POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 2401–2500 · Source records, not unique facilities.

Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source schedule candidates · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231445|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source snapshots by date · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a03e648aaebce622
stable_project_idkproj_0acb585e22b6a2a9
source_key202609|231445|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북아산S/S 건설사업
project_name_detail154kV 북아산S/S 건설사업
region_summary_raw충청남도 아산시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 천안, 아산 북부지역 신규수요 증가에 따른 공급능력 확충
Project region
  • Asan City, South Chungcheong Province
Project period
  • 2018.06~2025.04
사업 규모
  • 154KV M.TR 2BANK
담당 사업소
  • 중부건설본부/직할
계획확정
  • 제08차 장기송변전설비계획 반영(2018.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2022.11 ~ 2023.10 기본설계: 2022.08 ~ 2022.11 실시설계: 2022.11 ~ 2023.10 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.01 공사 기간: 2024.01 ~ 2025.04 감독자: [redacted], 실적): 100, 77
□ '18.06 : 제8차 장기 송변전설비계획 신규 사업 반영 □ `20.05 : 준공목표 변경(`23.10→`25.10) □ `20.06 : 입지확정위원회 시행 □ `21.03 : 송전선로 인출입 지중화 심의 시행(송전건설부) □ `23.02 : 준공목표 변경(’25.10 →‘25.04) □ `24.04 : 변전공사 착공 □ `25.02 : 공사 중지 □ `25.09 : 공사 재착공 □ `26.05 : 사용전검사 및 가압 □ `26.06 : 준공
future_plan_redacted□ 향후계획 □ '18.06 : 제8차 장기 송변전설비계획 신규 사업 반영 □ `20.05 : 준공목표 변경(`23.10→`25.10) □ `20.06 : 입지확정위원회 시행 □ `21.03 : 송전선로 인출입 지중화 심의 시행(송전건설부) □ `23.02 : 준공목표 변경(’25.10 →‘25.04) □ `24.04 : 변전공사 착공 □ `25.02 : 공사 중지 □ `25.09 : 공사 재착공 □ `26.05 : 사용전검사 및 가압 □ `26.06 : 준공
attachment_count0
source_detail_sha256bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231445|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a03e648aaebce622

Sources EV-fb9b9bbb7db7e73b1d84b16c
Evidence SHA-256 bf9010076ff204c3750f01916c35f525a16e87d921d686ccca965708333adb6e
행 SHA-256 3c6844db9483ab4eb31d193c3854c4a0c3316b15afa2a59c88a109bec2455181
Source snapshots by date · KOR · kepco_planned

154kV 북아산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0acb585e22b6a2a9
stable_project_keyprjtDef:231445:ESB
project_definition231445
first_region_codeESB
manual_source_formatfalse
project_name154kV 북아산S/S 건설사업
project_name_list154kV 북아산S/S 건설사업
purpose천안, 아산 북부지역 신규수요 증가에 따른 공급능력 확충
project_region_detailAsan City, South Chungcheong Province
project_period_raw2018.06~2025.04
project_scale_raw154KV M.TR 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a03e648aaebce622
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0acb585e22b6a2a9

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0acb585e22b6a2a9

Sources EV-33bd84074f8750e4019da10e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 cc65cb71e4ab7b7dc0c273d4d6545e233567ba0b7b8a00be3d970378c9181251
Power assets and projects · KOR · kepco_planned

154kV 북아산분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-894d61e8dbf2e8662ba51647
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_728464a4523e7b92
stable_project_keyprjtDef:233648:ESB
project_definition233648
first_region_codeESB
manual_source_formatfalse
project_name154kV 북아산분기 지중T/L 건설사업
project_name_list154kV 북아산분기 지중T/L 건설사업
purpose천안, 아산 북부지역 신규부하 공급
project_region_detailAsan City, South Chungcheong Province
project_period_raw2024.12~2026.10
project_scale_raw154KV XLPE 2500㎟ 4C 0.34KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_25eda72fc59b57ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_728464a4523e7b92

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_728464a4523e7b92

Sources EV-894d61e8dbf2e8662ba51647
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d149fef310130adbe16168c769638a0a8ce2fbf3d44bee6f61b886ce7d714295
Source schedule candidates · KOR · kepco_planned

154kV 북아산분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233648|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_25eda72fc59b57ad

Sources EV-a798110644d9f14351e29846
Evidence SHA-256 5049fc4f9e89941ef4d11e23f9ba3839607addf4db14cbbb933f50fb51e5eea3
행 SHA-256 068c7968a394d8843d9cff08fc374dcb76ad7662e284a9e461fac7b30b0c432b
Source schedule candidates · KOR · kepco_planned

154kV 북아산분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233648|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_25eda72fc59b57ad

Sources EV-a798110644d9f14351e29846
Evidence SHA-256 5049fc4f9e89941ef4d11e23f9ba3839607addf4db14cbbb933f50fb51e5eea3
행 SHA-256 068c7968a394d8843d9cff08fc374dcb76ad7662e284a9e461fac7b30b0c432b
Source snapshots by date · KOR · kepco_planned

154kV 북아산분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_25eda72fc59b57ad
stable_project_idkproj_728464a4523e7b92
source_key202609|233648|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북아산분기 지중T/L 건설사업
project_name_detail154kV 북아산분기 지중T/L 건설사업
region_summary_raw충청남도 아산시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 천안, 아산 북부지역 신규부하 공급
Project region
  • Asan City, South Chungcheong Province
Project period
  • 2024.12~2026.10
사업 규모
  • 154KV XLPE 2500㎟ 4C 0.34KM
담당 사업소
  • 중부건설본부/직할
계획확정
  • 제08차 장기송변전설비계획 반영(2018.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.03 ~ 2024.04 실시설계: 2024.04 ~ 2024.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.01 공사 기간: 2025.02 ~ 2026.10 감독자: [redacted], 실적): 100, 88
ㅇ18.06 : 8차 송변전설비계획 신규사업 반영 ㅇ25.01 : 공사 착공 ㅇ25.02 : 공사 중지 ㅇ26.10 : 공사 준공
future_plan_redacted□ 향후계획 ㅇ18.06 : 8차 송변전설비계획 신규사업 반영 ㅇ25.01 : 공사 착공 ㅇ25.02 : 공사 중지 ㅇ26.10 : 공사 준공
attachment_count0
source_detail_sha2565049fc4f9e89941ef4d11e23f9ba3839607addf4db14cbbb933f50fb51e5eea3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233648|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_25eda72fc59b57ad

Sources EV-a798110644d9f14351e29846
Evidence SHA-256 5049fc4f9e89941ef4d11e23f9ba3839607addf4db14cbbb933f50fb51e5eea3
행 SHA-256 068c7968a394d8843d9cff08fc374dcb76ad7662e284a9e461fac7b30b0c432b
Source snapshots by date · KOR · kepco_planned

154kV 북아산분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_728464a4523e7b92
stable_project_keyprjtDef:233648:ESB
project_definition233648
first_region_codeESB
manual_source_formatfalse
project_name154kV 북아산분기 지중T/L 건설사업
project_name_list154kV 북아산분기 지중T/L 건설사업
purpose천안, 아산 북부지역 신규부하 공급
project_region_detailAsan City, South Chungcheong Province
project_period_raw2024.12~2026.10
project_scale_raw154KV XLPE 2500㎟ 4C 0.34KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_25eda72fc59b57ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_728464a4523e7b92

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_728464a4523e7b92

Sources EV-894d61e8dbf2e8662ba51647
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d149fef310130adbe16168c769638a0a8ce2fbf3d44bee6f61b886ce7d714295
Power assets and projects · KOR · kepco_planned

154kV 북임실S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8cd373acd6f7afa0465e316d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8410f98f2c62c25
stable_project_keyprjtDef:231473:ESB
project_definition231473
first_region_codeESB
manual_source_formatfalse
project_name154kV 북임실S/S 건설사업
project_name_list154kV 북임실S/S 건설사업
purpose신재생 연계
project_region_detail전북특별자치도 임실군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR(60MVA) X 3BANK, 170KV GIS X 11CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a61ce0cdee1de015
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_f8410f98f2c62c25

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8410f98f2c62c25

Sources EV-8cd373acd6f7afa0465e316d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 00c5b61327f2399a104511a3f67fcefcb72105d3069e2cac0479b8a7b99f0700
Source schedule candidates · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231473|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a61ce0cdee1de015

Sources EV-aa67a44b06985f40ec7b7875
Evidence SHA-256 44e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
행 SHA-256 8c79c83fe6d3797f0c1897f8eaa483d066c528615de9e72dcf163de7a21e274f
Source schedule candidates · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231473|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a61ce0cdee1de015

Sources EV-aa67a44b06985f40ec7b7875
Evidence SHA-256 44e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
행 SHA-256 8c79c83fe6d3797f0c1897f8eaa483d066c528615de9e72dcf163de7a21e274f
Source snapshots by date · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a61ce0cdee1de015
stable_project_idkproj_f8410f98f2c62c25
source_key202609|231473|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북임실S/S 건설사업
project_name_detail154kV 북임실S/S 건설사업
region_summary_raw전북특별자치도 임실군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 신재생 연계
Project region
  • 전북특별자치도 임실군
Project period
  • 2018.06~2026.10
사업 규모
  • 154KV M.TR(60MVA) X 3BANK, 170KV GIS X 11CCT
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제08차 장기송변전설비계획 반영(2018.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □`18.06 : 제8차 장기송변전설비계획 신규반영 □`19.11 : 임실군 변전소 부지 추천(오염토정화업체 부지) □`21.07 : 변전소 부지 법률상 지장유무 조회 □`21.10 : 입지확정위원회 시행 □`21.12 : 전원개발사업 실시계획 승인 신청(송전선로) □`22.01 : 변전 건설사업 기본설계(안) 구성 및 시행 □`22.02 : 상생협의체 특별지원 협의서 체결(협의금액 : 6.5억원) □`22.03 : 용지매수 계약 체결(수천리 1041 번지 일원) □`22.04 : 변전 주자재 구매요청 □`23.01 : 건축허가 완료 □`23.08 : 전기사업용 전기설비 공사계획 신고 및 공사 착수 □`24.09 : 북임실S/S 토건공사 계약해지 추진 및 변전공사 중지 □`25.04 : 154kV 북임실S/S 토건공사(2차) 착수 / 변전 및 소방공사 재개 □`25.11 : 170kV GIS 반입 및 설치 □`25.12 : 25.8kV EGIS 반입 및 설치 □`26.01 : 170kV GIS 개체시험 완료 □`26.02 : 154kV M.Tr 설치 / 25.8kV EGIS 개체시험 □`26.04 : 변전소 준공시험 □`26.06 : 사용전검사(1~3차)
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.02 ~ 2022.02 실시설계: 2022.02 ~ 2022.07 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.06 공사 기간: 2023.06 ~ 2026.09 감독자: [redacted], 실적): 99, 77
line □'26.09 : (휴전승인시)사용전검사(4차) 및 변전소 상업운전 시
future_plan_redactedline □ 향후계획 □'26.09 : (휴전승인시)사용전검사(4차) 및 변전소 상업운전 시
attachment_count0
source_detail_sha25644e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231473|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a61ce0cdee1de015

Sources EV-aa67a44b06985f40ec7b7875
Evidence SHA-256 44e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
행 SHA-256 8c79c83fe6d3797f0c1897f8eaa483d066c528615de9e72dcf163de7a21e274f
Source snapshots by date · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8410f98f2c62c25
stable_project_keyprjtDef:231473:ESB
project_definition231473
first_region_codeESB
manual_source_formatfalse
project_name154kV 북임실S/S 건설사업
project_name_list154kV 북임실S/S 건설사업
purpose신재생 연계
project_region_detail전북특별자치도 임실군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR(60MVA) X 3BANK, 170KV GIS X 11CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a61ce0cdee1de015
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_f8410f98f2c62c25

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8410f98f2c62c25

Sources EV-8cd373acd6f7afa0465e316d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 00c5b61327f2399a104511a3f67fcefcb72105d3069e2cac0479b8a7b99f0700
Power assets and projects · KOR · kepco_planned

154kV 북장안S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-eabd3599294663cba1ef155d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4b15b418ff32f6b2
stable_project_keyprjtDef:231497:ESB
project_definition231497
first_region_codeESB
manual_source_formatfalse
project_name154kV 북장안S/S 건설사업
project_name_list154kV 북장안S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c10da3a040c8c43d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_4b15b418ff32f6b2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4b15b418ff32f6b2

Sources EV-eabd3599294663cba1ef155d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9e7ed062faed1b9cf91ee70812b1d5f3f2b39907cdc1f49e52b5349b1cce51b
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source snapshots by date · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c10da3a040c8c43d
stable_project_idkproj_4b15b418ff32f6b2
source_key202609|231497|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북장안S/S 건설사업
project_name_detail154kV 북장안S/S 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2018.06~2026.10
사업 규모
  • 154KV M.TR 60MVA × 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2022.04
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.06 ~ 2022.08 실시설계: 2023.12 ~ 2024.07 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.10 공사 기간: 2024.10 ~ 2026.10 감독자: [redacted], 실적): 100, 77
○ 진행경과 - '18.06 : 제8차 장기송·변전설비계획 신규반영 - '22.04 : 경과지 확정[경기도 평택시 장안동 79-1일원(브레인시티 內)] - '22.08 : 기본설계 완료 - '23.10 : 용지매수 완료 - '24.07 : 실시설계 완료 - '24.09 : 토건공사 착공 - '24.10 : 변전공사 착공 ○ 향후계획 - '26.11 : 변전소 최초가압
future_plan_redacted□ 향후계획 ○ 진행경과 - '18.06 : 제8차 장기송·변전설비계획 신규반영 - '22.04 : 경과지 확정[경기도 평택시 장안동 79-1일원(브레인시티 內)] - '22.08 : 기본설계 완료 - '23.10 : 용지매수 완료 - '24.07 : 실시설계 완료 - '24.09 : 토건공사 착공 - '24.10 : 변전공사 착공 ○ 향후계획 - '26.11 : 변전소 최초가압
attachment_count0
source_detail_sha256574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231497|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source snapshots by date · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4b15b418ff32f6b2
stable_project_keyprjtDef:231497:ESB
project_definition231497
first_region_codeESB
manual_source_formatfalse
project_name154kV 북장안S/S 건설사업
project_name_list154kV 북장안S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c10da3a040c8c43d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_4b15b418ff32f6b2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4b15b418ff32f6b2

Sources EV-eabd3599294663cba1ef155d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9e7ed062faed1b9cf91ee70812b1d5f3f2b39907cdc1f49e52b5349b1cce51b
Power assets and projects · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-07a434edaa09ebb36bf31fe6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bd3c6c8b31d59ce3
stable_project_keyprjtDef:233667:ESB
project_definition233667
first_region_codeESB
manual_source_formatfalse
project_name154kV 북장안분기 지중T/L 건설사업
project_name_list154kV 북장안분기 지중T/L 건설공사
purpose전력계통 보강
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2026.01~2026.07
project_scale_raw154KV XLPE 2,500㎟×4C-0.4㎞
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7034a201f0e2df0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_bd3c6c8b31d59ce3

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bd3c6c8b31d59ce3

Sources EV-07a434edaa09ebb36bf31fe6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 13a6fb7fd14ba4bf19bbffaf2ee5b7be7b259a29c2276116e80a176d817eaa32
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source schedule candidates · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233667|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source snapshots by date · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b7034a201f0e2df0
stable_project_idkproj_bd3c6c8b31d59ce3
source_key202609|233667|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북장안분기 지중T/L 건설공사
project_name_detail154kV 북장안분기 지중T/L 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 전력계통 보강
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2026.01~2026.07
사업 규모
  • 154KV XLPE 2,500㎟×4C-0.4㎞
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.05 공사 기간: 2025.05 ~ 2025.12 감독자: [redacted], 실적): 100, 13
□ '24.11 : 기본설계 완료 □ '25.10 : 실시설계 완료 □ '26.01 : 감리용역 착수 및 공사 착공 □ '26.01 : 공사 중지 □ '26.08 : 공사 재개 □ '26.09 : 공사중지 □ '26.11 : #1T/L 가압 □ '26.12 : #2T/L 가압
future_plan_redacted□ 향후계획 □ '24.11 : 기본설계 완료 □ '25.10 : 실시설계 완료 □ '26.01 : 감리용역 착수 및 공사 착공 □ '26.01 : 공사 중지 □ '26.08 : 공사 재개 □ '26.09 : 공사중지 □ '26.11 : #1T/L 가압 □ '26.12 : #2T/L 가압
attachment_count0
source_detail_sha256c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233667|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7034a201f0e2df0

Sources EV-00729d47956e754142972059
Evidence SHA-256 c8b7f026644830781461495c72ac803f4a019ae3e91bd017e1738b8f33020970
행 SHA-256 1750a60bb2a4d430c5b1c2a7a547a70ddb6314228baa82a7015e696636346392
Source snapshots by date · KOR · kepco_planned

154kV 북장안분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bd3c6c8b31d59ce3
stable_project_keyprjtDef:233667:ESB
project_definition233667
first_region_codeESB
manual_source_formatfalse
project_name154kV 북장안분기 지중T/L 건설사업
project_name_list154kV 북장안분기 지중T/L 건설공사
purpose전력계통 보강
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2026.01~2026.07
project_scale_raw154KV XLPE 2,500㎟×4C-0.4㎞
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7034a201f0e2df0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_bd3c6c8b31d59ce3

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bd3c6c8b31d59ce3

Sources EV-07a434edaa09ebb36bf31fe6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 13a6fb7fd14ba4bf19bbffaf2ee5b7be7b259a29c2276116e80a176d817eaa32
Power assets and projects · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-416374da34e692411f42da19
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2a05ed9654e35ed2
stable_project_keyprjtDef:231255:ESB
project_definition231255
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕S/S 건설사업
project_name_list154kV 북창녕S/S 건설사업
purpose창녕지역의 부하 급증 대비 공급능력 확보
project_region_detail경상남도 창녕군
project_period_raw2007.12~2027.05
project_scale_rawM.TR(154/23KV 15/20MVA×1상×3대) × 2BANK
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1a7585ecd26642ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_2a05ed9654e35ed2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2a05ed9654e35ed2

Sources EV-416374da34e692411f42da19
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 70b7d63bd391eb171e3cde62f92e9a61c227cd2a89d9023deb8d6b4f5fb3032a
Source schedule candidates · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231255|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1a7585ecd26642ad

Sources EV-53b00ab99bb6c08697fad8c5
Evidence SHA-256 cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
행 SHA-256 be530148de17f304d5a5568035cbc6927fca08598926ecfc6cd246d82d1aff10
Source schedule candidates · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2007-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231255|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1a7585ecd26642ad

Sources EV-53b00ab99bb6c08697fad8c5
Evidence SHA-256 cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
행 SHA-256 be530148de17f304d5a5568035cbc6927fca08598926ecfc6cd246d82d1aff10
Source snapshots by date · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1a7585ecd26642ad
stable_project_idkproj_2a05ed9654e35ed2
source_key202609|231255|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북창녕S/S 건설사업
project_name_detail154kV 북창녕S/S 건설사업
region_summary_raw경상남도 창녕군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 창녕지역의 부하 급증 대비 공급능력 확보
Project region
  • 경상남도 창녕군
Project period
  • 2007.12~2027.05
사업 규모
  • M.TR(154/23KV 15/20MVA×1상×3대) × 2BANK
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2025.03 ~ 2025.05 실시설계: 2025.06 ~ 2025.11 설계담당자: [redacted]
□ ‘26.03 : 변전공사 착공 □ ‘27.05 : 변전소 최초가압
future_plan_redacted□ 향후계획 □ ‘26.03 : 변전공사 착공 □ ‘27.05 : 변전소 최초가압
attachment_count0
source_detail_sha256cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231255|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1a7585ecd26642ad

Sources EV-53b00ab99bb6c08697fad8c5
Evidence SHA-256 cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
행 SHA-256 be530148de17f304d5a5568035cbc6927fca08598926ecfc6cd246d82d1aff10
Source snapshots by date · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2a05ed9654e35ed2
stable_project_keyprjtDef:231255:ESB
project_definition231255
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕S/S 건설사업
project_name_list154kV 북창녕S/S 건설사업
purpose창녕지역의 부하 급증 대비 공급능력 확보
project_region_detail경상남도 창녕군
project_period_raw2007.12~2027.05
project_scale_rawM.TR(154/23KV 15/20MVA×1상×3대) × 2BANK
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1a7585ecd26642ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_2a05ed9654e35ed2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2a05ed9654e35ed2

Sources EV-416374da34e692411f42da19
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 70b7d63bd391eb171e3cde62f92e9a61c227cd2a89d9023deb8d6b4f5fb3032a
Power assets and projects · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-e3abb88591b9e11d024a9275
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9f9106a9612397ba
stable_project_keyprjtDef:232295:ESB
project_definition232295
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕분기T/L 건설사업
project_name_list154kV 북창녕분기 송전선로 건설사업
purpose창녕 대합일반산업단지 개발 신규부하공급
project_region_detail경상남도 창녕군
project_period_raw2024.03~2028.05
project_scale_rawACSR 410㎟×B×4C×0.5KM, 철탑3기
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_2bdce838bf6ace49
  • ksnap_52c3eec5d34507f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_9f9106a9612397ba

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9f9106a9612397ba

Sources EV-e3abb88591b9e11d024a9275
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e70df9685aa5c0be94a73d650c68321fe95a3a9705a6ebacee93361224e114a5
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesettlement_completion
date2028-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2009-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52c3eec5d34507f2

Sources EV-4d971c86e8d0a304e0376da2
Evidence SHA-256 63b7660ea9d7c23c83bec9d278fd456622caa079c70ece110db649ab553f9a25
행 SHA-256 ff41daac582689bda1ba24d8a48e9973fe01030f0fa6b0f17a02da5f63110efb
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2009-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6
Source schedule candidates · KOR · kepco_planned

154kV 북창녕분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232295|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2bdce838bf6ace49

Sources EV-3ce4072c8ce601aedccbdd69
Evidence SHA-256 908146cc1616b8aae6fccf29762cd9ac044b15c2ac733ef0a4a9eb6bb93ee41c
행 SHA-256 5f35d94a7b909fb1db77fc638d34172641fa3029128807e924fbefefbbc750f6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel