POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 2501–2600 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2009-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type settlement_completion date 2028-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232295|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_2bdce838bf6ace49 stable_project_id kproj_9f9106a9612397ba source_key 202609|232295|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북창녕분기 송전선로 건설사업 project_name_detail 154kV 북창녕분기T/L 건설사업 region_summary_raw 경상남도 창녕군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 ACSR 410㎟×B×4C×0.5KM, 철탑3기 입지선정 전력입지영향평가 용역 착수: 2009.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산 future_plan_redacted □ 향후계획 [추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산 attachment_count 0 source_detail_sha256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232295|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2bdce838bf6ace49
Sources EV-3ce4072c8ce601aedccbdd69 Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c 행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_52c3eec5d34507f2 stable_project_id kproj_9f9106a9612397ba source_key 202610|232295|ESB basic_ym 202610 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 북창녕분기 송전선로 건설사업 project_name_detail 154kV 북창녕분기T/L 건설사업 region_summary_raw 경상남도 창녕군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 ACSR 410㎟×B×4C×0.5KM, 철탑3기 계획확정 제04차 장기송변전설비계획 반영(2009.03) 입지선정 전력입지영향평가 용역 착수: 2009.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2026.03 ~ 2026.03 실시설계: 2026.06 ~ 2026.06 설계담당자: [redacted] 건설공사 개요 공사 착공: 공사 기간: 감독자: [redacted], 실적): 86, 68 [추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산 future_plan_redacted □ 향후계획 [추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산 attachment_count 0 source_detail_sha256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202610 source_record_id 202610|232295|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52c3eec5d34507f2
Sources EV-4d971c86e8d0a304e0376da2 Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25 행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_9f9106a9612397ba stable_project_key prjtDef:232295:ESB project_definition 232295 first_region_code ESB manual_source_format false project_name 154kV 북창녕분기T/L 건설사업 project_name_list 154kV 북창녕분기 송전선로 건설사업 purpose 창녕 대합일반산업단지 개발 신규부하공급 project_region_detail 경상남도 창녕군 project_period_raw 2024.03~2028.05 project_scale_raw ACSR 410㎟×B×4C×0.5KM, 철탑3기 responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_2bdce838bf6ace49 ksnap_52c3eec5d34507f2 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_9f9106a9612397ba
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9f9106a9612397ba
Sources EV-e3abb88591b9e11d024a9275 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e70df9685aa5c0be94a73d650c68321fe95a3a9705a6ebacee93361224e114a5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-29d387df88276b084bd8e431
Detailed source fields Original source field Published value or condition stable_project_id kproj_45f60b5ff9188f28 stable_project_key prjtDef:232742:ESB project_definition 232742 first_region_code ESB manual_source_format false project_name 154kV 북천안분기T/L 건설사업 project_name_list 154kV 북천안분기 송전선로 건설사업 purpose 택지지구·산단 등 지역개발 계획과 연계한 전력망 구축 project_region_detail 충청남도 천안시 동남구 project_period_raw 2027.11~2031.10 project_scale_raw ACSR 410MM2 × 2B × 4C × 1.5㎞(현재 약 0.15㎞) responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_45f60b5ff9188f28
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_45f60b5ff9188f28
Sources EV-29d387df88276b084bd8e431 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f374b53f5e195373b3da7906e64f345409f05409e807d3d85b35f0ec781992cc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232742|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232742|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2027-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232742|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232742|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232742|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232742|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_915a69c3c9084512 stable_project_id kproj_45f60b5ff9188f28 source_key 202609|232742|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북천안분기 송전선로 건설사업 project_name_detail 154kV 북천안분기T/L 건설사업 region_summary_raw 충청남도 천안시 동남구등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project purpose 택지지구·산단 등 지역개발 계획과 연계한 전력망 구축 사업 규모 ACSR 410MM2 × 2B × 4C × 1.5㎞(현재 약 0.15㎞) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: line [주요 추진경과] □ '25.05 제11차 장기 송·변전설비계획 수립 □ '25.07 345kV 북천안S/S 최적부지 선정(동면 광덕리 305 일원) □ '26.06 전력입지영향평가 용역 계약체결 □ '26.07 전력입지영향평가 용역 착수회의 시 future_plan_redacted line □ 향후계획 [주요 추진경과] □ '25.05 제11차 장기 송·변전설비계획 수립 □ '25.07 345kV 북천안S/S 최적부지 선정(동면 광덕리 305 일원) □ '26.06 전력입지영향평가 용역 계약체결 □ '26.07 전력입지영향평가 용역 착수회의 시 attachment_count 0 source_detail_sha256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232742|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_915a69c3c9084512
Sources EV-28d84f54bd9cfe7ac8b2ee81 Evidence SHA-256 f69e8b8df192b446e6652063e068f4823b9cd33c547d90892304430e83bcced4 행 SHA-256 2a9ea11f4c0c5767756f182cf653e9e8644b5b6f321ae4b64dc7b09ae294b961 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_45f60b5ff9188f28 stable_project_key prjtDef:232742:ESB project_definition 232742 first_region_code ESB manual_source_format false project_name 154kV 북천안분기T/L 건설사업 project_name_list 154kV 북천안분기 송전선로 건설사업 purpose 택지지구·산단 등 지역개발 계획과 연계한 전력망 구축 project_region_detail 충청남도 천안시 동남구 project_period_raw 2027.11~2031.10 project_scale_raw ACSR 410MM2 × 2B × 4C × 1.5㎞(현재 약 0.15㎞) responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_45f60b5ff9188f28
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_45f60b5ff9188f28
Sources EV-29d387df88276b084bd8e431 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f374b53f5e195373b3da7906e64f345409f05409e807d3d85b35f0ec781992cc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-0d5b48d5be66f4c120334e7b
Detailed source fields Original source field Published value or condition stable_project_id kproj_da9dc91d8bdaf6cf stable_project_key prjtDef:231493:ESB project_definition 231493 first_region_code ESB manual_source_format false project_name 154kV 북통진S/S 건설사업 project_name_list 154kV 북통진S/S 건설사업 purpose 김포북부지역 신규전력 공급 및 인근변전소 부하분담 project_region_detail 경기도 김포시 project_period_raw 2019.10~2027.12 project_scale_raw 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_da9dc91d8bdaf6cf
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_da9dc91d8bdaf6cf
Sources EV-0d5b48d5be66f4c120334e7b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 aed108cb1c3f17f4c3a6f5786226407dcea3eeafc6a4d4d6b08f5489633a8103 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09-29 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2022-11-17 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09-02 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2025-10-29 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_837f11204255fe90 stable_project_id kproj_da9dc91d8bdaf6cf source_key 202609|231493|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북통진S/S 건설사업 project_name_detail 154kV 북통진S/S 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields Project purpose 김포북부지역 신규전력 공급 및 인근변전소 부하분담 사업 규모 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT 입지선정 전력입지영향평가 용역 착수: 2020.08 입지선정위원회 구성시기: 2021.08 참여 위원 수 : 10 지장유무 조회: 2021.05~2021.06 경과지(부지) 확정: 환경/재해 영향평가 환경영향평가: 2021.10 ~ 2021.10 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2021.09 ~ 2021.10 설명회·공청회: 2021.09 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] □ ‘19.12 : 김포지역 154kV 변전소 및 관련사업 신설 검토결과 알림(←계통계획실) □ ‘20.08 : 입지선정위한 전력영향평가 용역 착수 □ ‘21.02∼’21.07 : 입지선정위원회의 1차 ∼ 6차회의 시행 (후보지 선정완료) □ ‘21.09.02 : 입지확정 □ ‘21.09.29 : 주민설명회 시행 □ ‘22.11.17 : 실시계획 승인 □ ‘25.10.29 : 실시계획 변경 승인 □ 향후계획 ○ `26. 06월 : 변전소 토건/변전공사 착공 ○ `27. 12월 : 기기가압 future_plan_redacted □ 향후계획 □ ‘19.12 : 김포지역 154kV 변전소 및 관련사업 신설 검토결과 알림(←계통계획실) □ ‘20.08 : 입지선정위한 전력영향평가 용역 착수 □ ‘21.02∼’21.07 : 입지선정위원회의 1차 ∼ 6차회의 시행 (후보지 선정완료) □ ‘21.09.02 : 입지확정 □ ‘21.09.29 : 주민설명회 시행 □ ‘22.11.17 : 실시계획 승인 □ ‘25.10.29 : 실시계획 변경 승인 □ 향후계획 ○ `26. 06월 : 변전소 토건/변전공사 착공 ○ `27. 12월 : 기기가압 attachment_count 0 source_detail_sha256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231493|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_da9dc91d8bdaf6cf stable_project_key prjtDef:231493:ESB project_definition 231493 first_region_code ESB manual_source_format false project_name 154kV 북통진S/S 건설사업 project_name_list 154kV 북통진S/S 건설사업 purpose 김포북부지역 신규전력 공급 및 인근변전소 부하분담 project_region_detail 경기도 김포시 project_period_raw 2019.10~2027.12 project_scale_raw 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_da9dc91d8bdaf6cf
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_da9dc91d8bdaf6cf
Sources EV-0d5b48d5be66f4c120334e7b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 aed108cb1c3f17f4c3a6f5786226407dcea3eeafc6a4d4d6b08f5489633a8103 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-62e63b72d0e5228a2a81cfaa
Detailed source fields Original source field Published value or condition stable_project_id kproj_682aa90d16c90105 stable_project_key prjtDef:234645:ESB project_definition 234645 first_region_code ESB manual_source_format false project_name 154kV 북통진분기 전력구 건설사업 project_name_list 김포북부지역 전기공급시설 전력구공사 purpose 김포 북부지역 공급능력 확보 및 부하분담 project_region_detail 경기도 김포시 project_period_raw 2022.03~2027.12 project_scale_raw 총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 전력구 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_682aa90d16c90105
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_682aa90d16c90105
Sources EV-62e63b72d0e5228a2a81cfaa Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 483b26404b761bf62a26edf78d46ea54222aaa41931282ac3807f402b56932c9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234645|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d748ddfd6920155b
Sources EV-cb102361c72a865ca6aad36f Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590 행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234645|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d748ddfd6920155b
Sources EV-cb102361c72a865ca6aad36f Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590 행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d748ddfd6920155b stable_project_id kproj_682aa90d16c90105 source_key 202609|234645|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 김포북부지역 전기공급시설 전력구공사 project_name_detail 154kV 북통진분기 전력구 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.05 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2022.07 ~ 2025.03 기본설계: 2022.07 ~ 2024.05 실시설계: 2024.06 ~ 2025.05 설계담당자: [redacted] ○ '24.05 : 기본설계심의 ○ '24.07 : 공사시행계획(안) 확정 ○ '24.08 : 2차 지반조사 시행 ○ '24.09 : GPR 탐사 시행 ○ '24.10 : 실시설계 심의 시행 ○ '25.05 : 설계완료 및 계약의뢰 ○ '25.09 : 계약완료 ○ '25.10 : 공사착공 ○ '25.12 : 공사중지 ○ '26.04 : 공사재개 및 관로공사 착수 future_plan_redacted □ 향후계획 ○ '24.05 : 기본설계심의 ○ '24.07 : 공사시행계획(안) 확정 ○ '24.08 : 2차 지반조사 시행 ○ '24.09 : GPR 탐사 시행 ○ '24.10 : 실시설계 심의 시행 ○ '25.05 : 설계완료 및 계약의뢰 ○ '25.09 : 계약완료 ○ '25.10 : 공사착공 ○ '25.12 : 공사중지 ○ '26.04 : 공사재개 및 관로공사 착수 attachment_count 0 source_detail_sha256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234645|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d748ddfd6920155b
Sources EV-cb102361c72a865ca6aad36f Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590 행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_682aa90d16c90105 stable_project_key prjtDef:234645:ESB project_definition 234645 first_region_code ESB manual_source_format false project_name 154kV 북통진분기 전력구 건설사업 project_name_list 김포북부지역 전기공급시설 전력구공사 purpose 김포 북부지역 공급능력 확보 및 부하분담 project_region_detail 경기도 김포시 project_period_raw 2022.03~2027.12 project_scale_raw 총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 전력구 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_682aa90d16c90105
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_682aa90d16c90105
Sources EV-62e63b72d0e5228a2a81cfaa Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 483b26404b761bf62a26edf78d46ea54222aaa41931282ac3807f402b56932c9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e9854fd908af564b222a8f33
Detailed source fields Original source field Published value or condition stable_project_id kproj_12a56d0ce6f49379 stable_project_key prjtDef:233685:ESB project_definition 233685 first_region_code ESB manual_source_format false project_name 154kV 북통진분기 지중T/L 건설사업 project_name_list 154kV 북통진분기 지중T/L 건설사업 purpose 김포 북부지역 전력계통 보강 project_region_detail 경기도 김포시 project_period_raw 2026.04~2027.12 project_scale_raw 154KV XLPE 2,000,2C - 4.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_12a56d0ce6f49379
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_12a56d0ce6f49379
Sources EV-e9854fd908af564b222a8f33 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 901d248920ecb40af5b40fcae6593ddbd30179927a540d18059c7ba177fd04bd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233685|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9b8a663b795cbbf9
Sources EV-1e422fec3428c1e0b3c4eaae Evidence SHA-256 5004fe2ea4396df7c8eac19ce3ccaa62041bf22c63eb515420ef94e9e933bc59 행 SHA-256 7f75e6d413d1edf20dfb9fc2962781aeee1d24bfb9d9e0cb1baa2b0d9e5382a3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233685|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9b8a663b795cbbf9
Sources EV-1e422fec3428c1e0b3c4eaae Evidence SHA-256 5004fe2ea4396df7c8eac19ce3ccaa62041bf22c63eb515420ef94e9e933bc59 행 SHA-256 7f75e6d413d1edf20dfb9fc2962781aeee1d24bfb9d9e0cb1baa2b0d9e5382a3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_9b8a663b795cbbf9 stable_project_id kproj_12a56d0ce6f49379 source_key 202609|233685|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북통진분기 지중T/L 건설사업 project_name_detail 154kV 북통진분기 지중T/L 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV XLPE 2,000,2C - 4.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 □ 실시설계 중 attachment_count 0 source_detail_sha256 5004fe2ea4396df7c8eac19ce3ccaa62041bf22c63eb515420ef94e9e933bc59 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233685|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9b8a663b795cbbf9
Sources EV-1e422fec3428c1e0b3c4eaae Evidence SHA-256 5004fe2ea4396df7c8eac19ce3ccaa62041bf22c63eb515420ef94e9e933bc59 행 SHA-256 7f75e6d413d1edf20dfb9fc2962781aeee1d24bfb9d9e0cb1baa2b0d9e5382a3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_12a56d0ce6f49379 stable_project_key prjtDef:233685:ESB project_definition 233685 first_region_code ESB manual_source_format false project_name 154kV 북통진분기 지중T/L 건설사업 project_name_list 154kV 북통진분기 지중T/L 건설사업 purpose 김포 북부지역 전력계통 보강 project_region_detail 경기도 김포시 project_period_raw 2026.04~2027.12 project_scale_raw 154KV XLPE 2,000,2C - 4.0KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_12a56d0ce6f49379
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_12a56d0ce6f49379
Sources EV-e9854fd908af564b222a8f33 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 901d248920ecb40af5b40fcae6593ddbd30179927a540d18059c7ba177fd04bd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4ff488877d537a8c672c2483
Detailed source fields Original source field Published value or condition stable_project_id kproj_f0ed10c3315148ef stable_project_key prjtDef:231249:ESB project_definition 231249 first_region_code ESB manual_source_format false project_name 154kV 북평택S/S 건설사업 project_name_list 154kV 북평택변전소 건설사업 purpose 평택 고덕국제화 신도시 전력공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2010.12~2026.10 project_scale_raw 154KV M.TR (45/60MVA) X 2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_f0ed10c3315148ef
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f0ed10c3315148ef
Sources EV-4ff488877d537a8c672c2483 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 31c36857e233cfed3d3f1e4fb131279022226888d0e4b887fb0cfd7f3a2e3d0f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231249|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3f9b006ab71ed227
Sources EV-f2921f34a494bebecca1f266 Evidence SHA-256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73 행 SHA-256 0abd768598f6b6c0f79f31e87a2e5c42ff5711f02b4fc56b7699a8c6421e354a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2010-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231249|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3f9b006ab71ed227
Sources EV-f2921f34a494bebecca1f266 Evidence SHA-256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73 행 SHA-256 0abd768598f6b6c0f79f31e87a2e5c42ff5711f02b4fc56b7699a8c6421e354a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_3f9b006ab71ed227 stable_project_id kproj_f0ed10c3315148ef source_key 202609|231249|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 북평택변전소 건설사업 project_name_detail 154kV 북평택S/S 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project region Pyeongtaek, Gyeonggi Province 사업 규모 154KV M.TR (45/60MVA) X 2BANK 계획확정 제03차 장기송변전설비계획 반영(2013.08) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2020.05 참여 위원 수 : 15 경과지(부지) 확정: 2021.05 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ○ '13.08 : 제3차 장기 송변전설비계획 신규사업 반영 ○ '20.05 : 입지선정실무위원회 개최 ○ '21.05 : 입지확정위원회 개최 사업설계 설계용역: 기본설계: 2022.07 ~ 2022.08 실시설계: 2023.12 ~ 2025.03 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.06 공사 기간: 2025.06 ~ 2027.01 감독자: [redacted], 실적): 97, 66 future_plan_redacted □ 향후계획 ○ '27.10 : 변전소 기기가압 attachment_count 0 source_detail_sha256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231249|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3f9b006ab71ed227
Sources EV-f2921f34a494bebecca1f266 Evidence SHA-256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73 행 SHA-256 0abd768598f6b6c0f79f31e87a2e5c42ff5711f02b4fc56b7699a8c6421e354a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f0ed10c3315148ef stable_project_key prjtDef:231249:ESB project_definition 231249 first_region_code ESB manual_source_format false project_name 154kV 북평택S/S 건설사업 project_name_list 154kV 북평택변전소 건설사업 purpose 평택 고덕국제화 신도시 전력공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2010.12~2026.10 project_scale_raw 154KV M.TR (45/60MVA) X 2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_f0ed10c3315148ef
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f0ed10c3315148ef
Sources EV-4ff488877d537a8c672c2483 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 31c36857e233cfed3d3f1e4fb131279022226888d0e4b887fb0cfd7f3a2e3d0f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-1998ee368994e694fa248567
Detailed source fields Original source field Published value or condition stable_project_id kproj_fa0ad89de518b9ce stable_project_key prjtDef:233329:ESB project_definition 233329 first_region_code ESB manual_source_format false project_name 154kV 북평택분기 지중T/L 건설사업 project_name_list 154kV 북평택분기 지중T/L 건설사업 purpose 평택 고덕국제화지구 신규부하 전력공급 능력확보 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2025.01~2026.10 project_scale_raw 154KV XLPE 2,000, 4C×0.1KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_fa0ad89de518b9ce
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fa0ad89de518b9ce
Sources EV-1998ee368994e694fa248567 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3d84751e119d4644c5bb71538113b144e848f0a69125862c6951fd6a882da8ea Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233329|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7b87298b0e60cd17 stable_project_id kproj_fa0ad89de518b9ce source_key 202609|233329|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북평택분기 지중T/L 건설사업 project_name_detail 154kV 북평택분기 지중T/L 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project purpose 평택 고덕국제화지구 신규부하 전력공급 능력확보 Project region Pyeongtaek, Gyeonggi Province 사업 규모 154KV XLPE 2,000, 4C×0.1KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2025.04 ~ 2026.04 기본설계: 2025.02 ~ 2025.04 실시설계: 2025.04 ~ 2026.04 설계담당자: [redacted] '26.04 : 실시설계 의뢰 완료 및 진행 중 '26.06 : 공사 착공(예정) future_plan_redacted □ 향후계획 '26.04 : 실시설계 의뢰 완료 및 진행 중 '26.06 : 공사 착공(예정) attachment_count 0 source_detail_sha256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233329|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87298b0e60cd17
Sources EV-28504f6faba04199a365ad8e Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f 행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_fa0ad89de518b9ce stable_project_key prjtDef:233329:ESB project_definition 233329 first_region_code ESB manual_source_format false project_name 154kV 북평택분기 지중T/L 건설사업 project_name_list 154kV 북평택분기 지중T/L 건설사업 purpose 평택 고덕국제화지구 신규부하 전력공급 능력확보 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2025.01~2026.10 project_scale_raw 154KV XLPE 2,000, 4C×0.1KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_fa0ad89de518b9ce
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fa0ad89de518b9ce
Sources EV-1998ee368994e694fa248567 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3d84751e119d4644c5bb71538113b144e848f0a69125862c6951fd6a882da8ea Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-875a903ca730db3dcdf0e0ad
Detailed source fields Original source field Published value or condition stable_project_id kproj_e0080f30ab389317 stable_project_key prjtDef:231530:ESB project_definition 231530 first_region_code ESB manual_source_format false project_name 154kV 북현덕S/S 건설사업 project_name_list 154kV 북현덕S/S 건설사업 purpose 평택화양지구 도시개발사업 신규 부하 공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2021.07~2027.04 project_scale_raw 154/23KV 45/60MVA X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_e0080f30ab389317
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e0080f30ab389317
Sources EV-875a903ca730db3dcdf0e0ad Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 450ae15ec7b2fa1aefca407f9cb1e4df24c4c7d713ce4426af033c7e6590cdfa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231530|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87bad109bf32d9
Sources EV-9fafccc29b5aff6d6e3ec6ac Evidence SHA-256 7508af3e5579ff20fd5baaf912d8b83857881fed601a3a18f126d6a70af0d630 행 SHA-256 cf3c8a83cd4e6a6a72b0517e44da3055db041d73fb3e07e0e244325320bc704a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231530|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87bad109bf32d9
Sources EV-9fafccc29b5aff6d6e3ec6ac Evidence SHA-256 7508af3e5579ff20fd5baaf912d8b83857881fed601a3a18f126d6a70af0d630 행 SHA-256 cf3c8a83cd4e6a6a72b0517e44da3055db041d73fb3e07e0e244325320bc704a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7b87bad109bf32d9 stable_project_id kproj_e0080f30ab389317 source_key 202609|231530|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 북현덕S/S 건설사업 project_name_detail 154kV 북현덕S/S 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Pyeongtaek, Gyeonggi Province 사업 규모 154/23KV 45/60MVA X 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2022.03 참여 위원 수 : 15 경과지(부지) 확정: 2022.04 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 2024.01 ~ 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.01 공사 기간: 2025.01 ~ 2027.04 감독자: [redacted], 실적): 68, 69 [진행경과] □‘21. 7 : 제9차 장기송변전설비계획 신규 반영 □‘22. 4 : 입지확정위원회 결과 보고 □‘23. 9 : 기본설계 확정 보고 (→송변전건설단) □‘23.12 : 부지매매 계약 □‘25. 1 : 토건공사 착공 □‘25. 2 : 변전공사 착공 [향후계획] □‘27.04 : 변전소 가압 future_plan_redacted □ 향후계획 [진행경과] □‘21. 7 : 제9차 장기송변전설비계획 신규 반영 □‘22. 4 : 입지확정위원회 결과 보고 □‘23. 9 : 기본설계 확정 보고 (→송변전건설단) □‘23.12 : 부지매매 계약 □‘25. 1 : 토건공사 착공 □‘25. 2 : 변전공사 착공 [향후계획] □‘27.04 : 변전소 가압 attachment_count 0 source_detail_sha256 7508af3e5579ff20fd5baaf912d8b83857881fed601a3a18f126d6a70af0d630 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231530|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7b87bad109bf32d9
Sources EV-9fafccc29b5aff6d6e3ec6ac Evidence SHA-256 7508af3e5579ff20fd5baaf912d8b83857881fed601a3a18f126d6a70af0d630 행 SHA-256 cf3c8a83cd4e6a6a72b0517e44da3055db041d73fb3e07e0e244325320bc704a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e0080f30ab389317 stable_project_key prjtDef:231530:ESB project_definition 231530 first_region_code ESB manual_source_format false project_name 154kV 북현덕S/S 건설사업 project_name_list 154kV 북현덕S/S 건설사업 purpose 평택화양지구 도시개발사업 신규 부하 공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2021.07~2027.04 project_scale_raw 154/23KV 45/60MVA X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_e0080f30ab389317
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e0080f30ab389317
Sources EV-875a903ca730db3dcdf0e0ad Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 450ae15ec7b2fa1aefca407f9cb1e4df24c4c7d713ce4426af033c7e6590cdfa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-8c8e352b3ba5fcca9e86e329
Detailed source fields Original source field Published value or condition stable_project_id kproj_0222c38e7d6b890e stable_project_key prjtDef:234652:ESB project_definition 234652 first_region_code ESB manual_source_format false project_name 154kV 북현덕분기 전력구 건설사업 project_name_list 평택지역 전기공급시설 전력구공사(북현덕분기) purpose 화양지구, 현덕지구 신규부하 공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2023.11~2025.10 project_scale_raw 개착식 전력구 2,444M, 수직구 2개소, 세미실드 202M responsible_office_raw 경인건설본부/경기건설지사 equipment_type 전력구 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_0222c38e7d6b890e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0222c38e7d6b890e
Sources EV-8c8e352b3ba5fcca9e86e329 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e6f909ddd37d6c775ccddcaeeab8dfa36b1445a8bcddfc89c41c09a1e1857ddc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234652|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc1f60f5e457c78
Sources EV-484df9c09fd82045e0ec1020 Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234652|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc1f60f5e457c78
Sources EV-484df9c09fd82045e0ec1020 Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234652|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc1f60f5e457c78
Sources EV-484df9c09fd82045e0ec1020 Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234652|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc1f60f5e457c78
Sources EV-484df9c09fd82045e0ec1020 Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234652|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc1f60f5e457c78
Sources EV-484df9c09fd82045e0ec1020 Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ebc1f60f5e457c78 stable_project_id kproj_0222c38e7d6b890e source_key 202609|234652|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 평택지역 전기공급시설 전력구공사(북현덕분기) project_name_detail 154kV 북현덕분기 전력구 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Pyeongtaek, Gyeonggi Province 사업 규모 개착식 전력구 2,444M, 수직구 2개소, 세미실드 202M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.11 공사 기간: 2023.11 ~ 2026.08 감독자: [redacted], 실적): 100, 58 □ 진행경과 - '22. 05. 27 : 설계용역 시행 및 용역 계약의뢰 - '22. 08. 09 : 설계용역 착수 - '22. 11. 25 : 수직구 부지 협의(평택시 산림녹지과) - '23. 01. 18 : 수직구 부지 확정(화양지구) 및 경과지 선정 - '23. 02. 04~: 지반조사 시행 - '23. 04. : 기본설계 심의 - '23. 07. 04 : 공사시행지시(←송변전건설단) - '23. 07. 10 : 1차공사(택지) 실시설계 심의 - '23. 08. 21 : 2차공사(터널) 포승S/S 구내 분기 시공방안 확정 - '23. 08. 24 : 1차공사(택지) 설계 완료 - '23. 08. 31 : 1차공사(택지) 계약 의뢰 - '23. 11. 06 : 1차공사(택지) 공사 착공 - '23. 10. 19 : 2차공사(터널) 실시설계 심의 - '23. 12. 07 : 2차공사(터널) 설계 완료 - '23. 12. 08 : 2차공사(택지) 계약 의뢰 - '24. 02. 15 : 지하안전평가 조건부 동의(←서울지방국토청, 일부보완) - '24. 07 : 2차공사 계약 완료(동양건설산업) - '24. 09 : 1차공사 PC전력구 완료(잔여구간 120m) - '24. 10 : 1차공사 준공(10/30) - '25. 12 : 2차공사 발진 세미실드 굴진 및 도달 수직구 굴착 완료 - '26. 1 ~ : 2차 공사 수직구 구조물 공사 시공 진행中 □ 향후계획 - 표준공기대비 21개월 부족사업으로 전력구 절대공기 부족(가압목표 변경 협의) - 화양지구 초기부하 관련 실제 전력공급시기 모니터링 및 경기본부 지속 협의 future_plan_redacted □ 향후계획 □ 진행경과 - '22. 05. 27 : 설계용역 시행 및 용역 계약의뢰 - '22. 08. 09 : 설계용역 착수 - '22. 11. 25 : 수직구 부지 협의(평택시 산림녹지과) - '23. 01. 18 : 수직구 부지 확정(화양지구) 및 경과지 선정 - '23. 02. 04~: 지반조사 시행 - '23. 04. : 기본설계 심의 - '23. 07. 04 : 공사시행지시(←송변전건설단) - '23. 07. 10 : 1차공사(택지) 실시설계 심의 - '23. 08. 21 : 2차공사(터널) 포승S/S 구내 분기 시공방안 확정 - '23. 08. 24 : 1차공사(택지) 설계 완료 - '23. 08. 31 : 1차공사(택지) 계약 의뢰 - '23. 11. 06 : 1차공사(택지) 공사 착공 - '23. 10. 19 : 2차공사(터널) 실시설계 심의 - '23. 12. 07 : 2차공사(터널) 설계 완료 - '23. 12. 08 : 2차공사(택지) 계약 의뢰 - '24. 02. 15 : 지하안전평가 조건부 동의(←서울지방국토청, 일부보완) - '24. 07 : 2차공사 계약 완료(동양건설산업) - '24. 09 : 1차공사 PC전력구 완료(잔여구간 120m) - '24. 10 : 1차공사 준공(10/30) - '25. 12 : 2차공사 발진 세미실드 굴진 및 도달 수직구 굴착 완료 - '26. 1 ~ : 2차 공사 수직구 구조물 공사 시공 진행中 □ 향후계획 - 표준공기대비 21개월 부족사업으로 전력구 절대공기 부족(가압목표 변경 협의) - 화양지구 초기부하 관련 실제 전력공급시기 모니터링 및 경기본부 지속 협의 attachment_count 0 source_detail_sha256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234652|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ebc1f60f5e457c78
Sources EV-484df9c09fd82045e0ec1020 Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172 행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_0222c38e7d6b890e stable_project_key prjtDef:234652:ESB project_definition 234652 first_region_code ESB manual_source_format false project_name 154kV 북현덕분기 전력구 건설사업 project_name_list 평택지역 전기공급시설 전력구공사(북현덕분기) purpose 화양지구, 현덕지구 신규부하 공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2023.11~2025.10 project_scale_raw 개착식 전력구 2,444M, 수직구 2개소, 세미실드 202M responsible_office_raw 경인건설본부/경기건설지사 equipment_type 전력구 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_0222c38e7d6b890e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0222c38e7d6b890e
Sources EV-8c8e352b3ba5fcca9e86e329 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e6f909ddd37d6c775ccddcaeeab8dfa36b1445a8bcddfc89c41c09a1e1857ddc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-517ff66b36b07b4733ab6463
Detailed source fields Original source field Published value or condition stable_project_id kproj_27c9e022e76bba93 stable_project_key prjtDef:233669:ESB project_definition 233669 first_region_code ESB manual_source_format false project_name 154kV 북현덕분기 지중T/L project_name_list 154kV 북현덕분기 지중T/L 건설공사 purpose 전력계통 보강 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2024.12~2025.12 project_scale_raw 154KV 2500㎟×4C-2.7KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_27c9e022e76bba93
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_27c9e022e76bba93
Sources EV-517ff66b36b07b4733ab6463 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2603b229e541e5d0eed572290498c1f1c960a4060346a6c9e85632b303536c79 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c325baefaffe15cc
Sources EV-7ed3d1162a0f4aad2eeeaff8 Evidence SHA-256 b3b79a61c263dc7d19dbc64b42df83d4511d2b5cb1cb6b83fbddbf8c74ca4127 행 SHA-256 949907c5871c401fe478ca58cf2fcbef62eb28b937172692f0fe8f95bd44c368 Observations for this power asset History for this project Previous Next