POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 23items · current page 1–23 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-0d5b48d5be66f4c120334e7b
Detailed source fields Original source field Published value or condition stable_project_id kproj_da9dc91d8bdaf6cf stable_project_key prjtDef:231493:ESB project_definition 231493 first_region_code ESB manual_source_format false project_name 154kV 북통진S/S 건설사업 project_name_list 154kV 북통진S/S 건설사업 purpose 김포북부지역 신규전력 공급 및 인근변전소 부하분담 project_region_detail 경기도 김포시 project_period_raw 2019.10~2027.12 project_scale_raw 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_da9dc91d8bdaf6cf
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_da9dc91d8bdaf6cf
Sources EV-0d5b48d5be66f4c120334e7b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 aed108cb1c3f17f4c3a6f5786226407dcea3eeafc6a4d4d6b08f5489633a8103 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09-29 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2022-11-17 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09-02 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2025-10-29 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231493|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_837f11204255fe90 stable_project_id kproj_da9dc91d8bdaf6cf source_key 202609|231493|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북통진S/S 건설사업 project_name_detail 154kV 북통진S/S 건설사업 region_summary_raw 경기도 김포시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields Project purpose 김포북부지역 신규전력 공급 및 인근변전소 부하분담 사업 규모 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT 입지선정 전력입지영향평가 용역 착수: 2020.08 입지선정위원회 구성시기: 2021.08 참여 위원 수 : 10 지장유무 조회: 2021.05~2021.06 경과지(부지) 확정: 환경/재해 영향평가 환경영향평가: 2021.10 ~ 2021.10 재해영향평가: 주민의견 수렴 지자체 공고 열람: 2021.09 ~ 2021.10 설명회·공청회: 2021.09 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] □ ‘19.12 : 김포지역 154kV 변전소 및 관련사업 신설 검토결과 알림(←계통계획실) □ ‘20.08 : 입지선정위한 전력영향평가 용역 착수 □ ‘21.02∼’21.07 : 입지선정위원회의 1차 ∼ 6차회의 시행 (후보지 선정완료) □ ‘21.09.02 : 입지확정 □ ‘21.09.29 : 주민설명회 시행 □ ‘22.11.17 : 실시계획 승인 □ ‘25.10.29 : 실시계획 변경 승인 □ 향후계획 ○ `26. 06월 : 변전소 토건/변전공사 착공 ○ `27. 12월 : 기기가압 future_plan_redacted □ 향후계획 □ ‘19.12 : 김포지역 154kV 변전소 및 관련사업 신설 검토결과 알림(←계통계획실) □ ‘20.08 : 입지선정위한 전력영향평가 용역 착수 □ ‘21.02∼’21.07 : 입지선정위원회의 1차 ∼ 6차회의 시행 (후보지 선정완료) □ ‘21.09.02 : 입지확정 □ ‘21.09.29 : 주민설명회 시행 □ ‘22.11.17 : 실시계획 승인 □ ‘25.10.29 : 실시계획 변경 승인 □ 향후계획 ○ `26. 06월 : 변전소 토건/변전공사 착공 ○ `27. 12월 : 기기가압 attachment_count 0 source_detail_sha256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231493|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_837f11204255fe90
Sources EV-3cf8c60359d7904192b32cd5 Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb 행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_da9dc91d8bdaf6cf stable_project_key prjtDef:231493:ESB project_definition 231493 first_region_code ESB manual_source_format false project_name 154kV 북통진S/S 건설사업 project_name_list 154kV 북통진S/S 건설사업 purpose 김포북부지역 신규전력 공급 및 인근변전소 부하분담 project_region_detail 경기도 김포시 project_period_raw 2019.10~2027.12 project_scale_raw 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_da9dc91d8bdaf6cf
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_da9dc91d8bdaf6cf
Sources EV-0d5b48d5be66f4c120334e7b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 aed108cb1c3f17f4c3a6f5786226407dcea3eeafc6a4d4d6b08f5489633a8103 Observations for this power asset History for this project