Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 비응#3분기T/L 전력구 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-23555134daf1381ce75cb56a
Sources EV-0e9b862f3c73040c62ab8321 Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147 행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713bSource snapshots by date · KOR · kepco_planned
154kV 비응#3분기T/L 전력구 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_6588c5cf1686e048
stable_project_id
kproj_a488241d73c4a642
source_key
202609|234665|ESB
basic_ym
202609
source_stage_raw
공사착수-사업완료전
project_name_list
군산지역 전기공급시설 전력구공사(남비응분기)
project_name_detail
154kV 비응#3분기T/L 전력구 건설사업
region_summary_raw
전북특별자치도 군산시등 1 지역
equipment_type_raw
전력구
headquarters_raw
중부건설본부
office_raw
전북건설지사
section_fields
Project purpose
계통보강
Project region
전북특별자치도 군산시
Project period
2024.01~2026.12
사업 규모
4회선 약 1.45KM
담당 사업소
중부건설본부/전북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2025.08
Sources EV-0e9b862f3c73040c62ab8321 Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147 행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713bSource snapshots by date · KOR · kepco_planned