Power assets and projects · KOR · kepco_planned

154kV 대곡분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-a8c80f6245f0f5cb36130398
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5af77ca6ed07bd8c
stable_project_keyprjtDef:232761:ESB
project_definition232761
first_region_codeESB
manual_source_formatfalse
project_name154kV 대곡분기T/L 건설사업
project_name_list154kV 대곡분기 송전선로 건설사업
purpose대곡지구 전력공급 및 인근변전소 부하분담
project_region_detail경기도 고양시 일산동구
project_period_raw
project_scale_raw154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_db40808578ca930b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_5af77ca6ed07bd8c

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5af77ca6ed07bd8c

Sources EV-a8c80f6245f0f5cb36130398
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c9c08ea547559e00951d4c5853c4af6aee8244896e33093461d4d23c9fdabd4
Source snapshots by date · KOR · kepco_planned

154kV 대곡분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_db40808578ca930b
stable_project_idkproj_5af77ca6ed07bd8c
source_key202609|232761|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 대곡분기 송전선로 건설사업
project_name_detail154kV 대곡분기T/L 건설사업
region_summary_raw경기도 고양시 일산동구등 1 지역
equipment_type_raw가공송전
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 대곡지구 전력공급 및 인근변전소 부하분담
Project region
  • 경기도 고양시 일산동구
Project period
사업 규모
  • 154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha256f8fd2865803f48a5238339995ce567c743906d99d273bbad13ea2a45b517fc3a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232761|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_db40808578ca930b

Sources EV-aad14c4413d6da0944f34746
Evidence SHA-256 f8fd2865803f48a5238339995ce567c743906d99d273bbad13ea2a45b517fc3a
행 SHA-256 eab526ee32f0e0237af7637e44453029ac27fb476c832a453710cee1dc18f725
Source snapshots by date · KOR · kepco_planned

154kV 대곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5af77ca6ed07bd8c
stable_project_keyprjtDef:232761:ESB
project_definition232761
first_region_codeESB
manual_source_formatfalse
project_name154kV 대곡분기T/L 건설사업
project_name_list154kV 대곡분기 송전선로 건설사업
purpose대곡지구 전력공급 및 인근변전소 부하분담
project_region_detail경기도 고양시 일산동구
project_period_raw
project_scale_raw154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_db40808578ca930b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_5af77ca6ed07bd8c

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5af77ca6ed07bd8c

Sources EV-a8c80f6245f0f5cb36130398
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c9c08ea547559e00951d4c5853c4af6aee8244896e33093461d4d23c9fdabd4

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel