POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1998ee368994e694fa248567
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fa0ad89de518b9ce
stable_project_keyprjtDef:233329:ESB
project_definition233329
first_region_codeESB
manual_source_formatfalse
project_name154kV 북평택분기 지중T/L 건설사업
project_name_list154kV 북평택분기 지중T/L 건설사업
purpose평택 고덕국제화지구 신규부하 전력공급 능력확보
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.01~2026.10
project_scale_raw154KV XLPE 2,000, 4C×0.1KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7b87298b0e60cd17
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_fa0ad89de518b9ce

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fa0ad89de518b9ce

Sources EV-1998ee368994e694fa248567
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3d84751e119d4644c5bb71538113b144e848f0a69125862c6951fd6a882da8ea
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source schedule candidates · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233329|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source snapshots by date · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7b87298b0e60cd17
stable_project_idkproj_fa0ad89de518b9ce
source_key202609|233329|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북평택분기 지중T/L 건설사업
project_name_detail154kV 북평택분기 지중T/L 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 평택 고덕국제화지구 신규부하 전력공급 능력확보
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2025.01~2026.10
사업 규모
  • 154KV XLPE 2,000, 4C×0.1KM
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2025.04 ~ 2026.04 기본설계: 2025.02 ~ 2025.04 실시설계: 2025.04 ~ 2026.04 설계담당자: [redacted]
'26.04 : 실시설계 의뢰 완료 및 진행 중 '26.06 : 공사 착공(예정)
future_plan_redacted□ 향후계획 '26.04 : 실시설계 의뢰 완료 및 진행 중 '26.06 : 공사 착공(예정)
attachment_count0
source_detail_sha256f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233329|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7b87298b0e60cd17

Sources EV-28504f6faba04199a365ad8e
Evidence SHA-256 f57a5e7a02eda01c3749687affa927fcb098d374ea7d124b31d4dfd83ee16f0f
행 SHA-256 bbaf8c2f08a7bcdee60551f015d97c5e6d65cc02e54376ca9273fcf9c0877924
Source snapshots by date · KOR · kepco_planned

154kV 북평택분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fa0ad89de518b9ce
stable_project_keyprjtDef:233329:ESB
project_definition233329
first_region_codeESB
manual_source_formatfalse
project_name154kV 북평택분기 지중T/L 건설사업
project_name_list154kV 북평택분기 지중T/L 건설사업
purpose평택 고덕국제화지구 신규부하 전력공급 능력확보
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.01~2026.10
project_scale_raw154KV XLPE 2,000, 4C×0.1KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7b87298b0e60cd17
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_fa0ad89de518b9ce

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fa0ad89de518b9ce

Sources EV-1998ee368994e694fa248567
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3d84751e119d4644c5bb71538113b144e848f0a69125862c6951fd6a882da8ea

AI-DC KOREA MEMBER