POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-517ff66b36b07b4733ab6463
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_27c9e022e76bba93
stable_project_keyprjtDef:233669:ESB
project_definition233669
first_region_codeESB
manual_source_formatfalse
project_name154kV 북현덕분기 지중T/L
project_name_list154kV 북현덕분기 지중T/L 건설공사
purpose전력계통 보강
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2024.12~2025.12
project_scale_raw154KV 2500㎟×4C-2.7KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c325baefaffe15cc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_27c9e022e76bba93

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_27c9e022e76bba93

Sources EV-517ff66b36b07b4733ab6463
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2603b229e541e5d0eed572290498c1f1c960a4060346a6c9e85632b303536c79
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source snapshots by date · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c325baefaffe15cc
stable_project_idkproj_27c9e022e76bba93
source_key202609|233669|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북현덕분기 지중T/L 건설공사
project_name_detail154kV 북현덕분기 지중T/L
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 전력계통 보강
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2024.12~2025.12
사업 규모
  • 154KV 2500㎟×4C-2.7KM
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.12 공사 기간: 2024.12 ~ 2026.07 감독자: [redacted], 실적): 100, 39
□ '24.12 : 공사 착공 □ '25.12 : 공사 중지[선행공정(변전소, 토목) 대기] □ '26.07 : 공사 재개 □ 선행공정 지연에 따른 준공목표 변경 추진 예상 ('25.10 → '27.04)
future_plan_redacted□ 향후계획 □ '24.12 : 공사 착공 □ '25.12 : 공사 중지[선행공정(변전소, 토목) 대기] □ '26.07 : 공사 재개 □ 선행공정 지연에 따른 준공목표 변경 추진 예상 ('25.10 → '27.04)
attachment_count0
source_detail_sha256b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233669|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c325baefaffe15cc

Sources EV-7ed3d1162a0f4aad2eeeaff8
Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127
행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368
Source snapshots by date · KOR · kepco_planned

154kV 북현덕분기 지중T/L

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_27c9e022e76bba93
stable_project_keyprjtDef:233669:ESB
project_definition233669
first_region_codeESB
manual_source_formatfalse
project_name154kV 북현덕분기 지중T/L
project_name_list154kV 북현덕분기 지중T/L 건설공사
purpose전력계통 보강
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2024.12~2025.12
project_scale_raw154KV 2500㎟×4C-2.7KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c325baefaffe15cc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_27c9e022e76bba93

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_27c9e022e76bba93

Sources EV-517ff66b36b07b4733ab6463
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2603b229e541e5d0eed572290498c1f1c960a4060346a6c9e85632b303536c79

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel