Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 대곡분기T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a8c80f6245f0f5cb36130398
Sources EV-a8c80f6245f0f5cb36130398 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1c9c08ea547559e00951d4c5853c4af6aee8244896e33093461d4d23c9fdabd4Source snapshots by date · KOR · kepco_planned
154kV 대곡분기T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_db40808578ca930b
stable_project_id
kproj_5af77ca6ed07bd8c
source_key
202609|232761|ESB
basic_ym
202609
source_stage_raw
project_name_list
154kV 대곡분기 송전선로 건설사업
project_name_detail
154kV 대곡분기T/L 건설사업
region_summary_raw
경기도 고양시 일산동구등 1 지역
equipment_type_raw
가공송전
headquarters_raw
경인건설본부
office_raw
직할
section_fields
Project purpose
대곡지구 전력공급 및 인근변전소 부하분담
Project region
경기도 고양시 일산동구
Project period
사업 규모
154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM
담당 사업소
경인건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-aad14c4413d6da0944f34746 Evidence SHA-256 f8fd2865803f48a5238339995ce567c743906d99d273bbad13ea2a45b517fc3a 행 SHA-256 eab526ee32f0e0237af7637e44453029ac27fb476c832a453710cee1dc18f725Source snapshots by date · KOR · kepco_planned