Power assets and projects · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-a5a5ea5087aabe095cb2550a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_3822d5c7089819ae
stable_project_keyprjtDef:232776:ESB
project_definition232776
first_region_codeESB
manual_source_formatfalse
project_name154kV 북홍천분기T/L 건설사업
project_name_list154kV 북홍천분기 송전선로 건설사업
purpose홍천변전소 과부하 전망에 따른 변전소 신설 필요
project_region_detail강원특별자치도 홍천군
project_period_raw2026.07~2032.10
project_scale_rawACSR330㎟ × S × 4C-3.2KM
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_2455f82ed7c085ea
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_3822d5c7089819ae

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_3822d5c7089819ae

Sources EV-a5a5ea5087aabe095cb2550a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0ee73ef2cf2b3425bb2b0f2c6848fa4b4693c37219e9dc70af00bfab31c3a83c
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source schedule candidates · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232776|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source snapshots by date · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_2455f82ed7c085ea
stable_project_idkproj_3822d5c7089819ae
source_key202609|232776|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북홍천분기 송전선로 건설사업
project_name_detail154kV 북홍천분기T/L 건설사업
region_summary_raw강원특별자치도 홍천군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 홍천변전소 과부하 전망에 따른 변전소 신설 필요
Project region
  • 강원특별자치도 홍천군
Project period
  • 2026.07~2032.10
사업 규모
  • ACSR330㎟ × S × 4C-3.2KM
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2026.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ ‘25.05 : 제11차 장기송변전설비계획 사업 신규반영 □ ‘26.07 : 전력입지영향평가 용역 계약 및 착수 완료 □ ‘26.08 : 지자체 대상 사업설명회
□ ‘26.09 : 읍·면·동 대상 사업설명회 □ ‘26.11 : 입지선정위원회 구성
future_plan_redacted□ 향후계획 □ ‘26.09 : 읍·면·동 대상 사업설명회 □ ‘26.11 : 입지선정위원회 구성
attachment_count0
source_detail_sha256c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232776|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2455f82ed7c085ea

Sources EV-368ef6802ee36f7676fd554d
Evidence SHA-256 c45d9c17ac53eec395477f5b97cba654f49c5f8bd96ee8c074550f86a6123f35
행 SHA-256 d9970e6e98e25ca7ffb32a5722cfa341d648c5255e0def6719ba9220d2657afb
Source snapshots by date · KOR · kepco_planned

154kV 북홍천분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_3822d5c7089819ae
stable_project_keyprjtDef:232776:ESB
project_definition232776
first_region_codeESB
manual_source_formatfalse
project_name154kV 북홍천분기T/L 건설사업
project_name_list154kV 북홍천분기 송전선로 건설사업
purpose홍천변전소 과부하 전망에 따른 변전소 신설 필요
project_region_detail강원특별자치도 홍천군
project_period_raw2026.07~2032.10
project_scale_rawACSR330㎟ × S × 4C-3.2KM
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type가공송전
headquarters중부건설본부
office충북강원건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_2455f82ed7c085ea
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_3822d5c7089819ae

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_3822d5c7089819ae

Sources EV-a5a5ea5087aabe095cb2550a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0ee73ef2cf2b3425bb2b0f2c6848fa4b4693c37219e9dc70af00bfab31c3a83c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel