POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동강원(태백#2)분기 T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-51e263b29dfd847939437723
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_96581b31c84e03e8
stable_project_keyprjtDef:232743:ESB
project_definition232743
first_region_codeESB
manual_source_formatfalse
project_name154kV 동강원(태백#2)분기 T/L 건설사업
project_name_list154kV 동강원(태백#2)분기 송전선로 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail강원특별자치도 삼척시,태백시
project_period_raw2025.05~2031.10
project_scale_rawHS/AW 240㎟×2B, 4C- 2KM
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bf97ae6201d21f4f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_96581b31c84e03e8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_96581b31c84e03e8

Sources EV-51e263b29dfd847939437723
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 53c06c0095ac57eb6aa0ebd60771d7976d6278fd6a2766f25c9aa04116dc9609
Source schedule candidates · KOR · kepco_planned

154kV 동강원(태백#2)분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232743|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bf97ae6201d21f4f

Sources EV-0b24903ca6c4a8e1454baa6f
Evidence SHA-256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d
행 SHA-256 59c7adaaf5c469fd759acd0c33aa1672781c2d36b1074b6f76e7412d617be786
Source schedule candidates · KOR · kepco_planned

154kV 동강원(태백#2)분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232743|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bf97ae6201d21f4f

Sources EV-0b24903ca6c4a8e1454baa6f
Evidence SHA-256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d
행 SHA-256 59c7adaaf5c469fd759acd0c33aa1672781c2d36b1074b6f76e7412d617be786
Source snapshots by date · KOR · kepco_planned

154kV 동강원(태백#2)분기 T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_bf97ae6201d21f4f
stable_project_idkproj_96581b31c84e03e8
source_key202609|232743|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 동강원(태백#2)분기 송전선로 건설사업
project_name_detail154kV 동강원(태백#2)분기 T/L 건설사업
region_summary_raw강원특별자치도 삼척시등 2 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 강원특별자치도 삼척시,태백시
Project period
  • 2025.05~2031.10
사업 규모
  • HS/AW 240㎟×2B, 4C- 2KM
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2025.10 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 15 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ ‘25.05 : 제11차 장기송변전설비계획 사업 신규반영 □ ‘25.12 : 전력입지영향평가 용역 계약 및 착수 완료 □ ‘25.12 : 지자체 대상 사업설명회 □ ‘26.02 : 읍·면·동 대상 사업설명회 □ ‘26.04 : 입지선정위원회 구성 완료 □ ‘26.05 : 입지선정위원회 착수(1차) 회의 시행 - 내용 : 위원장 선출, 입지선정위원회 운영기준 수립 □ ‘26.06 : 입지선정위원회 2차 회의 시행 - 내용 : 중요도 설문조사 시행 □ ‘26.07 : 입지선정위원회 3차 회의 시행 - 내용 : 변전소 후보지역 선정 □ ‘26.08 : 후보지역 대상 사업설명회
line □ ‘26.09 : 입지선정위원회 4차 회의 시행 - 내용 : 변전소 후보부지 심의·의결 □ ‘26.10 : 입지선정위원회 5차 회의 시
future_plan_redactedline □ 향후계획 □ ‘26.09 : 입지선정위원회 4차 회의 시행 - 내용 : 변전소 후보부지 심의·의결 □ ‘26.10 : 입지선정위원회 5차 회의 시
attachment_count0
source_detail_sha256a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232743|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bf97ae6201d21f4f

Sources EV-0b24903ca6c4a8e1454baa6f
Evidence SHA-256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d
행 SHA-256 59c7adaaf5c469fd759acd0c33aa1672781c2d36b1074b6f76e7412d617be786
Source snapshots by date · KOR · kepco_planned

154kV 동강원(태백#2)분기 T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_96581b31c84e03e8
stable_project_keyprjtDef:232743:ESB
project_definition232743
first_region_codeESB
manual_source_formatfalse
project_name154kV 동강원(태백#2)분기 T/L 건설사업
project_name_list154kV 동강원(태백#2)분기 송전선로 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail강원특별자치도 삼척시,태백시
project_period_raw2025.05~2031.10
project_scale_rawHS/AW 240㎟×2B, 4C- 2KM
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bf97ae6201d21f4f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_96581b31c84e03e8

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_96581b31c84e03e8

Sources EV-51e263b29dfd847939437723
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 53c06c0095ac57eb6aa0ebd60771d7976d6278fd6a2766f25c9aa04116dc9609

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel