POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 8items · current page 1–8 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8c8e352b3ba5fcca9e86e329
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0222c38e7d6b890e
stable_project_keyprjtDef:234652:ESB
project_definition234652
first_region_codeESB
manual_source_formatfalse
project_name154kV 북현덕분기 전력구 건설사업
project_name_list평택지역 전기공급시설 전력구공사(북현덕분기)
purpose화양지구, 현덕지구 신규부하 공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2023.11~2025.10
project_scale_raw개착식 전력구 2,444M, 수직구 2개소, 세미실드 202M
responsible_office_raw경인건설본부/경기건설지사
equipment_type전력구
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ebc1f60f5e457c78
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0222c38e7d6b890e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0222c38e7d6b890e

Sources EV-8c8e352b3ba5fcca9e86e329
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e6f909ddd37d6c775ccddcaeeab8dfa36b1445a8bcddfc89c41c09a1e1857ddc
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234652|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ebc1f60f5e457c78

Sources EV-484df9c09fd82045e0ec1020
Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234652|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ebc1f60f5e457c78

Sources EV-484df9c09fd82045e0ec1020
Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-11
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234652|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ebc1f60f5e457c78

Sources EV-484df9c09fd82045e0ec1020
Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234652|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ebc1f60f5e457c78

Sources EV-484df9c09fd82045e0ec1020
Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b
Source schedule candidates · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2023-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234652|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ebc1f60f5e457c78

Sources EV-484df9c09fd82045e0ec1020
Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b
Source snapshots by date · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ebc1f60f5e457c78
stable_project_idkproj_0222c38e7d6b890e
source_key202609|234652|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list평택지역 전기공급시설 전력구공사(북현덕분기)
project_name_detail154kV 북현덕분기 전력구 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 화양지구, 현덕지구 신규부하 공급
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2023.11~2025.10
사업 규모
  • 개착식 전력구 2,444M, 수직구 2개소, 세미실드 202M
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.11 공사 기간: 2023.11 ~ 2026.08 감독자: [redacted], 실적): 100, 58
□ 진행경과 - '22. 05. 27 : 설계용역 시행 및 용역 계약의뢰 - '22. 08. 09 : 설계용역 착수 - '22. 11. 25 : 수직구 부지 협의(평택시 산림녹지과) - '23. 01. 18 : 수직구 부지 확정(화양지구) 및 경과지 선정 - '23. 02. 04~: 지반조사 시행 - '23. 04. : 기본설계 심의 - '23. 07. 04 : 공사시행지시(←송변전건설단) - '23. 07. 10 : 1차공사(택지) 실시설계 심의 - '23. 08. 21 : 2차공사(터널) 포승S/S 구내 분기 시공방안 확정 - '23. 08. 24 : 1차공사(택지) 설계 완료 - '23. 08. 31 : 1차공사(택지) 계약 의뢰 - '23. 11. 06 : 1차공사(택지) 공사 착공 - '23. 10. 19 : 2차공사(터널) 실시설계 심의 - '23. 12. 07 : 2차공사(터널) 설계 완료 - '23. 12. 08 : 2차공사(택지) 계약 의뢰 - '24. 02. 15 : 지하안전평가 조건부 동의(←서울지방국토청, 일부보완) - '24. 07 : 2차공사 계약 완료(동양건설산업) - '24. 09 : 1차공사 PC전력구 완료(잔여구간 120m) - '24. 10 : 1차공사 준공(10/30) - '25. 12 : 2차공사 발진 세미실드 굴진 및 도달 수직구 굴착 완료 - '26. 1 ~ : 2차 공사 수직구 구조물 공사 시공 진행中 □ 향후계획 - 표준공기대비 21개월 부족사업으로 전력구 절대공기 부족(가압목표 변경 협의) - 화양지구 초기부하 관련 실제 전력공급시기 모니터링 및 경기본부 지속 협의
future_plan_redacted□ 향후계획 □ 진행경과 - '22. 05. 27 : 설계용역 시행 및 용역 계약의뢰 - '22. 08. 09 : 설계용역 착수 - '22. 11. 25 : 수직구 부지 협의(평택시 산림녹지과) - '23. 01. 18 : 수직구 부지 확정(화양지구) 및 경과지 선정 - '23. 02. 04~: 지반조사 시행 - '23. 04. : 기본설계 심의 - '23. 07. 04 : 공사시행지시(←송변전건설단) - '23. 07. 10 : 1차공사(택지) 실시설계 심의 - '23. 08. 21 : 2차공사(터널) 포승S/S 구내 분기 시공방안 확정 - '23. 08. 24 : 1차공사(택지) 설계 완료 - '23. 08. 31 : 1차공사(택지) 계약 의뢰 - '23. 11. 06 : 1차공사(택지) 공사 착공 - '23. 10. 19 : 2차공사(터널) 실시설계 심의 - '23. 12. 07 : 2차공사(터널) 설계 완료 - '23. 12. 08 : 2차공사(택지) 계약 의뢰 - '24. 02. 15 : 지하안전평가 조건부 동의(←서울지방국토청, 일부보완) - '24. 07 : 2차공사 계약 완료(동양건설산업) - '24. 09 : 1차공사 PC전력구 완료(잔여구간 120m) - '24. 10 : 1차공사 준공(10/30) - '25. 12 : 2차공사 발진 세미실드 굴진 및 도달 수직구 굴착 완료 - '26. 1 ~ : 2차 공사 수직구 구조물 공사 시공 진행中 □ 향후계획 - 표준공기대비 21개월 부족사업으로 전력구 절대공기 부족(가압목표 변경 협의) - 화양지구 초기부하 관련 실제 전력공급시기 모니터링 및 경기본부 지속 협의
attachment_count0
source_detail_sha256c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234652|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ebc1f60f5e457c78

Sources EV-484df9c09fd82045e0ec1020
Evidence SHA-256 c4dcae75cabb91386ba75e5561005875819ad1658f7b558c622a9b421bc8e172
행 SHA-256 9e16a6c27645868898df1c7249d7f076e346b578e431983cf7f00f6dec7bcf0b
Source snapshots by date · KOR · kepco_planned

154kV 북현덕분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0222c38e7d6b890e
stable_project_keyprjtDef:234652:ESB
project_definition234652
first_region_codeESB
manual_source_formatfalse
project_name154kV 북현덕분기 전력구 건설사업
project_name_list평택지역 전기공급시설 전력구공사(북현덕분기)
purpose화양지구, 현덕지구 신규부하 공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2023.11~2025.10
project_scale_raw개착식 전력구 2,444M, 수직구 2개소, 세미실드 202M
responsible_office_raw경인건설본부/경기건설지사
equipment_type전력구
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ebc1f60f5e457c78
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0222c38e7d6b890e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0222c38e7d6b890e

Sources EV-8c8e352b3ba5fcca9e86e329
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e6f909ddd37d6c775ccddcaeeab8dfa36b1445a8bcddfc89c41c09a1e1857ddc

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel