POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 비응#3분기T/L 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-23555134daf1381ce75cb56a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a488241d73c4a642
stable_project_keyprjtDef:234665:ESB
project_definition234665
first_region_codeESB
manual_source_formatfalse
project_name154kV 비응#3분기T/L 전력구 건설사업
project_name_list군산지역 전기공급시설 전력구공사(남비응분기)
purpose계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.01~2026.12
project_scale_raw4회선 약 1.45KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6588c5cf1686e048
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_a488241d73c4a642

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a488241d73c4a642

Sources EV-23555134daf1381ce75cb56a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6cdc4c5f97d8c085938cf22affcc4342b4045cf4b8317e5466c05ed5cb4650be
Source schedule candidates · KOR · kepco_planned

154kV 비응#3분기T/L 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234665|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6588c5cf1686e048

Sources EV-0e9b862f3c73040c62ab8321
Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147
행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713b
Source schedule candidates · KOR · kepco_planned

154kV 비응#3분기T/L 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234665|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6588c5cf1686e048

Sources EV-0e9b862f3c73040c62ab8321
Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147
행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713b
Source snapshots by date · KOR · kepco_planned

154kV 비응#3분기T/L 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6588c5cf1686e048
stable_project_idkproj_a488241d73c4a642
source_key202609|234665|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list군산지역 전기공급시설 전력구공사(남비응분기)
project_name_detail154kV 비응#3분기T/L 전력구 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 계통보강
Project region
  • 전북특별자치도 군산시
Project period
  • 2024.01~2026.12
사업 규모
  • 4회선 약 1.45KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2025.08
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2025.01 ~ 2025.10 기본설계: 2025.01 ~ 2025.06 실시설계: 2025.06 ~ 2025.08 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.12 공사 기간: 2025.12 ~ 2028.08 감독자: [redacted], 실적): 81, 37
○25.12 : 공사착공
future_plan_redacted□ 향후계획 ○25.12 : 공사착공
attachment_count0
source_detail_sha2569b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234665|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6588c5cf1686e048

Sources EV-0e9b862f3c73040c62ab8321
Evidence SHA-256 9b62f690ee0c5b49e692d067dc2ff13caf1f73c475dc62e7628e95d9ed8de147
행 SHA-256 d65ace23bee29dc1c42b62c701cad7a24acd12c93361112adff236c3ce52713b
Source snapshots by date · KOR · kepco_planned

154kV 비응#3분기T/L 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a488241d73c4a642
stable_project_keyprjtDef:234665:ESB
project_definition234665
first_region_codeESB
manual_source_formatfalse
project_name154kV 비응#3분기T/L 전력구 건설사업
project_name_list군산지역 전기공급시설 전력구공사(남비응분기)
purpose계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.01~2026.12
project_scale_raw4회선 약 1.45KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6588c5cf1686e048
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_a488241d73c4a642

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a488241d73c4a642

Sources EV-23555134daf1381ce75cb56a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6cdc4c5f97d8c085938cf22affcc4342b4045cf4b8317e5466c05ed5cb4650be

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel