POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 20items · current page 1–20 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a0648cf696e5a2bfe857ede4
Detailed source fields Original source field Published value or condition stable_project_id kproj_a460c67c03bff04f stable_project_key prjtDef:232593:ESB project_definition 232593 first_region_code ESB manual_source_format false project_name 154kV 당수분기T/L 건설사업 project_name_list 154kV 당수분기T/L 건설사업 purpose 수원 당수 공공주택지구 신규부하 공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2021.12~2027.10 project_scale_raw STACIR/AW 240 *S*2C,0.5KM,C/T 1기,사각철탑1기 교체 responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a460c67c03bff04f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a460c67c03bff04f
Sources EV-a0648cf696e5a2bfe857ede4 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8c4a8c5f5a6bb41dfa14ea88d55adc79a6fbfc84e81f2e47a465c50be7d0521a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232593|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7079abedc9a41cc0 stable_project_id kproj_a460c67c03bff04f source_key 202609|232593|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 당수분기T/L 건설사업 project_name_detail 154kV 당수분기T/L 건설사업 region_summary_raw 경기도 수원시 권선구등 1 지역 equipment_type_raw 가공송전 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 STACIR/AW 240 *S*2C,0.5KM,C/T 1기,사각철탑1기 교체 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.07~2023.09 경과지(부지) 확정: 2023.05 환경/재해 영향평가 환경영향평가: 2024.06 ~ 2025.04 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2024.11 ~ 2024.11 설명회·공청회: 2024.11 자체설명회: [추진실적] □‘21.09 : 제9차 장기 송변전설비계획 반영 □‘23.05 : 경과지 확정 □‘23.07 : 지장유무조회 □‘24.11 : 사업시행계획 열람공고 및 주민설명회 개최, 실시계획승인 신청 □‘25.04 : 실시계획승인신청 및 지자체 협의 [향후계획] □‘26.08 : 공사 착공 □ '27.10 : 공사 준공 future_plan_redacted □ 향후계획 [추진실적] □‘21.09 : 제9차 장기 송변전설비계획 반영 □‘23.05 : 경과지 확정 □‘23.07 : 지장유무조회 □‘24.11 : 사업시행계획 열람공고 및 주민설명회 개최, 실시계획승인 신청 □‘25.04 : 실시계획승인신청 및 지자체 협의 [향후계획] □‘26.08 : 공사 착공 □ '27.10 : 공사 준공 attachment_count 0 source_detail_sha256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232593|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7079abedc9a41cc0
Sources EV-2146af2d3ee1c05a4a7d3e2b Evidence SHA-256 8b13fcc44fa67a23c6c7dcf885e3b923fb61a9f903773868e73bbd66151a52b5 행 SHA-256 a878a8cf34b9c518f831534093172e3a4fee21fd81c6c67f4515889bb584526d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a460c67c03bff04f stable_project_key prjtDef:232593:ESB project_definition 232593 first_region_code ESB manual_source_format false project_name 154kV 당수분기T/L 건설사업 project_name_list 154kV 당수분기T/L 건설사업 purpose 수원 당수 공공주택지구 신규부하 공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2021.12~2027.10 project_scale_raw STACIR/AW 240 *S*2C,0.5KM,C/T 1기,사각철탑1기 교체 responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_a460c67c03bff04f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a460c67c03bff04f
Sources EV-a0648cf696e5a2bfe857ede4 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8c4a8c5f5a6bb41dfa14ea88d55adc79a6fbfc84e81f2e47a465c50be7d0521a Observations for this power asset History for this project