POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 당수분기 전력구공사 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-91bf19e5765404cb21823870
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_87b5b8d42fb463a1
stable_project_keyprjtDef:234649:ESB
project_definition234649
first_region_codeESB
manual_source_formatfalse
project_name154kV 당수분기 전력구공사 전력구 건설사업
project_name_list154kV 당수분기 전력구공사
purpose수원당수 공공주택지구 신규부하 전력공급능력 확보
project_region_detail경기도 수원시 권선구
project_period_raw2022.08~2024.10
project_scale_raw터널 632M, 전력구 976M
responsible_office_raw경인건설본부/경기건설지사
equipment_type전력구
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_88de12c6bc8f0cbc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_87b5b8d42fb463a1

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_87b5b8d42fb463a1

Sources EV-91bf19e5765404cb21823870
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 93945263ebf7dba8a3dcba0b38eb71834156c6e5e79261fd10d5d34724b5a7c2
Source schedule candidates · KOR · kepco_planned

154kV 당수분기 전력구공사 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2024-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234649|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_88de12c6bc8f0cbc

Sources EV-9355c302e92a50fd090d5525
Evidence SHA-256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70
행 SHA-256 a6b77b2a5d83ad7d2af2330d7800c350eff640e65dad282d6651e35da23c7045
Source schedule candidates · KOR · kepco_planned

154kV 당수분기 전력구공사 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234649|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_88de12c6bc8f0cbc

Sources EV-9355c302e92a50fd090d5525
Evidence SHA-256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70
행 SHA-256 a6b77b2a5d83ad7d2af2330d7800c350eff640e65dad282d6651e35da23c7045
Source snapshots by date · KOR · kepco_planned

154kV 당수분기 전력구공사 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_88de12c6bc8f0cbc
stable_project_idkproj_87b5b8d42fb463a1
source_key202609|234649|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 당수분기 전력구공사
project_name_detail154kV 당수분기 전력구공사 전력구 건설사업
region_summary_raw경기도 수원시 권선구등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 수원당수 공공주택지구 신규부하 전력공급능력 확보
Project region
  • 경기도 수원시 권선구
Project period
  • 2022.08~2024.10
사업 규모
  • 터널 632M, 전력구 976M
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
ㅁ설계용역착수 : '22.09 ㅁ기본설계심의 : '23.09 ㅁ실시설계심의 : '23.12 ㅁ공사계약 재의뢰 : 25.05(1차) ㅁ수의계약 검토 : 25.11(2차) ㅁ공사 착수 : 26.1(1차), 26.3(2차)
future_plan_redacted□ 향후계획 ㅁ설계용역착수 : '22.09 ㅁ기본설계심의 : '23.09 ㅁ실시설계심의 : '23.12 ㅁ공사계약 재의뢰 : 25.05(1차) ㅁ수의계약 검토 : 25.11(2차) ㅁ공사 착수 : 26.1(1차), 26.3(2차)
attachment_count0
source_detail_sha25630e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234649|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_88de12c6bc8f0cbc

Sources EV-9355c302e92a50fd090d5525
Evidence SHA-256 30e77ff4aa94d22ed7a556bd491ba02eaae91eddace4cb4f9675d986bf997b70
행 SHA-256 a6b77b2a5d83ad7d2af2330d7800c350eff640e65dad282d6651e35da23c7045
Source snapshots by date · KOR · kepco_planned

154kV 당수분기 전력구공사 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_87b5b8d42fb463a1
stable_project_keyprjtDef:234649:ESB
project_definition234649
first_region_codeESB
manual_source_formatfalse
project_name154kV 당수분기 전력구공사 전력구 건설사업
project_name_list154kV 당수분기 전력구공사
purpose수원당수 공공주택지구 신규부하 전력공급능력 확보
project_region_detail경기도 수원시 권선구
project_period_raw2022.08~2024.10
project_scale_raw터널 632M, 전력구 976M
responsible_office_raw경인건설본부/경기건설지사
equipment_type전력구
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_88de12c6bc8f0cbc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_87b5b8d42fb463a1

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_87b5b8d42fb463a1

Sources EV-91bf19e5765404cb21823870
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 93945263ebf7dba8a3dcba0b38eb71834156c6e5e79261fd10d5d34724b5a7c2

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel