POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 30items · current page 1–30 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-10 Sources EV-63899114248c46ac56abcd76
Detailed source fields Original source field Published value or condition stable_project_id kproj_f1d97c0ab4150d2e stable_project_key prjtDef:232377:ESB project_definition 232377 first_region_code ESB manual_source_format false project_name 154kV 사등분기T/L 건설사업 project_name_list 154kV 사등분기송전선로 건설사업 purpose 거제 인근지역 신규부하 전력공급 및 거제시 부하분담 project_region_detail 경상남도 거제시 project_period_raw 2013.03~2028.04 project_scale_raw PIAC 410×4C , 1.5KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_4b658a69340eed76 ksnap_59f09053cffabdf5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f1d97c0ab4150d2e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f1d97c0ab4150d2e
Sources EV-63899114248c46ac56abcd76 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4763f203631d6cc7feb14b15d47842984b085083d4f2944460fcf2cfeabdf997 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2013-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232377|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b658a69340eed76
Sources EV-8ac555c4e7f942bd2fb8a127 Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589 행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2013-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232377|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b658a69340eed76
Sources EV-8ac555c4e7f942bd2fb8a127 Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589 행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2013-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232377|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4b658a69340eed76 stable_project_id kproj_f1d97c0ab4150d2e source_key 202609|232377|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 사등분기송전선로 건설사 project_name_detail 154kV 사등분기T/L 건설사업 region_summary_raw 경상남도 거제시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 거제 인근지역 신규부하 전력공급 및 거제시 부하분담 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2025.09 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 17 지장유무 조회: 2026.08~ 경과지(부지) 확정: 환경/재해 영향평가 환경영향평가: 2026.08 ~ 재해영향평가: 2026.08 ~ 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청(거제시청,제39보병사단) [추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청(거제시청, 제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청 future_plan_redacted □ 향후계획 [추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청(거제시청, 제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청 attachment_count 0 source_detail_sha256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232377|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b658a69340eed76
Sources EV-8ac555c4e7f942bd2fb8a127 Evidence SHA-256 200480c68ac0e0a72e9f281d6f5caf835806a6cf9d5911873ff3f5acf787b589 행 SHA-256 0d58f736a64fb6bbba5ec469d189e2ab8309fc86bad9f4fd62d2cb29a8b0a885 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_59f09053cffabdf5 stable_project_id kproj_f1d97c0ab4150d2e source_key 202610|232377|ESB basic_ym 202610 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 사등분기송전선로 건설사업 project_name_detail 154kV 사등분기T/L 건설사업 region_summary_raw 경상남도 거제시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 거제 인근지역 신규부하 전력공급 및 거제시 부하분담 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2025.09 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 17 지장유무 조회: 2026.08~ 경과지(부지) 확정: 환경/재해 영향평가 환경영향평가: 2026.08 ~ 재해영향평가: 2026.08 ~ 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청 (거제시청,제39보병사단) □ '26.09 : 지장유무 조회 회신 (거제시청,제39보병사단) [추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청 (거제시청, 제39보병사단) □ '26.09 : 지장유무 조회 회신 (거제시청,제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청 future_plan_redacted □ 향후계획 [추진실적] □ '13.03. : 제6차 장기송변전설비계획 신규반영 □ '15.03.∼'23.04. : 거제해양플랜트 국가산업단지 사업계획 지연 및 사업취소 □ '24.05 : 국가산단 사업취소에 따른 사업계획 재검토 □ '25.02 : 사등변전소 및 관련사업 재추진 관련 회신 □ '25.09 : 전력영향평가 및 경과지설계 용역 착수 □ '26.03 : 입지선정위원회 구성 완료 □ '26.04 ~ 07 : 입지선정위원회 1~4차 회의 시행 □ '26.08 : 지장유무 조회 요청 (거제시청, 제39보병사단) □ '26.09 : 지장유무 조회 회신 (거제시청,제39보병사단) [향후계획] □ '27.04 : 실시계획 승인신청 attachment_count 0 source_detail_sha256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202610 source_record_id 202610|232377|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_59f09053cffabdf5
Sources EV-fe776d9ab7f5e2e8e84fcccf Evidence SHA-256 debaa60415fec22bcfa294e8c1a8b526effbf3202f5a495dd2f9137bcc075554 행 SHA-256 2ebf46f21956c7c0a33ca4f46ed1dfcace9e76dd5274e4f3d5e32021f6a0f3ba Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f1d97c0ab4150d2e stable_project_key prjtDef:232377:ESB project_definition 232377 first_region_code ESB manual_source_format false project_name 154kV 사등분기T/L 건설사업 project_name_list 154kV 사등분기송전선로 건설사업 purpose 거제 인근지역 신규부하 전력공급 및 거제시 부하분담 project_region_detail 경상남도 거제시 project_period_raw 2013.03~2028.04 project_scale_raw PIAC 410×4C , 1.5KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_4b658a69340eed76 ksnap_59f09053cffabdf5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f1d97c0ab4150d2e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f1d97c0ab4150d2e
Sources EV-63899114248c46ac56abcd76 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4763f203631d6cc7feb14b15d47842984b085083d4f2944460fcf2cfeabdf997 Observations for this power asset History for this project