POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 2601–2700 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c325baefaffe15cc stable_project_id kproj_27c9e022e76bba93 source_key 202609|233669|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 북현덕분기 지중T/L 건설공사 project_name_detail 154kV 북현덕분기 지중T/L region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Pyeongtaek, Gyeonggi Province 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.12 공사 기간: 2024.12 ~ 2026.07 감독자: [redacted], 실적): 100, 39 □ '24.12 : 공사 착공 □ '25.12 : 공사 중지[선행공정(변전소, 토목) 대기] □ '26.07 : 공사 재개 □ 선행공정 지연에 따른 준공목표 변경 추진 예상 ('25.10 → '27.04) future_plan_redacted □ 향후계획 □ '24.12 : 공사 착공 □ '25.12 : 공사 중지[선행공정(변전소, 토목) 대기] □ '26.07 : 공사 재개 □ 선행공정 지연에 따른 준공목표 변경 추진 예상 ('25.10 → '27.04) attachment_count 0 source_detail_sha256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233669|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_27c9e022e76bba93 stable_project_key prjtDef:233669:ESB project_definition 233669 first_region_code ESB manual_source_format false project_name 154kV 북현덕분기 지중T/L project_name_list 154kV 북현덕분기 지중T/L 건설공사 purpose 전력계통 보강 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2024.12~2025.12 project_scale_raw 154KV 2500㎟×4C-2.7KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_27c9e022e76bba93
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_27c9e022e76bba93
Sources EV-517ff66b36b07b4733ab6463 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2603b229e541e5d0eed572290498c1f1c960a4060346a6c9e85632b303536c79 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-49dc7f6828366278afcaf994
Detailed source fields Original source field Published value or condition stable_project_id kproj_6ac0b35eeea09b6b stable_project_key prjtDef:231724:ESB project_definition 231724 first_region_code ESB manual_source_format false project_name 154kV 북홍천S/S 건설사업 project_name_list 154kV 북홍천 변전소 건설사업 purpose 기존 홍천 변전소 과부하에 따른 신설 변전소 건설 필요 project_region_detail 강원특별자치도 홍천군 project_period_raw project_scale_raw 154KV M.TR(60MVA)×2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_6ac0b35eeea09b6b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_6ac0b35eeea09b6b
Sources EV-49dc7f6828366278afcaf994 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 02b0b4b10bd101c73b861ecf90458a2c8785e78bd3a0ca58acc91becb1a2987c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_48cd8fdf40c54934 stable_project_id kproj_6ac0b35eeea09b6b source_key 202609|231724|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 북홍천 변전소 건설사업 project_name_detail 154kV 북홍천S/S 건설사업 region_summary_raw 강원특별자치도 홍천군등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields Project purpose 기존 홍천 변전소 과부하에 따른 신설 변전소 건설 필요 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 [진행경과] □ '26.05 : 전력입지영향평가 용역 시행 □ '26.07 : 전력입지영향평가 용역 착수 □ '26.08 : 지자체 대상 사업설명회 시행(↔홍천군청) - 내용 : 사업개요 및 필요성, 대상지역 및 입지선정 절차 설명. 지자체 협조 요청 사항 전달 [향후계획] □ '26.09 : 면장 및 이장협의회 대상 사업설명회 시행 □ '26.10 : 입지선정위원회 구성 □ '26.11 : 입지선정위원회 착수 회의 □ '27.04 : 부지선정완료 □ '27.09 : 부지확정완료 □ '29.11 : 용지매수완료 □ '30.09 : 변전설계 완료 □ '31.02 : 변전공사 착공 □ '32.10 : 변전공사 준공 future_plan_redacted □ 향후계획 [향후계획] □ '26.09 : 면장 및 이장협의회 대상 사업설명회 시행 □ '26.10 : 입지선정위원회 구성 □ '26.11 : 입지선정위원회 착수 회의 □ '27.04 : 부지선정완료 □ '27.09 : 부지확정완료 □ '29.11 : 용지매수완료 □ '30.09 : 변전설계 완료 □ '31.02 : 변전공사 착공 □ '32.10 : 변전공사 준공 attachment_count 0 source_detail_sha256 75cf032b0320a9b992b11ab732d61eb2c3419cbd1edd3ddddc26474dc2775cce first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231724|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_48cd8fdf40c54934
Sources EV-40390941b547c4ac09ead419 Evidence SHA-256 75cf032b0320a9b992b11ab732d61eb2c3419cbd1edd3ddddc26474dc2775cce 행 SHA-256 c96081775a687977d18dabfd86d72b9004d94b3e17100f2bffabfd412c156997 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_6ac0b35eeea09b6b stable_project_key prjtDef:231724:ESB project_definition 231724 first_region_code ESB manual_source_format false project_name 154kV 북홍천S/S 건설사업 project_name_list 154kV 북홍천 변전소 건설사업 purpose 기존 홍천 변전소 과부하에 따른 신설 변전소 건설 필요 project_region_detail 강원특별자치도 홍천군 project_period_raw project_scale_raw 154KV M.TR(60MVA)×2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_6ac0b35eeea09b6b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_6ac0b35eeea09b6b
Sources EV-49dc7f6828366278afcaf994 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 02b0b4b10bd101c73b861ecf90458a2c8785e78bd3a0ca58acc91becb1a2987c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a5a5ea5087aabe095cb2550a
Detailed source fields Original source field Published value or condition stable_project_id kproj_3822d5c7089819ae stable_project_key prjtDef:232776:ESB project_definition 232776 first_region_code ESB manual_source_format false project_name 154kV 북홍천분기T/L 건설사업 project_name_list 154kV 북홍천분기 송전선로 건설사업 purpose 홍천변전소 과부하 전망에 따른 변전소 신설 필요 project_region_detail 강원특별자치도 홍천군 project_period_raw 2026.07~2032.10 project_scale_raw ACSR330㎟ × S × 4C-3.2KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_3822d5c7089819ae
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_3822d5c7089819ae
Sources EV-a5a5ea5087aabe095cb2550a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0ee73ef2cf2b3425bb2b0f2c6848fa4b4693c37219e9dc70af00bfab31c3a83c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232776|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_2455f82ed7c085ea stable_project_id kproj_3822d5c7089819ae source_key 202609|232776|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북홍천분기 송전선로 건설사업 project_name_detail 154kV 북홍천분기T/L 건설사업 region_summary_raw 강원특별자치도 홍천군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields Project purpose 홍천변전소 과부하 전망에 따른 변전소 신설 필요 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2026.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ ‘25.05 : 제11차 장기송변전설비계획 사업 신규반영 □ ‘26.07 : 전력입지영향평가 용역 계약 및 착수 완료 □ ‘26.08 : 지자체 대상 사업설명회 □ ‘26.09 : 읍·면·동 대상 사업설명회 □ ‘26.11 : 입지선정위원회 구성 future_plan_redacted □ 향후계획 □ ‘26.09 : 읍·면·동 대상 사업설명회 □ ‘26.11 : 입지선정위원회 구성 attachment_count 0 source_detail_sha256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232776|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2455f82ed7c085ea
Sources EV-368ef6802ee36f7676fd554d Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35 행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_3822d5c7089819ae stable_project_key prjtDef:232776:ESB project_definition 232776 first_region_code ESB manual_source_format false project_name 154kV 북홍천분기T/L 건설사업 project_name_list 154kV 북홍천분기 송전선로 건설사업 purpose 홍천변전소 과부하 전망에 따른 변전소 신설 필요 project_region_detail 강원특별자치도 홍천군 project_period_raw 2026.07~2032.10 project_scale_raw ACSR330㎟ × S × 4C-3.2KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_3822d5c7089819ae
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_3822d5c7089819ae
Sources EV-a5a5ea5087aabe095cb2550a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0ee73ef2cf2b3425bb2b0f2c6848fa4b4693c37219e9dc70af00bfab31c3a83c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-13f2ccc4ef6ef9b1f549c6ad
Detailed source fields Original source field Published value or condition stable_project_id kproj_06ccf8f3edf42a47 stable_project_key prjtDef:231648:ESB project_definition 231648 first_region_code ESB manual_source_format false project_name 154kV 북후변전소 건설사업 project_name_list 154kV 북후변전소 건설사업 purpose 안동지역 재생E 예측에 따라 선제적인 보강 project_region_detail 경상북도 안동시 project_period_raw 2024.05~2030.12 project_scale_raw 154KV M.TR(80MVA)×2BANK,170KV GIS×12CCT 등 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_06ccf8f3edf42a47
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_06ccf8f3edf42a47
Sources EV-13f2ccc4ef6ef9b1f549c6ad Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c967701f0eb327abb4f786e683c70fd0d4310a01c99388dd136f8f2f539a556d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2030-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2030-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03-06 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01-24 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2030-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231648|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ac1ddfec19629128 stable_project_id kproj_06ccf8f3edf42a47 source_key 202609|231648|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북후변전소 건설사업 project_name_detail 154kV 북후변전소 건설사업 region_summary_raw 경상북도 안동시등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 154KV M.TR(80MVA)×2BANK,170KV GIS×12CCT 등 입지선정 전력입지영향평가 용역 착수: 2024.10 입지선정위원회 구성시기: 2025.01 참여 위원 수 : 17 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 1. 진행경과 □ '23.05 : 제10차 장기 송변전설비계획 반영(준공:'30.12) □ '23.12 : 지자체(안동시, 와룡면) 사업설명회 □ '24.07 : 전력영향평가 용역 발주 □ '24.12 : 입지선정위원회 구성 협조요청(안동시청) □ '25.01.24 : 입지선정위원회 구성 □ '25.03.06~ : 입지선정위원회 착수회의(1,2,3차) 2. 향후계획 □ '26.01 : 부지 확정 □ '26.06 : 실시계획 승인 신청 □ '30.12 : 가압 및 준공 future_plan_redacted □ 향후계획 1. 진행경과 □ '23.05 : 제10차 장기 송변전설비계획 반영(준공:'30.12) □ '23.12 : 지자체(안동시, 와룡면) 사업설명회 □ '24.07 : 전력영향평가 용역 발주 □ '24.12 : 입지선정위원회 구성 협조요청(안동시청) □ '25.01.24 : 입지선정위원회 구성 □ '25.03.06~ : 입지선정위원회 착수회의(1,2,3차) 2. 향후계획 □ '26.01 : 부지 확정 □ '26.06 : 실시계획 승인 신청 □ '30.12 : 가압 및 준공 attachment_count 0 source_detail_sha256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231648|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ac1ddfec19629128
Sources EV-4a1e3d0cf4ea28d087756d1c Evidence SHA-256 04fa16b234e232f101b5d405291e4a8bc41e2576c86435c8d2209cfdc8224dfa 행 SHA-256 fa9f457ded08d276791d4ef8e2ed8dc5900f4099abea7d2080a599bbe0dfd883 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_06ccf8f3edf42a47 stable_project_key prjtDef:231648:ESB project_definition 231648 first_region_code ESB manual_source_format false project_name 154kV 북후변전소 건설사업 project_name_list 154kV 북후변전소 건설사업 purpose 안동지역 재생E 예측에 따라 선제적인 보강 project_region_detail 경상북도 안동시 project_period_raw 2024.05~2030.12 project_scale_raw 154KV M.TR(80MVA)×2BANK,170KV GIS×12CCT 등 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_06ccf8f3edf42a47
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_06ccf8f3edf42a47
Sources EV-13f2ccc4ef6ef9b1f549c6ad Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c967701f0eb327abb4f786e683c70fd0d4310a01c99388dd136f8f2f539a556d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-23555134daf1381ce75cb56a
Detailed source fields Original source field Published value or condition stable_project_id kproj_a488241d73c4a642 stable_project_key prjtDef:234665:ESB project_definition 234665 first_region_code ESB manual_source_format false project_name 154kV 비응#3분기T/L 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(남비응분기) purpose 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2024.01~2026.12 project_scale_raw 4회선 약 1.45KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_a488241d73c4a642
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a488241d73c4a642
Sources EV-23555134daf1381ce75cb56a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6cdc4c5f97d8c085938cf22affcc4342b4045cf4b8317e5466c05ed5cb4650be Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234665|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6588c5cf1686e048
Sources EV-0e9b862f3c73040c62ab8321 Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147 행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234665|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6588c5cf1686e048
Sources EV-0e9b862f3c73040c62ab8321 Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147 행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_6588c5cf1686e048 stable_project_id kproj_a488241d73c4a642 source_key 202609|234665|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 군산지역 전기공급시설 전력구공사(남비응분기) project_name_detail 154kV 비응#3분기T/L 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2025.08 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2025.01 ~ 2025.10 기본설계: 2025.01 ~ 2025.06 실시설계: 2025.06 ~ 2025.08 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.12 공사 기간: 2025.12 ~ 2028.08 감독자: [redacted], 실적): 81, 37 future_plan_redacted □ 향후계획 ○25.12 : 공사착공 attachment_count 0 source_detail_sha256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234665|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6588c5cf1686e048
Sources EV-0e9b862f3c73040c62ab8321 Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147 행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a488241d73c4a642 stable_project_key prjtDef:234665:ESB project_definition 234665 first_region_code ESB manual_source_format false project_name 154kV 비응#3분기T/L 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(남비응분기) purpose 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2024.01~2026.12 project_scale_raw 4회선 약 1.45KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_a488241d73c4a642
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a488241d73c4a642
Sources EV-23555134daf1381ce75cb56a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6cdc4c5f97d8c085938cf22affcc4342b4045cf4b8317e5466c05ed5cb4650be Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ede2c204d1944b195b7512ba
Detailed source fields Original source field Published value or condition stable_project_id kproj_9a4e1c07eb5b2ef1 stable_project_key prjtDef:234356:ESB project_definition 234356 first_region_code ESB manual_source_format false project_name 154kV 비응#4-동비응 전력구 건설사업 project_name_list 154kV 서비응-동비응 관로 건설사업 purpose 새만금산단 전력공급 계통 보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2025.01~2027.12 project_scale_raw 2회선 관로 1.8KM, 전용교 42M responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_9a4e1c07eb5b2ef1
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9a4e1c07eb5b2ef1
Sources EV-ede2c204d1944b195b7512ba Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b12968e7f7f62b116dde455948437e9e8887ddeb37d8c263a0a18b60d613c7d7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234356|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_51a8fddda2e95aaa stable_project_id kproj_9a4e1c07eb5b2ef1 source_key 202609|234356|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 서비응-동비응 관로 건설사업 project_name_detail 154kV 비응#4-동비응 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2025.07 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2025.01 ~ 2026.06 기본설계: 2025.01 ~ 2026.03 실시설계: 2025.07 ~ 2026.06 설계담당자: [redacted] [추진현황] □'26.03 : 기본설계 심의 완료 □'26.06 : 실시설계 심의 완료 □'26.07 : 공사 입찰공고 □'26.08 : 건설사업관리용역 입찰공고 □'26.08 : 준공인가 전 사용승인신청서 제출 [향후계획] □'26.10 : 공사 착공 future_plan_redacted □ 향후계획 [추진현황] □'26.03 : 기본설계 심의 완료 □'26.06 : 실시설계 심의 완료 □'26.07 : 공사 입찰공고 □'26.08 : 건설사업관리용역 입찰공고 □'26.08 : 준공인가 전 사용승인신청서 제출 [향후계획] □'26.10 : 공사 착공 attachment_count 0 source_detail_sha256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234356|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_51a8fddda2e95aaa
Sources EV-afa21933e970765638b1cfef Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f 행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_9a4e1c07eb5b2ef1 stable_project_key prjtDef:234356:ESB project_definition 234356 first_region_code ESB manual_source_format false project_name 154kV 비응#4-동비응 전력구 건설사업 project_name_list 154kV 서비응-동비응 관로 건설사업 purpose 새만금산단 전력공급 계통 보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2025.01~2027.12 project_scale_raw 2회선 관로 1.8KM, 전용교 42M responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_9a4e1c07eb5b2ef1
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9a4e1c07eb5b2ef1
Sources EV-ede2c204d1944b195b7512ba Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b12968e7f7f62b116dde455948437e9e8887ddeb37d8c263a0a18b60d613c7d7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-bdf43c29e529bfadbb5611b7
Detailed source fields Original source field Published value or condition stable_project_id kproj_fad87c7018753b8d stable_project_key prjtDef:231339:ESB project_definition 231339 first_region_code ESB manual_source_format false project_name 154kV 사등S/S 건설사업 project_name_list 154kV 사등S/S 건설사업 purpose 거제 서부권 개발지역 부하 공급 project_region_detail 경상남도 거제시 project_period_raw 2013.06~2031.06 project_scale_raw 154KV M.TR(45/60MVA) * 2BANK responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_fad87c7018753b8d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fad87c7018753b8d
Sources EV-bdf43c29e529bfadbb5611b7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 54d7822dc67020abf1fec66a334502b49545e3b17e05aa6a6a17b2faac5b6c27 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2029-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2031-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2013-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2029-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2030-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231339|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e8b9d1a6f1774344 stable_project_id kproj_fad87c7018753b8d source_key 202609|231339|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 사등S/S 건설사업 project_name_detail 154kV 사등S/S 건설사업 region_summary_raw 경상남도 거제시등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR(45/60MVA) * 2BANK 입지선정 전력입지영향평가 용역 착수: 2025.07 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 16 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '24.05 : 산단 취소에 따른 관련부서 업무협의 □ '25.07 : 전력영향평가 용역발주 □ '26.02 : 입지선정위원회 구성완료 □ '26.04 : 입지선정위원회 1,2차 회의 시행 [향후계획] □ '26.09 : 변전소 입지 및 송전선로 경과지 확정 □ '27.03 : 전원개발사업 실시계획 신청 □ '29.09 : 용지매수 완료 □ '29.09 : 변전 실시설계 완료 □ '30.03 : 변전공사 착공 □ '31.06 : 변전공사 준공 future_plan_redacted □ 향후계획 [진행경과] □ '24.05 : 산단 취소에 따른 관련부서 업무협의 □ '25.07 : 전력영향평가 용역발주 □ '26.02 : 입지선정위원회 구성완료 □ '26.04 : 입지선정위원회 1,2차 회의 시행 [향후계획] □ '26.09 : 변전소 입지 및 송전선로 경과지 확정 □ '27.03 : 전원개발사업 실시계획 신청 □ '29.09 : 용지매수 완료 □ '29.09 : 변전 실시설계 완료 □ '30.03 : 변전공사 착공 □ '31.06 : 변전공사 준공 attachment_count 0 source_detail_sha256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231339|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e8b9d1a6f1774344
Sources EV-c99c6b4d93e1cbc2138a9cc0 Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84 행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_fad87c7018753b8d stable_project_key prjtDef:231339:ESB project_definition 231339 first_region_code ESB manual_source_format false project_name 154kV 사등S/S 건설사업 project_name_list 154kV 사등S/S 건설사업 purpose 거제 서부권 개발지역 부하 공급 project_region_detail 경상남도 거제시 project_period_raw 2013.06~2031.06 project_scale_raw 154KV M.TR(45/60MVA) * 2BANK responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_fad87c7018753b8d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fad87c7018753b8d
Sources EV-bdf43c29e529bfadbb5611b7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 54d7822dc67020abf1fec66a334502b49545e3b17e05aa6a6a17b2faac5b6c27 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-10 Sources EV-63899114248c46ac56abcd76
Detailed source fields Original source field Published value or condition stable_project_id kproj_f1d97c0ab4150d2e stable_project_key prjtDef:232377:ESB project_definition 232377 first_region_code ESB manual_source_format false project_name 154kV 사등분기T/L 건설사업 project_name_list 154kV 사등분기송전선로 건설사업 purpose 거제 인근지역 신규부하 전력공급 및 거제시 부하분담 project_region_detail 경상남도 거제시 project_period_raw 2013.03~2028.04 project_scale_raw PIAC 410×4C , 1.5KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_4b658a69340eed76 ksnap_59f09053cffabdf5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f1d97c0ab4150d2e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f1d97c0ab4150d2e
Sources EV-63899114248c46ac56abcd76 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4763f203631d6cc7feb14b15d47842984b085083d4f2944460fcf2cfeabdf997 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2013-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232377|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b658a69340eed76
Sources EV-8ac555c4e7f942bd2fb8a127 Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589 행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2013-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232377|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b658a69340eed76
Sources EV-8ac555c4e7f942bd2fb8a127 Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589 행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Previous Next