Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 동구지분기 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7243050ba16f577406adb11a
Sources EV-8a83368d8d09f7093a1b241a Evidence SHA-256 545b0baa30d34599599a6493d83cc2ed029b637232d2f537c22c4717c61df41b 행 SHA-256 fd843c57186f545c58dcd08d46f0e39dcebffc5f2f23b5b5727f52b213524b66Source snapshots by date · KOR · kepco_planned
154kV 동구지분기 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_257eb80b1da77c77
stable_project_id
kproj_707eb51cfd2d873f
source_key
202609|233529|ESB
basic_ym
202609
source_stage_raw
사업승인-공사착수전
project_name_list
154kV 동구지분기 지중T/L 건설사업
project_name_detail
154kV 동구지분기 지중T/L 건설사업
region_summary_raw
대구광역시 달성군등 1 지역
equipment_type_raw
지중송전
headquarters_raw
남부건설본부
office_raw
대구경북건설지사
section_fields
Project purpose
154KV 서구지S/S 단일계통 공급해소
Project region
대구광역시 달성군
Project period
2025.06~2027.12
사업 규모
154KV XLPE 2000㎟×4C×0.1㎞
담당 사업소
남부건설본부/대구경북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-8a83368d8d09f7093a1b241a Evidence SHA-256 545b0baa30d34599599a6493d83cc2ed029b637232d2f537c22c4717c61df41b 행 SHA-256 fd843c57186f545c58dcd08d46f0e39dcebffc5f2f23b5b5727f52b213524b66Source snapshots by date · KOR · kepco_planned