POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 도일(舊,중장안) 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-af5a0fff290c4cd48ff12ce2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e715eff9b8d3b9c3
stable_project_keyprjtDef:231574:ESB
project_definition231574
first_region_codeESB
manual_source_formatfalse
project_name154kV 도일(舊,중장안) 건설사업
project_name_list154kV 도일S/S 건설사업
purpose평택시 일대의 안정적 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2021.09~2029.10
project_scale_raw154KV M.TR (45/60MVA) X 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_9f258304e2bcd003
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_e715eff9b8d3b9c3

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e715eff9b8d3b9c3

Sources EV-af5a0fff290c4cd48ff12ce2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0fe996ad3eee4236703e82a737fbc50e83337c3082f0110856d082233816a5b4
Source schedule candidates · KOR · kepco_planned

154kV 도일(舊,중장안) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231574|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9f258304e2bcd003

Sources EV-7cf2159f5466d19f066d6fb0
Evidence SHA-256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987
행 SHA-256 f994fe29a1ecbb878b77a8ec302a6b786a55250a08e1b702a28bcd2713a0e410
Source schedule candidates · KOR · kepco_planned

154kV 도일(舊,중장안) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231574|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9f258304e2bcd003

Sources EV-7cf2159f5466d19f066d6fb0
Evidence SHA-256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987
행 SHA-256 f994fe29a1ecbb878b77a8ec302a6b786a55250a08e1b702a28bcd2713a0e410
Source snapshots by date · KOR · kepco_planned

154kV 도일(舊,중장안) 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_9f258304e2bcd003
stable_project_idkproj_e715eff9b8d3b9c3
source_key202609|231574|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 도일S/S 건설사업
project_name_detail154kV 도일(舊,중장안) 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 평택시 일대의 안정적 전력공급
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2021.09~2029.10
사업 규모
  • 154KV M.TR (45/60MVA) X 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
○ 진행경과 - '21.09 : 제9차 장기송변전설비계획 신규반영 - '23.09 : 변전소 부지 확정[경기도 평택시 도일동 205번지(브레인시티 內)] - '25.01 : 기본설계 완료 ○ 향후계획 - '27.11 : 토건공사 착공 - '28.02 : 변전공사 착공 - '29.10 : 변전소 가압
future_plan_redacted□ 향후계획 ○ 진행경과 - '21.09 : 제9차 장기송변전설비계획 신규반영 - '23.09 : 변전소 부지 확정[경기도 평택시 도일동 205번지(브레인시티 內)] - '25.01 : 기본설계 완료 ○ 향후계획 - '27.11 : 토건공사 착공 - '28.02 : 변전공사 착공 - '29.10 : 변전소 가압
attachment_count0
source_detail_sha256e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231574|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_9f258304e2bcd003

Sources EV-7cf2159f5466d19f066d6fb0
Evidence SHA-256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987
행 SHA-256 f994fe29a1ecbb878b77a8ec302a6b786a55250a08e1b702a28bcd2713a0e410
Source snapshots by date · KOR · kepco_planned

154kV 도일(舊,중장안) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e715eff9b8d3b9c3
stable_project_keyprjtDef:231574:ESB
project_definition231574
first_region_codeESB
manual_source_formatfalse
project_name154kV 도일(舊,중장안) 건설사업
project_name_list154kV 도일S/S 건설사업
purpose평택시 일대의 안정적 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2021.09~2029.10
project_scale_raw154KV M.TR (45/60MVA) X 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_9f258304e2bcd003
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_e715eff9b8d3b9c3

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e715eff9b8d3b9c3

Sources EV-af5a0fff290c4cd48ff12ce2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0fe996ad3eee4236703e82a737fbc50e83337c3082f0110856d082233816a5b4

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel