 및 측량 시행 -'20.07 : 상생발전협의체 구성·운영 시행 -'20.08 : 공동협력 상생발전협약 체결, 회의시행 -'20.11 : 사업시행계획 공고 및 주민설명회 시행 -'21.03 : 전원개발사업 실시계획 승인신청 -'21.06 : 실시계획 승인신청에 따른 관계기관 협의 -'21.10 : 산지전용허가 협의 완료 -'21.11 : 중토위 협의 완료 -'21.12 : 농지전용허가 협의 완료 -'22.04 : 기본설계 확정 및 보고 -'22.06 : 준공목표변경('22.10->'23.10) -'22.10 : 실시계획 승인 -'22.11 : 실시설계 완료 -'23.03 : 도급공사 및 감리용역 계약 -'24.05 : 준공목표 변경('23.10->'25.10) -'24.08 : 시공측량 완료 및 착공 전 안전회의 시행 -'24.09 : 공사착공_진입로 및 기타 부지 개설 -'24.10 : 철탑기초 설치 -'24.11~12 : 철탑 조립 및 연·긴선 작업 -'25.10 휴전작업 및 가압완료 □ 향후계획 -'25.12 : 준공
future_plan_redacted□ 향후계획 □ 진행경과 -'18.06 : 제8차 장기 송변전설비계획 반영 -'18.11 : 입지선정실무위원회 착수회의 시행 -'19.02 : 지장유무조회(->서산시청) -'19.03 : 토지소유주 사업계획 안내 및 보상협의 시행 -'19.06 : 154kV 대산개폐소 및 연관 송전선로 건설사업 입지확정위원회 심의(원안가결) -'20.02 : 마을주민 대상 사전 사업설명회 시행 -'20.04 : 설계측량 용역 계약 및 측량 시행 -'20.07 : 상생발전협의체 구성·운영 시행 -'20.08 : 공동협력 상생발전협약 체결, 회의시행 -'20.11 : 사업시행계획 공고 및 주민설명회 시행 -'21.03 : 전원개발사업 실시계획 승인신청 -'21.06 : 실시계획 승인신청에 따른 관계기관 협의 -'21.10 : 산지전용허가 협의 완료 -'21.11 : 중토위 협의 완료 -'21.12 : 농지전용허가 협의 완료 -'22.04 : 기본설계 확정 및 보고 -'22.06 : 준공목표변경('22.10->'23.10) -'22.10 : 실시계획 승인 -'22.11 : 실시설계 완료 -'23.03 : 도급공사 및 감리용역 계약 -'24.05 : 준공목표 변경('23.10->'25.10) -'24.08 : 시공측량 완료 및 착공 전 안전회의 시행 -'24.09 : 공사착공_진입로 및 기타 부지 개설 -'24.10 : 철탑기초 설치 -'24.11~12 : 철탑 조립 및 연·긴선 작업 -'25.10 휴전작업 및 가압완료 □ 향후계획 -'25.12 : 준공
attachment_count0
source_detail_sha2568a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232529|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_03d38bc8d86b56f2

Sources EV-09baca188aa30e2eae97bf7b
Evidence SHA-256 8a07f55e83d5920d630b85b6bc2d92dac611d9d958c612d44f71c6d7a6130649
행 SHA-256 ab27b6c562484e5ec2bfca18666dc5171b64bcd8a9dcad6bb4c78aad815e3a0e
Source snapshots by date · KOR · kepco_planned

154kV 대산개폐소분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2cf29a75712fbc35
stable_project_keyprjtDef:232529:ESB
project_definition232529
first_region_codeESB
manual_source_formatfalse
project_name154kV 대산개폐소분기T/L 건설사업
project_name_list154kV 대산개폐소분기T/L 건설사업
purpose신규부하(대산석유화학단지)공급
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2018.06~2025.10
project_scale_rawHSTACIR/AW 330㎟ × S × 2C × 0.38KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_03d38bc8d86b56f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_2cf29a75712fbc35

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2cf29a75712fbc35

Sources EV-df6219f578ba9fb9128528e6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d9551db2f06e6af25af052f09573cd6f018fbed7ae2900b3cd977c3fcb9f89f0

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.