POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북통진분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-62e63b72d0e5228a2a81cfaa
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_682aa90d16c90105
stable_project_keyprjtDef:234645:ESB
project_definition234645
first_region_codeESB
manual_source_formatfalse
project_name154kV 북통진분기 전력구 건설사업
project_name_list김포북부지역 전기공급시설 전력구공사
purpose김포 북부지역 공급능력 확보 및 부하분담
project_region_detail경기도 김포시
project_period_raw2022.03~2027.12
project_scale_raw총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d748ddfd6920155b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_682aa90d16c90105

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_682aa90d16c90105

Sources EV-62e63b72d0e5228a2a81cfaa
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 483b26404b761bf62a26edf78d46ea54222aaa41931282ac3807f402b56932c9
Source schedule candidates · KOR · kepco_planned

154kV 북통진분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234645|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d748ddfd6920155b

Sources EV-cb102361c72a865ca6aad36f
Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590
행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552d
Source schedule candidates · KOR · kepco_planned

154kV 북통진분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234645|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d748ddfd6920155b

Sources EV-cb102361c72a865ca6aad36f
Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590
행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552d
Source snapshots by date · KOR · kepco_planned

154kV 북통진분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d748ddfd6920155b
stable_project_idkproj_682aa90d16c90105
source_key202609|234645|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list김포북부지역 전기공급시설 전력구공사
project_name_detail154kV 북통진분기 전력구 건설사업
region_summary_raw경기도 김포시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 김포 북부지역 공급능력 확보 및 부하분담
Project region
  • 경기도 김포시
Project period
  • 2022.03~2027.12
사업 규모
  • 총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.05
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2022.07 ~ 2025.03 기본설계: 2022.07 ~ 2024.05 실시설계: 2024.06 ~ 2025.05 설계담당자: [redacted]
○ '24.05 : 기본설계심의 ○ '24.07 : 공사시행계획(안) 확정 ○ '24.08 : 2차 지반조사 시행 ○ '24.09 : GPR 탐사 시행 ○ '24.10 : 실시설계 심의 시행 ○ '25.05 : 설계완료 및 계약의뢰 ○ '25.09 : 계약완료 ○ '25.10 : 공사착공 ○ '25.12 : 공사중지 ○ '26.04 : 공사재개 및 관로공사 착수
future_plan_redacted□ 향후계획 ○ '24.05 : 기본설계심의 ○ '24.07 : 공사시행계획(안) 확정 ○ '24.08 : 2차 지반조사 시행 ○ '24.09 : GPR 탐사 시행 ○ '24.10 : 실시설계 심의 시행 ○ '25.05 : 설계완료 및 계약의뢰 ○ '25.09 : 계약완료 ○ '25.10 : 공사착공 ○ '25.12 : 공사중지 ○ '26.04 : 공사재개 및 관로공사 착수
attachment_count0
source_detail_sha256feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234645|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d748ddfd6920155b

Sources EV-cb102361c72a865ca6aad36f
Evidence SHA-256 feaf9f0b592b32ad9c00dfa0a7b2088abf5d6d70d11a51d0360460ec939bd590
행 SHA-256 f5ea7e3e89e3b4b80c3207644aaf894c286d43e6af3d9580d701d672f6bf552d
Source snapshots by date · KOR · kepco_planned

154kV 북통진분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_682aa90d16c90105
stable_project_keyprjtDef:234645:ESB
project_definition234645
first_region_codeESB
manual_source_formatfalse
project_name154kV 북통진분기 전력구 건설사업
project_name_list김포북부지역 전기공급시설 전력구공사
purpose김포 북부지역 공급능력 확보 및 부하분담
project_region_detail경기도 김포시
project_period_raw2022.03~2027.12
project_scale_raw총연장 4,011M(개착식 관로 3,759M, 지향성압입 252M)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d748ddfd6920155b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_682aa90d16c90105

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_682aa90d16c90105

Sources EV-62e63b72d0e5228a2a81cfaa
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 483b26404b761bf62a26edf78d46ea54222aaa41931282ac3807f402b56932c9

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel