POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동강원(태백#2)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-cc9e58b83dec85bdbe2cb87e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d96988c2722ae59b
stable_project_keyprjtDef:231561:ESB
project_definition231561
first_region_codeESB
manual_source_formatfalse
project_name154kV 동강원(태백#2)S/S 건설사업
project_name_list154kV 동강원(태백#2)변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail강원특별자치도 삼척시
project_period_raw2025.07~2031.10
project_scale_raw154/23KV 60MVA * 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e5295c4b59d645e9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d96988c2722ae59b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d96988c2722ae59b

Sources EV-cc9e58b83dec85bdbe2cb87e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54e6408f5e0ad6c11064ab7a40c3b72173055d494baf8fd5d8c8d146168c1243
Source schedule candidates · KOR · kepco_planned

154kV 동강원(태백#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231561|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e5295c4b59d645e9

Sources EV-f1f77746047931fc9340babc
Evidence SHA-256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8
행 SHA-256 8216d3185dd758e2301a20db6f7c2be3aea2475bb971fdd8b253d850e28c89aa
Source schedule candidates · KOR · kepco_planned

154kV 동강원(태백#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231561|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e5295c4b59d645e9

Sources EV-f1f77746047931fc9340babc
Evidence SHA-256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8
행 SHA-256 8216d3185dd758e2301a20db6f7c2be3aea2475bb971fdd8b253d850e28c89aa
Source snapshots by date · KOR · kepco_planned

154kV 동강원(태백#2)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e5295c4b59d645e9
stable_project_idkproj_d96988c2722ae59b
source_key202609|231561|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 동강원(태백#2)변전소 건설사업
project_name_detail154kV 동강원(태백#2)S/S 건설사업
region_summary_raw강원특별자치도 삼척시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 강원특별자치도 삼척시
Project period
  • 2025.07~2031.10
사업 규모
  • 154/23KV 60MVA * 2BANK
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2025.12 입지선정위원회 구성시기: 2026.05 참여 위원 수 : 13 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • [진행경과] □ ‘25.05 : 제11차 장기 송변전설비계획 신규사업 반영 □ ‘25.08 : 전력입지영향평가 용역 설계 □ ‘25.12 : 전력입지영향평가 용역 계약 및 착수 완료 □ ‘26.04 : 입지선정위원회 구성 완료 (주민대표 10, 전문가 2, 지자체 2, 한전 1) □ ‘26.05 : 입지선정위원회 착수(1차) 회의 시행 - 내용 : 위원장 선출, 입지선정위원회 구성 및 운영 규범 수립·의결 등 □ ‘26.05 : 주민대표 대상 입지선정위원회 2차 회의 전 사전 사업설명 시행 - 내용 : 중요도 설문조사 조사방법 및 세부 절차 안내 □ ‘26.06 : 입지선정위원회 2차 회의 시행 - 내용 : 광역 개황조사 결과 보고, 입지선정을 위한 기준 심의·의결, 중요도 설문조사 시행 등 □ ‘26.07 : 입지선정위원회 3차 회의 시행 - 내용 : 중요도 조사 분석결과 보고, 도출된 후보 지역 안내 및 후보지역 심의·의결 등 □ ‘26.08 : 주민대상 사업 설명회 시행 - 내용 : 입지선정위원회 추진 현황, 후보 지역 및 향후 계획 안내 등 □ ‘26.09 : 입지선정위원회 4차 회의 시행 - 내용 : 예비 후보부지 현황보고, 후보부지 심의·의결 등
[향후계획] □ ‘26.10 : 입지선정위원회 5차 회의 시행 및 후보부지 현장답사 시행 □ ‘26.11 : 부지선정완료 □ ‘28.01 : 실시계획승인 완료 □ ‘29.01 : 용지매수 완료 □ ‘29.11 : 변전설계 완료 □ ‘30.04 : 변전공사 착공 □ ‘31.10 : 변전공사 준공
future_plan_redacted□ 향후계획 [향후계획] □ ‘26.10 : 입지선정위원회 5차 회의 시행 및 후보부지 현장답사 시행 □ ‘26.11 : 부지선정완료 □ ‘28.01 : 실시계획승인 완료 □ ‘29.01 : 용지매수 완료 □ ‘29.11 : 변전설계 완료 □ ‘30.04 : 변전공사 착공 □ ‘31.10 : 변전공사 준공
attachment_count0
source_detail_sha2562f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231561|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e5295c4b59d645e9

Sources EV-f1f77746047931fc9340babc
Evidence SHA-256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8
행 SHA-256 8216d3185dd758e2301a20db6f7c2be3aea2475bb971fdd8b253d850e28c89aa
Source snapshots by date · KOR · kepco_planned

154kV 동강원(태백#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d96988c2722ae59b
stable_project_keyprjtDef:231561:ESB
project_definition231561
first_region_codeESB
manual_source_formatfalse
project_name154kV 동강원(태백#2)S/S 건설사업
project_name_list154kV 동강원(태백#2)변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail강원특별자치도 삼척시
project_period_raw2025.07~2031.10
project_scale_raw154/23KV 60MVA * 2BANK
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type변전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e5295c4b59d645e9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d96988c2722ae59b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d96988c2722ae59b

Sources EV-cc9e58b83dec85bdbe2cb87e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54e6408f5e0ad6c11064ab7a40c3b72173055d494baf8fd5d8c8d146168c1243

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel