Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 25items · current page 1–25 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-cf05ac171ff554e3adab502b
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e09d0ab3f4412cd5
stable_project_keyprjtDef:234443:ESB
project_definition234443
first_region_codeESB
manual_source_formatfalse
project_name154kV 대저-어방 전력구 건설사업
project_name_list김해-강서지역 전기공급시설 전력구공사(대저-어방 1차)
purpose부산 강서구 및 경남 김해지역 계통보강
project_region_detail경상남도 김해시 부산광역시 강서구
project_period_raw2019.04~2029.07
project_scale_raw터널3,675M, 압입249M, 관로4,258M, 전력구10M
responsible_office_raw남부건설본부/직할
equipment_type전력구
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_105ccad9287a643d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_e09d0ab3f4412cd5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e09d0ab3f4412cd5

Sources EV-cf05ac171ff554e3adab502b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0a5abdca21c60e85f062b1a05f4a733c5eab868b0a3f84bb36e838633b7fe2e3
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2029-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2019-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source schedule candidates · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234443|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source snapshots by date · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_105ccad9287a643d
stable_project_idkproj_e09d0ab3f4412cd5
source_key202609|234443|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list김해-강서지역 전기공급시설 전력구공사(대저-어방 1차)
project_name_detail154kV 대저-어방 전력구 건설사업
region_summary_raw경상남도 김해시등 2 지역
equipment_type_raw전력구
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 부산 강서구 및 경남 김해지역 계통보강
Project region
  • 경상남도 김해시 부산광역시 강서구
Project period
  • 2019.04~2029.07
사업 규모
  • 터널3,675M, 압입249M, 관로4,258M, 전력구10M
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제07차 장기송변전설비계획 반영()
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2019.03
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2019.04 ~ 2022.05 기본설계: 2019.04 ~ 2020.03 실시설계: 2019.04 ~ 2022.05 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.05 공사 기간: 2023.05 ~ 2028.05 감독자: [redacted], 실적): 37, 17
□ 18.05 : 현장답사 및 분석결과 보고(→송변전건설처) □ 19.04 : 설계용역 착수 □ 20.03 : 기본설계심의 시행 □ 21.04 : 공사 시행 지시(←송변전건설처) □ 22.01 : 실시설계심의 시행 □ 23.04 : 공사계약((주)호반산업) □ 23.05 : 공사착수 □ 26.02 : 공사중지 □ 28.05 : 1차 공사 준공(예정) □ 29.02 : 2차 공사 준공(예정)
future_plan_redacted□ 향후계획 □ 18.05 : 현장답사 및 분석결과 보고(→송변전건설처) □ 19.04 : 설계용역 착수 □ 20.03 : 기본설계심의 시행 □ 21.04 : 공사 시행 지시(←송변전건설처) □ 22.01 : 실시설계심의 시행 □ 23.04 : 공사계약((주)호반산업) □ 23.05 : 공사착수 □ 26.02 : 공사중지 □ 28.05 : 1차 공사 준공(예정) □ 29.02 : 2차 공사 준공(예정)
attachment_count0
source_detail_sha25624c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234443|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_105ccad9287a643d

Sources EV-94e7d07c59cdc3921d7383d4
Evidence SHA-256 24c44dfe4f4f99ee8dec178f108e8259af5e5cbc0de1fad3917fc3fdda1fa2fe
행 SHA-256 483848a1dac8195d3d25dc8d647103e95b3f8cb231095dd2f21da2884b20cffa
Source snapshots by date · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e09d0ab3f4412cd5
stable_project_keyprjtDef:234443:ESB
project_definition234443
first_region_codeESB
manual_source_formatfalse
project_name154kV 대저-어방 전력구 건설사업
project_name_list김해-강서지역 전기공급시설 전력구공사(대저-어방 1차)
purpose부산 강서구 및 경남 김해지역 계통보강
project_region_detail경상남도 김해시 부산광역시 강서구
project_period_raw2019.04~2029.07
project_scale_raw터널3,675M, 압입249M, 관로4,258M, 전력구10M
responsible_office_raw남부건설본부/직할
equipment_type전력구
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_105ccad9287a643d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_e09d0ab3f4412cd5

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e09d0ab3f4412cd5

Sources EV-cf05ac171ff554e3adab502b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0a5abdca21c60e85f062b1a05f4a733c5eab868b0a3f84bb36e838633b7fe2e3

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel