POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북임실S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8cd373acd6f7afa0465e316d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8410f98f2c62c25
stable_project_keyprjtDef:231473:ESB
project_definition231473
first_region_codeESB
manual_source_formatfalse
project_name154kV 북임실S/S 건설사업
project_name_list154kV 북임실S/S 건설사업
purpose신재생 연계
project_region_detail전북특별자치도 임실군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR(60MVA) X 3BANK, 170KV GIS X 11CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a61ce0cdee1de015
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_f8410f98f2c62c25

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8410f98f2c62c25

Sources EV-8cd373acd6f7afa0465e316d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 00c5b61327f2399a104511a3f67fcefcb72105d3069e2cac0479b8a7b99f0700
Source schedule candidates · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231473|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a61ce0cdee1de015

Sources EV-aa67a44b06985f40ec7b7875
Evidence SHA-256 44e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
행 SHA-256 8c79c83fe6d3797f0c1897f8eaa483d066c528615de9e72dcf163de7a21e274f
Source schedule candidates · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231473|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a61ce0cdee1de015

Sources EV-aa67a44b06985f40ec7b7875
Evidence SHA-256 44e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
행 SHA-256 8c79c83fe6d3797f0c1897f8eaa483d066c528615de9e72dcf163de7a21e274f
Source snapshots by date · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a61ce0cdee1de015
stable_project_idkproj_f8410f98f2c62c25
source_key202609|231473|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북임실S/S 건설사업
project_name_detail154kV 북임실S/S 건설사업
region_summary_raw전북특별자치도 임실군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 신재생 연계
Project region
  • 전북특별자치도 임실군
Project period
  • 2018.06~2026.10
사업 규모
  • 154KV M.TR(60MVA) X 3BANK, 170KV GIS X 11CCT
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제08차 장기송변전설비계획 반영(2018.06)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □`18.06 : 제8차 장기송변전설비계획 신규반영 □`19.11 : 임실군 변전소 부지 추천(오염토정화업체 부지) □`21.07 : 변전소 부지 법률상 지장유무 조회 □`21.10 : 입지확정위원회 시행 □`21.12 : 전원개발사업 실시계획 승인 신청(송전선로) □`22.01 : 변전 건설사업 기본설계(안) 구성 및 시행 □`22.02 : 상생협의체 특별지원 협의서 체결(협의금액 : 6.5억원) □`22.03 : 용지매수 계약 체결(수천리 1041 번지 일원) □`22.04 : 변전 주자재 구매요청 □`23.01 : 건축허가 완료 □`23.08 : 전기사업용 전기설비 공사계획 신고 및 공사 착수 □`24.09 : 북임실S/S 토건공사 계약해지 추진 및 변전공사 중지 □`25.04 : 154kV 북임실S/S 토건공사(2차) 착수 / 변전 및 소방공사 재개 □`25.11 : 170kV GIS 반입 및 설치 □`25.12 : 25.8kV EGIS 반입 및 설치 □`26.01 : 170kV GIS 개체시험 완료 □`26.02 : 154kV M.Tr 설치 / 25.8kV EGIS 개체시험 □`26.04 : 변전소 준공시험 □`26.06 : 사용전검사(1~3차)
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.02 ~ 2022.02 실시설계: 2022.02 ~ 2022.07 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.06 공사 기간: 2023.06 ~ 2026.09 감독자: [redacted], 실적): 99, 77
line □'26.09 : (휴전승인시)사용전검사(4차) 및 변전소 상업운전 시
future_plan_redactedline □ 향후계획 □'26.09 : (휴전승인시)사용전검사(4차) 및 변전소 상업운전 시
attachment_count0
source_detail_sha25644e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231473|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a61ce0cdee1de015

Sources EV-aa67a44b06985f40ec7b7875
Evidence SHA-256 44e5bedf997d0fe9940bd01281f2226c41fec2d006fac9c80ff17e5d185e8cc5
행 SHA-256 8c79c83fe6d3797f0c1897f8eaa483d066c528615de9e72dcf163de7a21e274f
Source snapshots by date · KOR · kepco_planned

154kV 북임실S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8410f98f2c62c25
stable_project_keyprjtDef:231473:ESB
project_definition231473
first_region_codeESB
manual_source_formatfalse
project_name154kV 북임실S/S 건설사업
project_name_list154kV 북임실S/S 건설사업
purpose신재생 연계
project_region_detail전북특별자치도 임실군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR(60MVA) X 3BANK, 170KV GIS X 11CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a61ce0cdee1de015
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_f8410f98f2c62c25

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8410f98f2c62c25

Sources EV-8cd373acd6f7afa0465e316d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 00c5b61327f2399a104511a3f67fcefcb72105d3069e2cac0479b8a7b99f0700

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel