POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 16items · current page 1–16 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 당수S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-647869cd6d9c1e997e58104f
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_3752d32dd7f5f922
stable_project_keyprjtDef:231576:ESB
project_definition231576
first_region_codeESB
manual_source_formatfalse
project_name154kV 당수S/S 건설사업
project_name_list154kV 당수변전소 건설사업
purpose수원당수 공공주택지구 신규부하 공급
project_region_detail경기도 수원시 권선구
project_period_raw2021.07~2027.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ac2347301c03f440
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_3752d32dd7f5f922

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_3752d32dd7f5f922

Sources EV-647869cd6d9c1e997e58104f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d868ca5f4631acc93596cbe7f4a145ddcbbb3209c50192cc55f220ccc1b5c2b8
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2021-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source schedule candidates · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231576|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source snapshots by date · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ac2347301c03f440
stable_project_idkproj_3752d32dd7f5f922
source_key202609|231576|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 당수변전소 건설사업
project_name_detail154kV 당수S/S 건설사업
region_summary_raw경기도 수원시 권선구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 수원당수 공공주택지구 신규부하 공급
Project region
  • 경기도 수원시 권선구
Project period
  • 2021.07~2027.10
사업 규모
  • 154KV M.TR 60MVA × 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2021.09 참여 위원 수 : 13 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.08 ~ 2024.12 기본설계: 2023.01 ~ 2023.03 실시설계: 2024.08 ~ 2024.12 설계담당자: [redacted]
[진행경과] □‘21. 7 : 제 9차 장기 송변전설비계획 반영 □‘21.11 : 입지선정실무위원회 결과보고 □‘22. 2 : 입지확정위원회 결과보고 □‘23. 3 : 부지매수 계약체결 □‘23. 5 : 건축허가 완료 □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 관련 협조 요청 (←수원시 기업유치과) □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 추진일정 회신 (→수원시 기업유치과) □‘26. 3 : 변전·토건 실시설계 완료 [향후계획] □‘26. 8 : 토건공사 착공 □‘26. 9 : 변전공사 착공 □‘28.10 : 준공 및 가압
future_plan_redacted□ 향후계획 [진행경과] □‘21. 7 : 제 9차 장기 송변전설비계획 반영 □‘21.11 : 입지선정실무위원회 결과보고 □‘22. 2 : 입지확정위원회 결과보고 □‘23. 3 : 부지매수 계약체결 □‘23. 5 : 건축허가 완료 □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 관련 협조 요청 (←수원시 기업유치과) □‘24. 1 : 수원당수 공공주택지구 내 전기공급설비 추진일정 회신 (→수원시 기업유치과) □‘26. 3 : 변전·토건 실시설계 완료 [향후계획] □‘26. 8 : 토건공사 착공 □‘26. 9 : 변전공사 착공 □‘28.10 : 준공 및 가압
attachment_count0
source_detail_sha256785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231576|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ac2347301c03f440

Sources EV-4e7bf1cfde5b6e17f8c0e6ae
Evidence SHA-256 785f2710d898d3c3a235309e8a49fe2dc0e9c4283b0cb8915abe9c327af43ce1
행 SHA-256 14dfe50a5ca73b58404925781858a516df61ec544cc325da027c43dbda20be49
Source snapshots by date · KOR · kepco_planned

154kV 당수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_3752d32dd7f5f922
stable_project_keyprjtDef:231576:ESB
project_definition231576
first_region_codeESB
manual_source_formatfalse
project_name154kV 당수S/S 건설사업
project_name_list154kV 당수변전소 건설사업
purpose수원당수 공공주택지구 신규부하 공급
project_region_detail경기도 수원시 권선구
project_period_raw2021.07~2027.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ac2347301c03f440
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_3752d32dd7f5f922

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_3752d32dd7f5f922

Sources EV-647869cd6d9c1e997e58104f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d868ca5f4631acc93596cbe7f4a145ddcbbb3209c50192cc55f220ccc1b5c2b8

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel