Power assets and projects · KOR · kepco_planned

154kV 북통진S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-0d5b48d5be66f4c120334e7b
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_da9dc91d8bdaf6cf
stable_project_keyprjtDef:231493:ESB
project_definition231493
first_region_codeESB
manual_source_formatfalse
project_name154kV 북통진S/S 건설사업
project_name_list154kV 북통진S/S 건설사업
purpose김포북부지역 신규전력 공급 및 인근변전소 부하분담
project_region_detail경기도 김포시
project_period_raw2019.10~2027.12
project_scale_raw154KV MTR 60MVA×2BANK, 170KV GIS×5CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_837f11204255fe90
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_da9dc91d8bdaf6cf

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_da9dc91d8bdaf6cf

Sources EV-0d5b48d5be66f4c120334e7b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 aed108cb1c3f17f4c3a6f5786226407dcea3eeafc6a4d4d6b08f5489633a8103
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09-29
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2019-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-11-17
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09-02
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2025-10-29
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source schedule candidates · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231493|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source snapshots by date · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_837f11204255fe90
stable_project_idkproj_da9dc91d8bdaf6cf
source_key202609|231493|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북통진S/S 건설사업
project_name_detail154kV 북통진S/S 건설사업
region_summary_raw경기도 김포시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 김포북부지역 신규전력 공급 및 인근변전소 부하분담
Project region
  • 경기도 김포시
Project period
  • 2019.10~2027.12
사업 규모
  • 154KV MTR 60MVA×2BANK, 170KV GIS×5CCT
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2020.08 입지선정위원회 구성시기: 2021.08 참여 위원 수 : 10 지장유무 조회: 2021.05~2021.06 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 2021.10 ~ 2021.10 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2021.09 ~ 2021.10 설명회·공청회: 2021.09 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
□ ‘19.12 : 김포지역 154kV 변전소 및 관련사업 신설 검토결과 알림(←계통계획실) □ ‘20.08 : 입지선정위한 전력영향평가 용역 착수 □ ‘21.02∼’21.07 : 입지선정위원회의 1차 ∼ 6차회의 시행 (후보지 선정완료) □ ‘21.09.02 : 입지확정 □ ‘21.09.29 : 주민설명회 시행 □ ‘22.11.17 : 실시계획 승인 □ ‘25.10.29 : 실시계획 변경 승인 □ 향후계획 ○ `26. 06월 : 변전소 토건/변전공사 착공 ○ `27. 12월 : 기기가압
future_plan_redacted□ 향후계획 □ ‘19.12 : 김포지역 154kV 변전소 및 관련사업 신설 검토결과 알림(←계통계획실) □ ‘20.08 : 입지선정위한 전력영향평가 용역 착수 □ ‘21.02∼’21.07 : 입지선정위원회의 1차 ∼ 6차회의 시행 (후보지 선정완료) □ ‘21.09.02 : 입지확정 □ ‘21.09.29 : 주민설명회 시행 □ ‘22.11.17 : 실시계획 승인 □ ‘25.10.29 : 실시계획 변경 승인 □ 향후계획 ○ `26. 06월 : 변전소 토건/변전공사 착공 ○ `27. 12월 : 기기가압
attachment_count0
source_detail_sha256b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231493|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_837f11204255fe90

Sources EV-3cf8c60359d7904192b32cd5
Evidence SHA-256 b2f12f6b600f9fc860a10626c70edd2619c2335d649ac7041e83b394a405b8bb
행 SHA-256 418db7d27e42cdea4086313afb6fe1ec0754325a86f7fe28f8842824abe2554f
Source snapshots by date · KOR · kepco_planned

154kV 북통진S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_da9dc91d8bdaf6cf
stable_project_keyprjtDef:231493:ESB
project_definition231493
first_region_codeESB
manual_source_formatfalse
project_name154kV 북통진S/S 건설사업
project_name_list154kV 북통진S/S 건설사업
purpose김포북부지역 신규전력 공급 및 인근변전소 부하분담
project_region_detail경기도 김포시
project_period_raw2019.10~2027.12
project_scale_raw154KV MTR 60MVA×2BANK, 170KV GIS×5CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_837f11204255fe90
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_da9dc91d8bdaf6cf

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_da9dc91d8bdaf6cf

Sources EV-0d5b48d5be66f4c120334e7b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 aed108cb1c3f17f4c3a6f5786226407dcea3eeafc6a4d4d6b08f5489633a8103

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel