POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 19items · current page 1–19 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-ede2c204d1944b195b7512ba
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9a4e1c07eb5b2ef1
stable_project_keyprjtDef:234356:ESB
project_definition234356
first_region_codeESB
manual_source_formatfalse
project_name154kV 비응#4-동비응 전력구 건설사업
project_name_list154kV 서비응-동비응 관로 건설사업
purpose새만금산단 전력공급 계통 보강
project_region_detail전북특별자치도 군산시
project_period_raw2025.01~2027.12
project_scale_raw2회선 관로 1.8KM, 전용교 42M
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_51a8fddda2e95aaa
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9a4e1c07eb5b2ef1

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9a4e1c07eb5b2ef1

Sources EV-ede2c204d1944b195b7512ba
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b12968e7f7f62b116dde455948437e9e8887ddeb37d8c263a0a18b60d613c7d7
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source schedule candidates · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234356|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source snapshots by date · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_51a8fddda2e95aaa
stable_project_idkproj_9a4e1c07eb5b2ef1
source_key202609|234356|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 서비응-동비응 관로 건설사업
project_name_detail154kV 비응#4-동비응 전력구 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금산단 전력공급 계통 보강
Project region
  • 전북특별자치도 군산시
Project period
  • 2025.01~2027.12
사업 규모
  • 2회선 관로 1.8KM, 전용교 42M
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2025.07
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2025.01 ~ 2026.06 기본설계: 2025.01 ~ 2026.03 실시설계: 2025.07 ~ 2026.06 설계담당자: [redacted]
[추진현황] □'26.03 : 기본설계 심의 완료 □'26.06 : 실시설계 심의 완료 □'26.07 : 공사 입찰공고 □'26.08 : 건설사업관리용역 입찰공고 □'26.08 : 준공인가 전 사용승인신청서 제출 [향후계획] □'26.10 : 공사 착공
future_plan_redacted□ 향후계획 [추진현황] □'26.03 : 기본설계 심의 완료 □'26.06 : 실시설계 심의 완료 □'26.07 : 공사 입찰공고 □'26.08 : 건설사업관리용역 입찰공고 □'26.08 : 준공인가 전 사용승인신청서 제출 [향후계획] □'26.10 : 공사 착공
attachment_count0
source_detail_sha256f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234356|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_51a8fddda2e95aaa

Sources EV-afa21933e970765638b1cfef
Evidence SHA-256 f092666943f835d7ac011b85c70a93fcd45d387831625d3f018522856be4a97f
행 SHA-256 70c6e55744b1162070b9596191db14a9b5613d87d99fb08e3c348d4c2d359d49
Source snapshots by date · KOR · kepco_planned

154kV 비응#4-동비응 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9a4e1c07eb5b2ef1
stable_project_keyprjtDef:234356:ESB
project_definition234356
first_region_codeESB
manual_source_formatfalse
project_name154kV 비응#4-동비응 전력구 건설사업
project_name_list154kV 서비응-동비응 관로 건설사업
purpose새만금산단 전력공급 계통 보강
project_region_detail전북특별자치도 군산시
project_period_raw2025.01~2027.12
project_scale_raw2회선 관로 1.8KM, 전용교 42M
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_51a8fddda2e95aaa
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9a4e1c07eb5b2ef1

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9a4e1c07eb5b2ef1

Sources EV-ede2c204d1944b195b7512ba
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b12968e7f7f62b116dde455948437e9e8887ddeb37d8c263a0a18b60d613c7d7

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel