POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 30items · current page 1–30 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-63899114248c46ac56abcd76
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f1d97c0ab4150d2e
stable_project_keyprjtDef:232377:ESB
project_definition232377
first_region_codeESB
manual_source_formatfalse
project_name154kV 사등분기T/L 건설사업
project_name_list154kV 사등분기송전선로 건설사업
purpose거제 인근지역 신규부하 전력공급 및 거제시 부하분담
project_region_detail경상남도 거제시
project_period_raw2013.03~2028.04
project_scale_rawPIAC 410×4C , 1.5KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_4b658a69340eed76
  • ksnap_59f09053cffabdf5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f1d97c0ab4150d2e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f1d97c0ab4150d2e

Sources EV-63899114248c46ac56abcd76
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4763f203631d6cc7feb14b15d47842984b085083d4f2944460fcf2cfeabdf997
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2027-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2013-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232377|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b658a69340eed76

Sources EV-8ac555c4e7f942bd2fb8a127
Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589
행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2013-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232377|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b658a69340eed76

Sources EV-8ac555c4e7f942bd2fb8a127
Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589
행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2013-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source schedule candidates · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232377|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source snapshots by date · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_4b658a69340eed76
stable_project_idkproj_f1d97c0ab4150d2e
source_key202609|232377|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 사등분기송전선로 건설사
project_name_detail154kV 사등분기T/L 건설사업
region_summary_raw경상남도 거제시등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 거제 인근지역 신규부하 전력공급 및 거제시 부하분담
Project region
  • 경상남도 거제시
Project period
  • 2013.03~2028.04
사업 규모
  • PIAC 410×4C , 1.5KM
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2025.09 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 17 지장유무 조회: 2026.08~ 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 2026.08 ~ 재해영향평가: 2026.08 ~
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청(거제시청,제39보병사단)
[추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청(거제시청, 제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청
future_plan_redacted□ 향후계획 [추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청(거제시청, 제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청
attachment_count0
source_detail_sha256200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232377|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b658a69340eed76

Sources EV-8ac555c4e7f942bd2fb8a127
Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589
행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885
Source snapshots by date · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_59f09053cffabdf5
stable_project_idkproj_f1d97c0ab4150d2e
source_key202610|232377|ESB
basic_ym202610
source_stage_raw계획확정-사업승인전
project_name_list154kV 사등분기송전선로 건설사업
project_name_detail154kV 사등분기T/L 건설사업
region_summary_raw경상남도 거제시등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 거제 인근지역 신규부하 전력공급 및 거제시 부하분담
Project region
  • 경상남도 거제시
Project period
  • 2013.03~2028.04
사업 규모
  • PIAC 410×4C , 1.5KM
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2025.09 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 17 지장유무 조회: 2026.08~ 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 2026.08 ~ 재해영향평가: 2026.08 ~
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청 (거제시청,제39보병사단) □ '26.09 : 지장유무 조회 회신 (거제시청,제39보병사단)
[추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청 (거제시청, 제39보병사단) □ '26.09 : 지장유무 조회 회신 (거제시청,제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청
future_plan_redacted□ 향후계획 [추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청 (거제시청, 제39보병사단) □ '26.09 : 지장유무 조회 회신 (거제시청,제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청
attachment_count0
source_detail_sha256debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202610
source_record_id202610|232377|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_59f09053cffabdf5

Sources EV-fe776d9ab7f5e2e8e84fcccf
Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554
행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba
Source snapshots by date · KOR · kepco_planned

154kV 사등분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f1d97c0ab4150d2e
stable_project_keyprjtDef:232377:ESB
project_definition232377
first_region_codeESB
manual_source_formatfalse
project_name154kV 사등분기T/L 건설사업
project_name_list154kV 사등분기송전선로 건설사업
purpose거제 인근지역 신규부하 전력공급 및 거제시 부하분담
project_region_detail경상남도 거제시
project_period_raw2013.03~2028.04
project_scale_rawPIAC 410×4C , 1.5KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_4b658a69340eed76
  • ksnap_59f09053cffabdf5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f1d97c0ab4150d2e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f1d97c0ab4150d2e

Sources EV-63899114248c46ac56abcd76
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4763f203631d6cc7feb14b15d47842984b085083d4f2944460fcf2cfeabdf997

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel