POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 2801–2900 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-f1a90c4c725bd1b15b3c4278
Detailed source fields Original source field Published value or condition stable_project_id kproj_7e00f2ed8c4a1afb stable_project_key prjtDef:231113:ESB project_definition 231113 first_region_code ESB manual_source_format false project_name 154kV 삼각지S/S 건설사업 project_name_list 154kV 삼각지변전소 건설사업 purpose 용산구일원의 안정적인 전력공급 project_region_detail 서울특별시 용산구 project_period_raw 1999.02~2039.06 project_scale_raw 154KV M.TR 60 MVA X 2 BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7e00f2ed8c4a1afb
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7e00f2ed8c4a1afb
Sources EV-f1a90c4c725bd1b15b3c4278 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 99615f4e6bb4ec59094daff4e2563f999fe2f5eaf4bf63456bf8541153b90864 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2008-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2039-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2010-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2030-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2008-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2039-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_29409b6c9b9aa86d stable_project_id kproj_7e00f2ed8c4a1afb source_key 202609|231113|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 삼각지변전소 건설사업 project_name_detail 154kV 삼각지S/S 건설사업 region_summary_raw 서울특별시 용산구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR 60 MVA X 2 BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ ’08.06 : 용산구청 건축허가(옥내변전소) □ ’08.11 : 변전소 형태 변경(지하변전소) 및 본사 재무처에서 잔여 부지 활용방안 검토 진행 결정 □ ’10.12 : 용산지구단위계획구역 ‘삼각맨션특별계획구역’ 편입 □ ’16.08 : 서울시, 도시환경정비 예정구역으로 지정 □ ’19.09 : 삼각지부지 활용T/F → 단독개발 결정(재무처 등 6개 부서) □ ’23.02 : 준공 목표 변경(’26.04 → ’30.06) □ ’24. 5 : 삼각맨션 일대 도시정비형 재개발사업 정비구역 지정 및 결정(안) 공람공고(용산구청) □ ’25. 4 : 용산구청 주관 주민설명회 개최 future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231113|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7e00f2ed8c4a1afb stable_project_key prjtDef:231113:ESB project_definition 231113 first_region_code ESB manual_source_format false project_name 154kV 삼각지S/S 건설사업 project_name_list 154kV 삼각지변전소 건설사업 purpose 용산구일원의 안정적인 전력공급 project_region_detail 서울특별시 용산구 project_period_raw 1999.02~2039.06 project_scale_raw 154KV M.TR 60 MVA X 2 BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7e00f2ed8c4a1afb
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7e00f2ed8c4a1afb
Sources EV-f1a90c4c725bd1b15b3c4278 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 99615f4e6bb4ec59094daff4e2563f999fe2f5eaf4bf63456bf8541153b90864 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-76c162a22b59ecde57504a6a
Detailed source fields Original source field Published value or condition stable_project_id kproj_951af14192b76690 stable_project_key prjtDef:233474:ESB project_definition 233474 first_region_code ESB manual_source_format false project_name 154kV 삼호개폐소-화원(증)지중T/L 건설사업 project_name_list 154kV 삼호-화원 지중T/L 복도체화 건설사업 purpose 삼호-화원T/L 과부하 해소 project_region_detail 전남광주통합특별시 영암군,해남군 project_period_raw 2021.07~2024.10 project_scale_raw 154KV XLPE 2000㎟, 2C(C)-6.8KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_951af14192b76690
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_951af14192b76690
Sources EV-76c162a22b59ecde57504a6a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2a68e9057d1b11a541f51b9e8ba5487278c4ec7b17faf80f4cef64f9e25e5385 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233474|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec33c7acb4aa38ea
Sources EV-7f28e96431bc3fe5764494eb Evidence SHA-256 b4932262edf87c66f9505f6d1ea054ef2f1f0d1102fb1b1effbfcf53d967c7fc 행 SHA-256 cfaf35f4ee2ed903f39b7b94dae4fbbaeee8fbd92730dda24324504a56790658 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2024-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233474|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec33c7acb4aa38ea
Sources EV-7f28e96431bc3fe5764494eb Evidence SHA-256 b4932262edf87c66f9505f6d1ea054ef2f1f0d1102fb1b1effbfcf53d967c7fc 행 SHA-256 cfaf35f4ee2ed903f39b7b94dae4fbbaeee8fbd92730dda24324504a56790658 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ec33c7acb4aa38ea stable_project_id kproj_951af14192b76690 source_key 202609|233474|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 삼호-화원 지중T/L 복도체화 건설사업 project_name_detail 154kV 삼호개폐소-화원(증)지중T/L 건설사업 region_summary_raw 전남광주통합특별시 영암군등 2 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 154KV XLPE 2000㎟, 2C(C)-6.8KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 2021.11 ~ 2022.02 설계담당자: [redacted] 건설공사 개요 공사 착공: 2022.04 공사 기간: 2022.04 ~ 2024.10 감독자: [redacted], 실적): 100, 84 future_plan_redacted □ 향후계획 ○ 24.10 : 가압 attachment_count 0 source_detail_sha256 b4932262edf87c66f9505f6d1ea054ef2f1f0d1102fb1b1effbfcf53d967c7fc first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233474|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec33c7acb4aa38ea
Sources EV-7f28e96431bc3fe5764494eb Evidence SHA-256 b4932262edf87c66f9505f6d1ea054ef2f1f0d1102fb1b1effbfcf53d967c7fc 행 SHA-256 cfaf35f4ee2ed903f39b7b94dae4fbbaeee8fbd92730dda24324504a56790658 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_951af14192b76690 stable_project_key prjtDef:233474:ESB project_definition 233474 first_region_code ESB manual_source_format false project_name 154kV 삼호개폐소-화원(증)지중T/L 건설사업 project_name_list 154kV 삼호-화원 지중T/L 복도체화 건설사업 purpose 삼호-화원T/L 과부하 해소 project_region_detail 전남광주통합특별시 영암군,해남군 project_period_raw 2021.07~2024.10 project_scale_raw 154KV XLPE 2000㎟, 2C(C)-6.8KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_951af14192b76690
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_951af14192b76690
Sources EV-76c162a22b59ecde57504a6a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2a68e9057d1b11a541f51b9e8ba5487278c4ec7b17faf80f4cef64f9e25e5385 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-cf7d67415e106267c586cc11
Detailed source fields Original source field Published value or condition stable_project_id kproj_eb50a8326842a600 stable_project_key prjtDef:234515:ESB project_definition 234515 first_region_code ESB manual_source_format false project_name 154kV 삼호동-태화동 전력구 건설사업 project_name_list 울산지역 전기공급시설 전력구공사(삼호동, 태화동 지중화1차) purpose 울산시의 지중화사업 신청 project_region_detail 울산광역시 남구,중구 project_period_raw 2022.10~2026.11 project_scale_raw 전력구 253M, 실드TBM 1,298M, C/H 4개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_eb50a8326842a600
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_eb50a8326842a600
Sources EV-cf7d67415e106267c586cc11 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f4f4c3562271483de7f8297634d65b59998e5f7c40695000e31f6270edd16884 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234515|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_37694d62dae4310e
Sources EV-144d5787141411c6b4295c93 Evidence SHA-256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c 행 SHA-256 121dd11822aebf5831e44b92aa84fc464343c14aa7279dd83a70aa7fb38d2054 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234515|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_37694d62dae4310e
Sources EV-144d5787141411c6b4295c93 Evidence SHA-256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c 행 SHA-256 121dd11822aebf5831e44b92aa84fc464343c14aa7279dd83a70aa7fb38d2054 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_37694d62dae4310e stable_project_id kproj_eb50a8326842a600 source_key 202609|234515|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 울산지역 전기공급시설 전력구공사(삼호동, 태화동 지중화1차) project_name_detail 154kV 삼호동-태화동 전력구 건설사업 region_summary_raw 울산광역시 남구등 2 지역 equipment_type_raw 전력구 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 전력구 253M, 실드TBM 1,298M, C/H 4개소 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 건설공사 개요 공사 착공: 2022.10 공사 기간: 2022.10 ~ 2026.11 감독자: [redacted], 실적): 100, 45 □ ‘17.12 : 삼호동, 태화동 송전선로 지중화사업 협약서체결(울산시-한전) □ ‘18. 5 : 설계용역 착수 □ ‘21. 6 : 실시설계완료 □ ‘22. 9 : 공사계약 □ ‘23. 9 : 공사 실착공 □ ‘24. 5 : 발진수직구 작업장 조성 및 사면 녹화작업 완료 □ ‘25. 5 : 발진수직구(68m) 굴착 완료, 전·후방터널 설치 착수 □ ‘25.11 : Shield TBM 굴진 및 도달수직구 굴착 착수 □ ‘26. 2 : Shield TBM 본굴진 및 도달수직구 굴착 □ ‘26. 9 : Shield TBM 굴진 완료(1,298m) 및 도달수직구 굴착 완료(46m) future_plan_redacted □ 향후계획 □ ‘17.12 : 삼호동, 태화동 송전선로 지중화사업 협약서체결(울산시-한전) □ ‘18. 5 : 설계용역 착수 □ ‘21. 6 : 실시설계완료 □ ‘22. 9 : 공사계약 □ ‘23. 9 : 공사 실착공 □ ‘24. 5 : 발진수직구 작업장 조성 및 사면 녹화작업 완료 □ ‘25. 5 : 발진수직구(68m) 굴착 완료, 전·후방터널 설치 착수 □ ‘25.11 : Shield TBM 굴진 및 도달수직구 굴착 착수 □ ‘26. 2 : Shield TBM 본굴진 및 도달수직구 굴착 □ ‘26. 9 : Shield TBM 굴진 완료(1,298m) 및 도달수직구 굴착 완료(46m) attachment_count 0 source_detail_sha256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234515|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_37694d62dae4310e
Sources EV-144d5787141411c6b4295c93 Evidence SHA-256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c 행 SHA-256 121dd11822aebf5831e44b92aa84fc464343c14aa7279dd83a70aa7fb38d2054 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_eb50a8326842a600 stable_project_key prjtDef:234515:ESB project_definition 234515 first_region_code ESB manual_source_format false project_name 154kV 삼호동-태화동 전력구 건설사업 project_name_list 울산지역 전기공급시설 전력구공사(삼호동, 태화동 지중화1차) purpose 울산시의 지중화사업 신청 project_region_detail 울산광역시 남구,중구 project_period_raw 2022.10~2026.11 project_scale_raw 전력구 253M, 실드TBM 1,298M, C/H 4개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_eb50a8326842a600
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_eb50a8326842a600
Sources EV-cf7d67415e106267c586cc11 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f4f4c3562271483de7f8297634d65b59998e5f7c40695000e31f6270edd16884 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-581344484a51338356f2b5a7
Detailed source fields Original source field Published value or condition stable_project_id kproj_12087962bfde63e3 stable_project_key prjtDef:231522:ESB project_definition 231522 first_region_code ESB manual_source_format false project_name 154kV 상운S/S 건설사업 project_name_list 154kV 상운S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 봉화군 project_period_raw 2021.11~2027.06 project_scale_raw 60MVA X 2BANK(최종 4BANK) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_12087962bfde63e3
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_12087962bfde63e3
Sources EV-581344484a51338356f2b5a7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 548a814b387b410c8135a617516c0362f4be966c2c126e0001fdc66a9322ee30 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231522|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c16fcc89f02fdcd2 stable_project_id kproj_12087962bfde63e3 source_key 202609|231522|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 상운S/S 건설사업 project_name_detail 154kV 상운S/S 건설사업 region_summary_raw 경상북도 봉화군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.01~2022.02 경과지(부지) 확정: 2022.07 주민의견 수렴 지자체 공고 열람: 2022.02 ~ 2022.02 설명회·공청회: 2023.02 자체설명회: 1. 주요 추진경과 □ '21.09 : 제9차 장기송변전설비계획 반영(준공목표 : ’27.06) □ '21.11 : 선제적 전력설비 입지선정 TF 결과 후보지 선정 □ '22.02 : 지장유무 조회결과에 따른 후보지 변경 □ '22.06 : 입지선정실무위원회 시행 □ '22.07 : 입지확정위원회 시행 □ '23.02 : 사업시행계획서 공고열람 시행 및 주민설명회 시행 □ '23.03 : 전원개발사업 실시계획 승인신청 □ '24.07 : 전원개발사업 실시계획 승인고시(산자부 고시 제2024-118호) □ '24.08 : 용지매수 의뢰 □ '25.04 : 기본설계 완료 2. 향후계획 □ '26.03 : 공사착공 □ '27.06 : 가압 및 준공 future_plan_redacted □ 향후계획 1. 주요 추진경과 □ '21.09 : 제9차 장기송변전설비계획 반영(준공목표 : ’27.06) □ '21.11 : 선제적 전력설비 입지선정 TF 결과 후보지 선정 □ '22.02 : 지장유무 조회결과에 따른 후보지 변경 □ '22.06 : 입지선정실무위원회 시행 □ '22.07 : 입지확정위원회 시행 □ '23.02 : 사업시행계획서 공고열람 시행 및 주민설명회 시행 □ '23.03 : 전원개발사업 실시계획 승인신청 □ '24.07 : 전원개발사업 실시계획 승인고시(산자부 고시 제2024-118호) □ '24.08 : 용지매수 의뢰 □ '25.04 : 기본설계 완료 2. 향후계획 □ '26.03 : 공사착공 □ '27.06 : 가압 및 준공 attachment_count 0 source_detail_sha256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231522|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c16fcc89f02fdcd2
Sources EV-7f280d1b8743e59011840600 Evidence SHA-256 0db997cbe0f8ed854d9f8d6627627b37dbb2b19a48c99a37c03ac4f9c60f35d1 행 SHA-256 2926d1a4f1006b89a698e9fa6c4984c77cca3ba15e360250e8b69459227c5cb0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_12087962bfde63e3 stable_project_key prjtDef:231522:ESB project_definition 231522 first_region_code ESB manual_source_format false project_name 154kV 상운S/S 건설사업 project_name_list 154kV 상운S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상북도 봉화군 project_period_raw 2021.11~2027.06 project_scale_raw 60MVA X 2BANK(최종 4BANK) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_12087962bfde63e3
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_12087962bfde63e3
Sources EV-581344484a51338356f2b5a7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 548a814b387b410c8135a617516c0362f4be966c2c126e0001fdc66a9322ee30 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-fd31a6fd9ef26a0ffd25a620
Detailed source fields Original source field Published value or condition stable_project_id kproj_1fca706f83031ebe stable_project_key prjtDef:232569:ESB project_definition 232569 first_region_code ESB manual_source_format false project_name 154kV 상운분기T/L 건설사업 project_name_list 154kV 상운분기 송전선로 건설사업 purpose 봉화지역 재생E 연계 선제적 용량 확보 project_region_detail 경상북도 봉화군 project_period_raw 2023.02~2028.06 project_scale_raw P240,4C,0.635KM responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_1fca706f83031ebe
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1fca706f83031ebe
Sources EV-fd31a6fd9ef26a0ffd25a620 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 421edf707be9432cfa142c0c03032ecff74db0fa5146a9377467e8f6d9422440 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232569|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_67423d33c5558959 stable_project_id kproj_1fca706f83031ebe source_key 202609|232569|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 상운분기 송전선로 건설사업 project_name_detail 154kV 상운분기T/L 건설사업 region_summary_raw 경상북도 봉화군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 계획확정 제09차 장기송변전설비계획 반영(2021.09) 입지선정 전력입지영향평가 용역 착수: 2022.09 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.12~2023.01 경과지(부지) 확정: 2023.01 환경/재해 영향평가 환경영향평가: 2023.04 ~ 2024.03 재해영향평가: 2023.04 ~ 2024.03 주민의견 수렴 지자체 공고 열람: 2023.02 ~ 2023.02 설명회·공청회: 2023.02 자체설명회: 2022.02 ~ 입지선정 및 주민의견 수렴 주요 내용 line □ `23.01 : 송전선로 입지확정위원회 시 사업설계 설계용역: 기본설계: 2024.04 ~ 2024.04 실시설계: 2025.08 ~ 2026.01 설계담당자: [redacted] 건설공사 개요 공사 착공: 2026.04 공사 기간: 감독자: [redacted], 실적): 59, 31 future_plan_redacted □ 향후계획 □ ‘27.06 : 선로가압 및 준공 attachment_count 0 source_detail_sha256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232569|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_67423d33c5558959
Sources EV-e934175c9db704ac1c410410 Evidence SHA-256 1f8ecdcf5780c4c2a3496ebaab3d94984a0ad5878b873df029ba8f14795dd61f 행 SHA-256 1bbd464e630b8e719da873e8bc81a40682bb3ea804f6ae6b77f399d966da0e94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_1fca706f83031ebe stable_project_key prjtDef:232569:ESB project_definition 232569 first_region_code ESB manual_source_format false project_name 154kV 상운분기T/L 건설사업 project_name_list 154kV 상운분기 송전선로 건설사업 purpose 봉화지역 재생E 연계 선제적 용량 확보 project_region_detail 경상북도 봉화군 project_period_raw 2023.02~2028.06 project_scale_raw P240,4C,0.635KM responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_1fca706f83031ebe
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1fca706f83031ebe
Sources EV-fd31a6fd9ef26a0ffd25a620 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 421edf707be9432cfa142c0c03032ecff74db0fa5146a9377467e8f6d9422440 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-14cc002defdc94eda5dde848
Detailed source fields Original source field Published value or condition stable_project_id kproj_5228f6d23ab4ad6f stable_project_key prjtDef:232473:ESB project_definition 232473 first_region_code ESB manual_source_format false project_name 154kV 상주#2분기T/L 건설사업 project_name_list 154kV 상주#2분기T/L 건설사업 purpose 신재생에너지 접속 project_region_detail 경상북도 상주시 project_period_raw 2026.03~2033.12 project_scale_raw ACSR 330㎟ X S X 4C, 12KM, 30기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_5228f6d23ab4ad6f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5228f6d23ab4ad6f
Sources EV-14cc002defdc94eda5dde848 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1ccfd5097589dc7cd8043c4e67ccdcc629e22c2d40eedd51c722e4ba5e460380 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2032-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232473|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a09c0fbd3d4dea24
Sources EV-0822297d988bcae73b6f77e5 Evidence SHA-256 33a4f4402f96a1038fe650e30859582f6259003cde1d71336826aa9077a518fb 행 SHA-256 7df7790d18fadb0533502ea57c8102f5908bc48ec03973869d0c9409ec6aca54 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2033-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232473|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a09c0fbd3d4dea24
Sources EV-0822297d988bcae73b6f77e5 Evidence SHA-256 33a4f4402f96a1038fe650e30859582f6259003cde1d71336826aa9077a518fb 행 SHA-256 7df7790d18fadb0533502ea57c8102f5908bc48ec03973869d0c9409ec6aca54 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232473|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a09c0fbd3d4dea24
Sources EV-0822297d988bcae73b6f77e5 Evidence SHA-256 33a4f4402f96a1038fe650e30859582f6259003cde1d71336826aa9077a518fb 행 SHA-256 7df7790d18fadb0533502ea57c8102f5908bc48ec03973869d0c9409ec6aca54 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a09c0fbd3d4dea24 stable_project_id kproj_5228f6d23ab4ad6f source_key 202609|232473|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 상주#2분기T/L 건설사업 project_name_detail 154kV 상주#2분기T/L 건설사업 region_summary_raw 경상북도 상주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 ACSR 330㎟ X S X 4C, 12KM, 30기 계획확정 제11차 장기송변전설비계획 반영(2032.10) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 33a4f4402f96a1038fe650e30859582f6259003cde1d71336826aa9077a518fb first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232473|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a09c0fbd3d4dea24
Sources EV-0822297d988bcae73b6f77e5 Evidence SHA-256 33a4f4402f96a1038fe650e30859582f6259003cde1d71336826aa9077a518fb 행 SHA-256 7df7790d18fadb0533502ea57c8102f5908bc48ec03973869d0c9409ec6aca54 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5228f6d23ab4ad6f stable_project_key prjtDef:232473:ESB project_definition 232473 first_region_code ESB manual_source_format false project_name 154kV 상주#2분기T/L 건설사업 project_name_list 154kV 상주#2분기T/L 건설사업 purpose 신재생에너지 접속 project_region_detail 경상북도 상주시 project_period_raw 2026.03~2033.12 project_scale_raw ACSR 330㎟ X S X 4C, 12KM, 30기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_5228f6d23ab4ad6f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5228f6d23ab4ad6f
Sources EV-14cc002defdc94eda5dde848 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1ccfd5097589dc7cd8043c4e67ccdcc629e22c2d40eedd51c722e4ba5e460380 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d5b168e84722c08bae157086
Detailed source fields Original source field Published value or condition stable_project_id kproj_761da28f2338f388 stable_project_key prjtDef:232507:ESB project_definition 232507 first_region_code ESB manual_source_format false project_name 154kV 상주#3T/L 건설사업 project_name_list 154kV 상주#3분기 송전선로 건설사업 purpose 상주지역 재생E연계 용량확보 project_region_detail 경상북도 상주시 project_period_raw 2030.06~2033.04 project_scale_raw ACSR 330㎟ X S X 4C, 15KM, 34기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_761da28f2338f388
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_761da28f2338f388
Sources EV-d5b168e84722c08bae157086 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 900953264c5773b8447565d05fe9b5a667e19a2ceee77faa3daa19a1e463e43c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2033-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232507|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_39efa654b5cd0a80
Sources EV-3d86eaa19930d75b290a7f74 Evidence SHA-256 bdacb8686c6aec76a47f849d9984f95630e37afd8e88f15b9d028dcae50f937a 행 SHA-256 bb410de3082d42aab791bc33bc836c092dd3289117f27a7b9a596db4b017ad4e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2030-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232507|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_39efa654b5cd0a80
Sources EV-3d86eaa19930d75b290a7f74 Evidence SHA-256 bdacb8686c6aec76a47f849d9984f95630e37afd8e88f15b9d028dcae50f937a 행 SHA-256 bb410de3082d42aab791bc33bc836c092dd3289117f27a7b9a596db4b017ad4e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_39efa654b5cd0a80 stable_project_id kproj_761da28f2338f388 source_key 202609|232507|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 상주#3분기 송전선로 건설사업 project_name_detail 154kV 상주#3T/L 건설사업 region_summary_raw 경상북도 상주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 ACSR 330㎟ X S X 4C, 15KM, 34기 입지선정 전력입지영향평가 용역 착수: 2026.03 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [향후계획] □ '29.09 : 입지선정위원회 착수 □ '32.10 : 준공 및 가압 future_plan_redacted □ 향후계획 [향후계획] □ '29.09 : 입지선정위원회 착수 □ '32.10 : 준공 및 가압 attachment_count 0 source_detail_sha256 bdacb8686c6aec76a47f849d9984f95630e37afd8e88f15b9d028dcae50f937a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232507|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_39efa654b5cd0a80
Sources EV-3d86eaa19930d75b290a7f74 Evidence SHA-256 bdacb8686c6aec76a47f849d9984f95630e37afd8e88f15b9d028dcae50f937a 행 SHA-256 bb410de3082d42aab791bc33bc836c092dd3289117f27a7b9a596db4b017ad4e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_761da28f2338f388 stable_project_key prjtDef:232507:ESB project_definition 232507 first_region_code ESB manual_source_format false project_name 154kV 상주#3T/L 건설사업 project_name_list 154kV 상주#3분기 송전선로 건설사업 purpose 상주지역 재생E연계 용량확보 project_region_detail 경상북도 상주시 project_period_raw 2030.06~2033.04 project_scale_raw ACSR 330㎟ X S X 4C, 15KM, 34기 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_761da28f2338f388
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_761da28f2338f388
Sources EV-d5b168e84722c08bae157086 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 900953264c5773b8447565d05fe9b5a667e19a2ceee77faa3daa19a1e463e43c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-10f65e36ff788d397c7d340a
Detailed source fields Original source field Published value or condition stable_project_id kproj_b61224305c248fc2 stable_project_key prjtDef:232707:ESB project_definition 232707 first_region_code ESB manual_source_format false project_name 154kV 새만금#2-농생#1 건설사업 project_name_list 154kV 새만금#2-농생#1 송전선로 건설사업 purpose 군산시 및 산단 안정적인 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw project_scale_raw ACSR 410㎟×2B×2C×3KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_b61224305c248fc2
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b61224305c248fc2
Sources EV-10f65e36ff788d397c7d340a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f18f373fe6ed895946b7e08a1f7a302ea7ebc266605ccabaf728de5bf096538c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e60e2262b9ff72b2 stable_project_id kproj_b61224305c248fc2 source_key 202609|232707|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 새만금#2-농생#1 송전선로 건설사업 project_name_detail 154kV 새만금#2-농생#1 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 3902237fa539c3e9470fdd2f2b4b1df37f2dd25236e5da81bd27b24de025bb0f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232707|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e60e2262b9ff72b2
Sources EV-ef5bdb771b87c3af50ad8eb3 Evidence SHA-256 3902237fa539c3e9470fdd2f2b4b1df37f2dd25236e5da81bd27b24de025bb0f 행 SHA-256 8a31e6e91692f010e421affa8d53be63ac353b7fd4da563d5195fed5e8731c50 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_b61224305c248fc2 stable_project_key prjtDef:232707:ESB project_definition 232707 first_region_code ESB manual_source_format false project_name 154kV 새만금#2-농생#1 건설사업 project_name_list 154kV 새만금#2-농생#1 송전선로 건설사업 purpose 군산시 및 산단 안정적인 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw project_scale_raw ACSR 410㎟×2B×2C×3KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_b61224305c248fc2
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b61224305c248fc2
Sources EV-10f65e36ff788d397c7d340a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f18f373fe6ed895946b7e08a1f7a302ea7ebc266605ccabaf728de5bf096538c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-488d7289ae7c049b94179d51
Detailed source fields Original source field Published value or condition stable_project_id kproj_1894da8d7bf1cf51 stable_project_key prjtDef:234510:ESB project_definition 234510 first_region_code ESB manual_source_format false project_name 154kV 새만금#2-농생#1 전력구 건설사업 project_name_list 154kV 새만금#2-농생#1 전력구 건설사업 purpose 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw project_scale_raw L=0.11KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_1894da8d7bf1cf51
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1894da8d7bf1cf51
Sources EV-488d7289ae7c049b94179d51 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ab3f28d49aa7522e8d7e7eb15d224562a06ae6be15df6eb60cabd8c2aa01dec6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0a83f41513788887 stable_project_id kproj_1894da8d7bf1cf51 source_key 202609|234510|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 새만금#2-농생#1 전력구 건설사업 project_name_detail 154kV 새만금#2-농생#1 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 fafcc00eab2915054327400d7711e92c7a7a7d4c06a2efa6bb2a3eb61820c2fb first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234510|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0a83f41513788887
Sources EV-fa48f93f37f0de2cc805b9b6 Evidence SHA-256 fafcc00eab2915054327400d7711e92c7a7a7d4c06a2efa6bb2a3eb61820c2fb 행 SHA-256 ba4988b91edde8ef0082ddf65afd669db67f127e9fd2c03d96e74146d1b95d72 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_1894da8d7bf1cf51 stable_project_key prjtDef:234510:ESB project_definition 234510 first_region_code ESB manual_source_format false project_name 154kV 새만금#2-농생#1 전력구 건설사업 project_name_list 154kV 새만금#2-농생#1 전력구 건설사업 purpose 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw project_scale_raw L=0.11KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_1894da8d7bf1cf51
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1894da8d7bf1cf51
Sources EV-488d7289ae7c049b94179d51 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ab3f28d49aa7522e8d7e7eb15d224562a06ae6be15df6eb60cabd8c2aa01dec6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-57fc41b368f6582cab5ce7a6
Detailed source fields Original source field Published value or condition stable_project_id kproj_0bb74d8233983751 stable_project_key prjtDef:234915:ESB project_definition 234915 first_region_code ESB manual_source_format false project_name 154kV 새만금#3-수변도시 전력구 건설사업 project_name_list 154kV 새만금#3-수변도시 전력구 건설사업 purpose 새만금 스마트 수변도시 조성사업에 따른 신규부하 공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.03~2032.12 project_scale_raw XLPE 2,000㎟, 4C×19.5㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_0bb74d8233983751
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0bb74d8233983751
Sources EV-57fc41b368f6582cab5ce7a6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ed93ddf1105c069b8f97471467830b37e668eb8cda5195bd64eae19ded7ecec3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234915|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8de8783a31722e91
Sources EV-6e4f38c53877eb510d817339 Evidence SHA-256 93aa7c2be1c796451ddce3d5d584d682361fa3d3e38dae4480f75652b2e5dbd3 행 SHA-256 5994f7e8ef84c30eb641f4fbc2bd80b0287fea3a9bf3f51484af628eb9cfa481 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234915|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8de8783a31722e91
Sources EV-6e4f38c53877eb510d817339 Evidence SHA-256 93aa7c2be1c796451ddce3d5d584d682361fa3d3e38dae4480f75652b2e5dbd3 행 SHA-256 5994f7e8ef84c30eb641f4fbc2bd80b0287fea3a9bf3f51484af628eb9cfa481 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_8de8783a31722e91 stable_project_id kproj_0bb74d8233983751 source_key 202609|234915|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 새만금#3-수변도시 전력구 건설사업 project_name_detail 154kV 새만금#3-수변도시 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields Project purpose 새만금 스마트 수변도시 조성사업에 따른 신규부하 공급능력 확보 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 93aa7c2be1c796451ddce3d5d584d682361fa3d3e38dae4480f75652b2e5dbd3 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234915|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_8de8783a31722e91
Sources EV-6e4f38c53877eb510d817339 Evidence SHA-256 93aa7c2be1c796451ddce3d5d584d682361fa3d3e38dae4480f75652b2e5dbd3 행 SHA-256 5994f7e8ef84c30eb641f4fbc2bd80b0287fea3a9bf3f51484af628eb9cfa481 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_0bb74d8233983751 stable_project_key prjtDef:234915:ESB project_definition 234915 first_region_code ESB manual_source_format false project_name 154kV 새만금#3-수변도시 전력구 건설사업 project_name_list 154kV 새만금#3-수변도시 전력구 건설사업 purpose 새만금 스마트 수변도시 조성사업에 따른 신규부하 공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.03~2032.12 project_scale_raw XLPE 2,000㎟, 4C×19.5㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_0bb74d8233983751
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0bb74d8233983751
Sources EV-57fc41b368f6582cab5ce7a6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ed93ddf1105c069b8f97471467830b37e668eb8cda5195bd64eae19ded7ecec3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-47d528e6ffa241e51eadecdc
Detailed source fields Original source field Published value or condition stable_project_id kproj_25e17613f6d92d0d stable_project_key prjtDef:233979:ESB project_definition 233979 first_region_code ESB manual_source_format false project_name 154kV 새만금#3-수변도시 지중T/L 건설사업 project_name_list 154kV 새만금#3-수변도시 지중송전선로 건설사업 purpose 새만금 스마트 수변도시 조성사업에 따른 신규부하 공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.03~2032.12 project_scale_raw XLPE 2000㎟, 4C×2.4㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_25e17613f6d92d0d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_25e17613f6d92d0d
Sources EV-47d528e6ffa241e51eadecdc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 531ab024ff993741a4d4930c07d0b08ef673898e908d84550e6c32ae509d7b3f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233979|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_031071665a287371
Sources EV-a867140b009f1b852836c73d Evidence SHA-256 d7d8339573c1a3b23736c4ee5f7121df7272da27908b06d48e7ffb433973e552 행 SHA-256 da0471a7f1c2fd4c3c5087dae9d40694d7bafb92b0198ef0ecc5dadb8ab2a044 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233979|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_031071665a287371
Sources EV-a867140b009f1b852836c73d Evidence SHA-256 d7d8339573c1a3b23736c4ee5f7121df7272da27908b06d48e7ffb433973e552 행 SHA-256 da0471a7f1c2fd4c3c5087dae9d40694d7bafb92b0198ef0ecc5dadb8ab2a044 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233979|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_031071665a287371
Sources EV-a867140b009f1b852836c73d Evidence SHA-256 d7d8339573c1a3b23736c4ee5f7121df7272da27908b06d48e7ffb433973e552 행 SHA-256 da0471a7f1c2fd4c3c5087dae9d40694d7bafb92b0198ef0ecc5dadb8ab2a044 Observations for this power asset History for this project Previous Next