Power assets and projects · KOR · kepco_planned

154kV 대소원S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7344da78f3ed655676ff073e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a9c3d418f469a598
stable_project_keyprjtDef:231628:ESB
project_definition231628
first_region_codeESB
manual_source_formatfalse
project_name154kV 대소원S/S 건설사업
project_name_list154kV 대소원변전소 건설사업
purpose인근지역 개발에 따른 신규 공급능력 확보
project_region_detailChungju City, North Chungcheong Province
project_period_raw2023.05~2031.10
project_scale_raw154/23KV 45/60MVA × 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b31c33b3430d7efc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a9c3d418f469a598

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a9c3d418f469a598

Sources EV-7344da78f3ed655676ff073e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7e97a9669d0bd4ace75dd1207453549feb49c6f97b1b258a9775b632ac1f85bf
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2029-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2031-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source schedule candidates · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2031-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231628|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source snapshots by date · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b31c33b3430d7efc
stable_project_idkproj_a9c3d418f469a598
source_key202609|231628|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 대소원변전소 건설사업
project_name_detail154kV 대소원S/S 건설사업
region_summary_raw충청북도 충주시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 인근지역 개발에 따른 신규 공급능력 확보
Project region
  • Chungju City, North Chungcheong Province
Project period
  • 2023.05~2031.10
사업 규모
  • 154/23KV 45/60MVA × 2BANK
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • [진행경과] □ ’23.05 : 제10차 장기 송변전설비계획 반영 □ ‘25.05 ~ ’26.08 : 충주 드림파크 산업단지 내 변전소 부지반영 협의
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
[향후계획] □ ‘28.11 : 용지 매수 □ ‘29.11 : 공사 착공 □ ‘31.10 : 준공 및 가압
future_plan_redacted□ 향후계획 [향후계획] □ ‘28.11 : 용지 매수 □ ‘29.11 : 공사 착공 □ ‘31.10 : 준공 및 가압
attachment_count0
source_detail_sha25640f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231628|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b31c33b3430d7efc

Sources EV-2ae283247b353bab566d0dda
Evidence SHA-256 40f65fb5f3b47bbd461933e4cbc1868dba0e667b28e2fda59e82d25cdb9b5dba
행 SHA-256 21b797e43e9a0012e825311460ca6b3e658487a52688f3f8693b0b8373555b55
Source snapshots by date · KOR · kepco_planned

154kV 대소원S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a9c3d418f469a598
stable_project_keyprjtDef:231628:ESB
project_definition231628
first_region_codeESB
manual_source_formatfalse
project_name154kV 대소원S/S 건설사업
project_name_list154kV 대소원변전소 건설사업
purpose인근지역 개발에 따른 신규 공급능력 확보
project_region_detailChungju City, North Chungcheong Province
project_period_raw2023.05~2031.10
project_scale_raw154/23KV 45/60MVA × 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b31c33b3430d7efc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a9c3d418f469a598

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a9c3d418f469a598

Sources EV-7344da78f3ed655676ff073e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7e97a9669d0bd4ace75dd1207453549feb49c6f97b1b258a9775b632ac1f85bf

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel