Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 북통진분기 전력구 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-62e63b72d0e5228a2a81cfaa
Sources EV-cb102361c72a865ca6aad36f Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590 행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552dSource snapshots by date · KOR · kepco_planned
154kV 북통진분기 전력구 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_d748ddfd6920155b
stable_project_id
kproj_682aa90d16c90105
source_key
202609|234645|ESB
basic_ym
202609
source_stage_raw
사업승인-공사착수전
project_name_list
김포북부지역 전기공급시설 전력구공사
project_name_detail
154kV 북통진분기 전력구 건설사업
region_summary_raw
경기도 김포시등 1 지역
equipment_type_raw
전력구
headquarters_raw
경인건설본부
office_raw
남서울인천건설지사
section_fields
Project purpose
김포 북부지역 공급능력 확보 및 부하분담
Project region
경기도 김포시
Project period
2022.03~2027.12
사업 규모
총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M)
담당 사업소
경인건설본부/남서울인천건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.05
Sources EV-cb102361c72a865ca6aad36f Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590 행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552dSource snapshots by date · KOR · kepco_planned