POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 21items · current page 1–21 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북장안S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-eabd3599294663cba1ef155d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4b15b418ff32f6b2
stable_project_keyprjtDef:231497:ESB
project_definition231497
first_region_codeESB
manual_source_formatfalse
project_name154kV 북장안S/S 건설사업
project_name_list154kV 북장안S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c10da3a040c8c43d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_4b15b418ff32f6b2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4b15b418ff32f6b2

Sources EV-eabd3599294663cba1ef155d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9e7ed062faed1b9cf91ee70812b1d5f3f2b39907cdc1f49e52b5349b1cce51b
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source schedule candidates · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231497|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source snapshots by date · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c10da3a040c8c43d
stable_project_idkproj_4b15b418ff32f6b2
source_key202609|231497|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 북장안S/S 건설사업
project_name_detail154kV 북장안S/S 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2018.06~2026.10
사업 규모
  • 154KV M.TR 60MVA × 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2022.04
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.06 ~ 2022.08 실시설계: 2023.12 ~ 2024.07 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.10 공사 기간: 2024.10 ~ 2026.10 감독자: [redacted], 실적): 100, 77
○ 진행경과 - '18.06 : 제8차 장기송·변전설비계획 신규반영 - '22.04 : 경과지 확정[경기도 평택시 장안동 79-1일원(브레인시티 內)] - '22.08 : 기본설계 완료 - '23.10 : 용지매수 완료 - '24.07 : 실시설계 완료 - '24.09 : 토건공사 착공 - '24.10 : 변전공사 착공 ○ 향후계획 - '26.11 : 변전소 최초가압
future_plan_redacted□ 향후계획 ○ 진행경과 - '18.06 : 제8차 장기송·변전설비계획 신규반영 - '22.04 : 경과지 확정[경기도 평택시 장안동 79-1일원(브레인시티 內)] - '22.08 : 기본설계 완료 - '23.10 : 용지매수 완료 - '24.07 : 실시설계 완료 - '24.09 : 토건공사 착공 - '24.10 : 변전공사 착공 ○ 향후계획 - '26.11 : 변전소 최초가압
attachment_count0
source_detail_sha256574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231497|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c10da3a040c8c43d

Sources EV-746496114b2ea8a0fa0845fe
Evidence SHA-256 574275950c47ae08019ba897ae720b414768577c22dd57689b8e57912f5c2868
행 SHA-256 520503d075769248e061a16b2d9616df845596a48a0fd108310c423b339537c0
Source snapshots by date · KOR · kepco_planned

154kV 북장안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4b15b418ff32f6b2
stable_project_keyprjtDef:231497:ESB
project_definition231497
first_region_codeESB
manual_source_formatfalse
project_name154kV 북장안S/S 건설사업
project_name_list154kV 북장안S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c10da3a040c8c43d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_4b15b418ff32f6b2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4b15b418ff32f6b2

Sources EV-eabd3599294663cba1ef155d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9e7ed062faed1b9cf91ee70812b1d5f3f2b39907cdc1f49e52b5349b1cce51b

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel