POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-416374da34e692411f42da19
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2a05ed9654e35ed2
stable_project_keyprjtDef:231255:ESB
project_definition231255
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕S/S 건설사업
project_name_list154kV 북창녕S/S 건설사업
purpose창녕지역의 부하 급증 대비 공급능력 확보
project_region_detail경상남도 창녕군
project_period_raw2007.12~2027.05
project_scale_rawM.TR(154/23KV 15/20MVA×1상×3대) × 2BANK
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1a7585ecd26642ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_2a05ed9654e35ed2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2a05ed9654e35ed2

Sources EV-416374da34e692411f42da19
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 70b7d63bd391eb171e3cde62f92e9a61c227cd2a89d9023deb8d6b4f5fb3032a
Source schedule candidates · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231255|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1a7585ecd26642ad

Sources EV-53b00ab99bb6c08697fad8c5
Evidence SHA-256 cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
행 SHA-256 be530148de17f304d5a5568035cbc6927fca08598926ecfc6cd246d82d1aff10
Source schedule candidates · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2007-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231255|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1a7585ecd26642ad

Sources EV-53b00ab99bb6c08697fad8c5
Evidence SHA-256 cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
행 SHA-256 be530148de17f304d5a5568035cbc6927fca08598926ecfc6cd246d82d1aff10
Source snapshots by date · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1a7585ecd26642ad
stable_project_idkproj_2a05ed9654e35ed2
source_key202609|231255|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북창녕S/S 건설사업
project_name_detail154kV 북창녕S/S 건설사업
region_summary_raw경상남도 창녕군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 창녕지역의 부하 급증 대비 공급능력 확보
Project region
  • 경상남도 창녕군
Project period
  • 2007.12~2027.05
사업 규모
  • M.TR(154/23KV 15/20MVA×1상×3대) × 2BANK
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2025.03 ~ 2025.05 실시설계: 2025.06 ~ 2025.11 설계담당자: [redacted]
□ ‘26.03 : 변전공사 착공 □ ‘27.05 : 변전소 최초가압
future_plan_redacted□ 향후계획 □ ‘26.03 : 변전공사 착공 □ ‘27.05 : 변전소 최초가압
attachment_count0
source_detail_sha256cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231255|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1a7585ecd26642ad

Sources EV-53b00ab99bb6c08697fad8c5
Evidence SHA-256 cfa3d15071e0f9c5f96c921b2993d68c43d709eee19acd82b2433e2a8bf04d27
행 SHA-256 be530148de17f304d5a5568035cbc6927fca08598926ecfc6cd246d82d1aff10
Source snapshots by date · KOR · kepco_planned

154kV 북창녕S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2a05ed9654e35ed2
stable_project_keyprjtDef:231255:ESB
project_definition231255
first_region_codeESB
manual_source_formatfalse
project_name154kV 북창녕S/S 건설사업
project_name_list154kV 북창녕S/S 건설사업
purpose창녕지역의 부하 급증 대비 공급능력 확보
project_region_detail경상남도 창녕군
project_period_raw2007.12~2027.05
project_scale_rawM.TR(154/23KV 15/20MVA×1상×3대) × 2BANK
responsible_office_raw남부건설본부/직할
equipment_type변전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1a7585ecd26642ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_2a05ed9654e35ed2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2a05ed9654e35ed2

Sources EV-416374da34e692411f42da19
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 70b7d63bd391eb171e3cde62f92e9a61c227cd2a89d9023deb8d6b4f5fb3032a

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel