POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 18items · current page 1–18 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 사등S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-bdf43c29e529bfadbb5611b7
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fad87c7018753b8d
stable_project_keyprjtDef:231339:ESB
project_definition231339
first_region_codeESB
manual_source_formatfalse
project_name154kV 사등S/S 건설사업
project_name_list154kV 사등S/S 건설사업
purpose거제 서부권 개발지역 부하 공급
project_region_detail경상남도 거제시
project_period_raw2013.06~2031.06
project_scale_raw154KV M.TR(45/60MVA) * 2BANK
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e8b9d1a6f1774344
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_fad87c7018753b8d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fad87c7018753b8d

Sources EV-bdf43c29e529bfadbb5611b7
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54d7822dc67020abf1fec66a334502b49545e3b17e05aa6a6a17b2faac5b6c27
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2029-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2031-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2013-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2029-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source schedule candidates · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2030-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231339|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source snapshots by date · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e8b9d1a6f1774344
stable_project_idkproj_fad87c7018753b8d
source_key202609|231339|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 사등S/S 건설사업
project_name_detail154kV 사등S/S 건설사업
region_summary_raw경상남도 거제시등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 거제 서부권 개발지역 부하 공급
Project region
  • 경상남도 거제시
Project period
  • 2013.06~2031.06
사업 규모
  • 154KV M.TR(45/60MVA) * 2BANK
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2025.07 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 16 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] □ '24.05 : 산단 취소에 따른 관련부서 업무협의 □ '25.07 : 전력영향평가 용역발주 □ '26.02 : 입지선정위원회 구성완료 □ '26.04 : 입지선정위원회 1,2차 회의 시행 [향후계획] □ '26.09 : 변전소 입지 및 송전선로 경과지 확정 □ '27.03 : 전원개발사업 실시계획 신청 □ '29.09 : 용지매수 완료 □ '29.09 : 변전 실시설계 완료 □ '30.03 : 변전공사 착공 □ '31.06 : 변전공사 준공
future_plan_redacted□ 향후계획 [진행경과] □ '24.05 : 산단 취소에 따른 관련부서 업무협의 □ '25.07 : 전력영향평가 용역발주 □ '26.02 : 입지선정위원회 구성완료 □ '26.04 : 입지선정위원회 1,2차 회의 시행 [향후계획] □ '26.09 : 변전소 입지 및 송전선로 경과지 확정 □ '27.03 : 전원개발사업 실시계획 신청 □ '29.09 : 용지매수 완료 □ '29.09 : 변전 실시설계 완료 □ '30.03 : 변전공사 착공 □ '31.06 : 변전공사 준공
attachment_count0
source_detail_sha256eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231339|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8b9d1a6f1774344

Sources EV-c99c6b4d93e1cbc2138a9cc0
Evidence SHA-256 eb438a6c46634d9147f761f6f822a80f30b33e104ec7af501993469d03bb1f84
행 SHA-256 6a28bd88917c4b07740380c7a2a3e512e0bd55f6c88458304fce2169d6499c8f
Source snapshots by date · KOR · kepco_planned

154kV 사등S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fad87c7018753b8d
stable_project_keyprjtDef:231339:ESB
project_definition231339
first_region_codeESB
manual_source_formatfalse
project_name154kV 사등S/S 건설사업
project_name_list154kV 사등S/S 건설사업
purpose거제 서부권 개발지역 부하 공급
project_region_detail경상남도 거제시
project_period_raw2013.06~2031.06
project_scale_raw154KV M.TR(45/60MVA) * 2BANK
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e8b9d1a6f1774344
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_fad87c7018753b8d

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fad87c7018753b8d

Sources EV-bdf43c29e529bfadbb5611b7
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54d7822dc67020abf1fec66a334502b49545e3b17e05aa6a6a17b2faac5b6c27

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel