Power assets and projects · KOR · kepco_planned

154kV 북평택S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4ff488877d537a8c672c2483
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f0ed10c3315148ef
stable_project_keyprjtDef:231249:ESB
project_definition231249
first_region_codeESB
manual_source_formatfalse
project_name154kV 북평택S/S 건설사업
project_name_list154kV 북평택변전소 건설사업
purpose평택 고덕국제화 신도시 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2010.12~2026.10
project_scale_raw154KV M.TR (45/60MVA) X 2BANK
responsible_office_raw경인건설본부/직할
equipment_type변전
headquarters경인건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3f9b006ab71ed227
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_f0ed10c3315148ef

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f0ed10c3315148ef

Sources EV-4ff488877d537a8c672c2483
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 31c36857e233cfed3d3f1e4fb131279022226888d0e4b887fb0cfd7f3a2e3d0f
Source schedule candidates · KOR · kepco_planned

154kV 북평택S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231249|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3f9b006ab71ed227

Sources EV-f2921f34a494bebecca1f266
Evidence SHA-256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73
행 SHA-256 0abd768598f6b6c0f79f31e87a2e5c42ff5711f02b4fc56b7699a8c6421e354a
Source schedule candidates · KOR · kepco_planned

154kV 북평택S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2010-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231249|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3f9b006ab71ed227

Sources EV-f2921f34a494bebecca1f266
Evidence SHA-256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73
행 SHA-256 0abd768598f6b6c0f79f31e87a2e5c42ff5711f02b4fc56b7699a8c6421e354a
Source snapshots by date · KOR · kepco_planned

154kV 북평택S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3f9b006ab71ed227
stable_project_idkproj_f0ed10c3315148ef
source_key202609|231249|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북평택변전소 건설사업
project_name_detail154kV 북평택S/S 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 평택 고덕국제화 신도시 전력공급
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2010.12~2026.10
사업 규모
  • 154KV M.TR (45/60MVA) X 2BANK
담당 사업소
  • 경인건설본부/직할
계획확정
  • 제03차 장기송변전설비계획 반영(2013.08)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2020.05 참여 위원 수 : 15 경과지(부지) 확정: 2021.05
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ○ '13.08 : 제3차 장기 송변전설비계획 신규사업 반영 ○ '20.05 : 입지선정실무위원회 개최 ○ '21.05 : 입지확정위원회 개최
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.07 ~ 2022.08 실시설계: 2023.12 ~ 2025.03 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.06 공사 기간: 2025.06 ~ 2027.01 감독자: [redacted], 실적): 97, 66
○ '27.10 : 변전소 기기가압
future_plan_redacted□ 향후계획 ○ '27.10 : 변전소 기기가압
attachment_count0
source_detail_sha2564ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231249|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3f9b006ab71ed227

Sources EV-f2921f34a494bebecca1f266
Evidence SHA-256 4ee7b15143e18564e19b11354b8e2c0617f12661baca14cb6742ee68264a7f73
행 SHA-256 0abd768598f6b6c0f79f31e87a2e5c42ff5711f02b4fc56b7699a8c6421e354a
Source snapshots by date · KOR · kepco_planned

154kV 북평택S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f0ed10c3315148ef
stable_project_keyprjtDef:231249:ESB
project_definition231249
first_region_codeESB
manual_source_formatfalse
project_name154kV 북평택S/S 건설사업
project_name_list154kV 북평택변전소 건설사업
purpose평택 고덕국제화 신도시 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2010.12~2026.10
project_scale_raw154KV M.TR (45/60MVA) X 2BANK
responsible_office_raw경인건설본부/직할
equipment_type변전
headquarters경인건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3f9b006ab71ed227
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_f0ed10c3315148ef

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f0ed10c3315148ef

Sources EV-4ff488877d537a8c672c2483
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 31c36857e233cfed3d3f1e4fb131279022226888d0e4b887fb0cfd7f3a2e3d0f

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel