This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 56items · current page 1–56 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-e3abb88591b9e11d024a9275
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9f9106a9612397ba
stable_project_keyprjtDef:232295:ESB
project_definition232295
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕분기T/L 건설사업
project_name_list154kV 북창녕분기 송전선로 건설사업
purpose창녕 대합일반산업단지 개발 신규부하공급
project_region_detail경상남도 창녕군
project_period_raw2024.03~2028.05
project_scale_rawACSR 410㎟×B×4C×0.5KM, 철탑3기
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_2bdce838bf6ace49
  • ksnap_52c3eec5d34507f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_9f9106a9612397ba

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9f9106a9612397ba

Sources EV-e3abb88591b9e11d024a9275
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e70df9685aa5c0be94a73d650c68321fe95a3a9705a6ebacee93361224e114a5
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesettlement_completion
date2028-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2009-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2009-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2009-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesettlement_completion
date2028-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source snapshots by date · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_2bdce838bf6ace49
stable_project_idkproj_9f9106a9612397ba
source_key202609|232295|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북창녕분기 송전선로 건설사업
project_name_detail154kV 북창녕분기T/L 건설사업
region_summary_raw경상남도 창녕군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 창녕 대합일반산업단지 개발 신규부하공급
Project region
  • 경상남도 창녕군
Project period
  • 2024.03~2028.05
사업 규모
  • ACSR 410㎟×B×4C×0.5KM, 철탑3기
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2009.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산
future_plan_redacted□ 향후계획 [추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산
attachment_count0
source_detail_sha256908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232295|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source snapshots by date · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_52c3eec5d34507f2
stable_project_idkproj_9f9106a9612397ba
source_key202610|232295|ESB
basic_ym202610
source_stage_raw공사착수-사업완료전
project_name_list154kV 북창녕분기 송전선로 건설사업
project_name_detail154kV 북창녕분기T/L 건설사업
region_summary_raw경상남도 창녕군등 1 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 창녕 대합일반산업단지 개발 신규부하공급
Project region
  • 경상남도 창녕군
Project period
  • 2024.03~2028.05
사업 규모
  • ACSR 410㎟×B×4C×0.5KM, 철탑3기
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제04차 장기송변전설비계획 반영(2009.03)
입지선정
  • 전력입지영향평가 용역 착수: 2009.07 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • 해당없음.
전원개발사업 실시계획 승인
  • 2026.06
사업설계
  • 설계용역: 기본설계: 2026.03 ~ 2026.03 실시설계: 2026.06 ~ 2026.06 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 공사 기간: 감독자: [redacted], 실적): 86, 68
[추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산
future_plan_redacted□ 향후계획 [추진실적] ㅇ 21.09 : 제9차 장기송변전설비계획 준공목표 변경('23.10→'24.10) ㅇ 22.08 : 24년 이후 설비계획 송배전협업회의 시행(8/23, 경남본부) ㅇ 23.05 : 제10차 장기송변전설비계획 준공목표 변경('24.10→'25.10) ㅇ 24.05 : 적정성 검토에 따른 준공목표 변경('25.10→'26.12) ㅇ 25.01 : 경과지 설계용역 시행 ㅇ 25.02 : 적정성 검토에 따른 준공목표 변경('26.12→'27.05) ㅇ 25.11 : 자재운반방법 선정용역 착수 ㅇ 25.12 : 소규모 환경영향평가 용역 착수 ㅇ 26.04 : 기본설계 확정 및 시행 ㅇ 26.06 : 실시설계 확정 및 시행 [향후계획] ㅇ 27.05 : 송전선로 가압 ㅇ 28.05 : 송전선로 준공 정산
attachment_count0
source_detail_sha25663b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202610
source_record_id202610|232295|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source snapshots by date · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9f9106a9612397ba
stable_project_keyprjtDef:232295:ESB
project_definition232295
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕분기T/L 건설사업
project_name_list154kV 북창녕분기 송전선로 건설사업
purpose창녕 대합일반산업단지 개발 신규부하공급
project_region_detail경상남도 창녕군
project_period_raw2024.03~2028.05
project_scale_rawACSR 410㎟×B×4C×0.5KM, 철탑3기
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_2bdce838bf6ace49
  • ksnap_52c3eec5d34507f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_9f9106a9612397ba

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9f9106a9612397ba

Sources EV-e3abb88591b9e11d024a9275
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e70df9685aa5c0be94a73d650c68321fe95a3a9705a6ebacee93361224e114a5

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel