POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 삼호동-태화동 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-cf7d67415e106267c586cc11
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_eb50a8326842a600
stable_project_keyprjtDef:234515:ESB
project_definition234515
first_region_codeESB
manual_source_formatfalse
project_name154kV 삼호동-태화동 전력구 건설사업
project_name_list울산지역 전기공급시설 전력구공사(삼호동, 태화동 지중화1차)
purpose울산시의 지중화사업 신청
project_region_detail울산광역시 남구,중구
project_period_raw2022.10~2026.11
project_scale_raw전력구 253M, 실드TBM 1,298M, C/H 4개소
responsible_office_raw남부건설본부/직할
equipment_type전력구
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_37694d62dae4310e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_eb50a8326842a600

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_eb50a8326842a600

Sources EV-cf7d67415e106267c586cc11
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f4f4c3562271483de7f8297634d65b59998e5f7c40695000e31f6270edd16884
Source schedule candidates · KOR · kepco_planned

154kV 삼호동-태화동 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234515|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_37694d62dae4310e

Sources EV-144d5787141411c6b4295c93
Evidence SHA-256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c
행 SHA-256 121dd11822aebf5831e44b92aa84fc464343c14aa7279dd83a70aa7fb38d2054
Source schedule candidates · KOR · kepco_planned

154kV 삼호동-태화동 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-11
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234515|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_37694d62dae4310e

Sources EV-144d5787141411c6b4295c93
Evidence SHA-256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c
행 SHA-256 121dd11822aebf5831e44b92aa84fc464343c14aa7279dd83a70aa7fb38d2054
Source snapshots by date · KOR · kepco_planned

154kV 삼호동-태화동 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_37694d62dae4310e
stable_project_idkproj_eb50a8326842a600
source_key202609|234515|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list울산지역 전기공급시설 전력구공사(삼호동, 태화동 지중화1차)
project_name_detail154kV 삼호동-태화동 전력구 건설사업
region_summary_raw울산광역시 남구등 2 지역
equipment_type_raw전력구
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 울산시의 지중화사업 신청
Project region
  • 울산광역시 남구,중구
Project period
  • 2022.10~2026.11
사업 규모
  • 전력구 253M, 실드TBM 1,298M, C/H 4개소
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2022.10 공사 기간: 2022.10 ~ 2026.11 감독자: [redacted], 실적): 100, 45
□ ‘17.12 : 삼호동, 태화동 송전선로 지중화사업 협약서체결(울산시-한전) □ ‘18. 5 : 설계용역 착수 □ ‘21. 6 : 실시설계완료 □ ‘22. 9 : 공사계약 □ ‘23. 9 : 공사 실착공 □ ‘24. 5 : 발진수직구 작업장 조성 및 사면 녹화작업 완료 □ ‘25. 5 : 발진수직구(68m) 굴착 완료, 전·후방터널 설치 착수 □ ‘25.11 : Shield TBM 굴진 및 도달수직구 굴착 착수 □ ‘26. 2 : Shield TBM 본굴진 및 도달수직구 굴착 □ ‘26. 9 : Shield TBM 굴진 완료(1,298m) 및 도달수직구 굴착 완료(46m)
future_plan_redacted□ 향후계획 □ ‘17.12 : 삼호동, 태화동 송전선로 지중화사업 협약서체결(울산시-한전) □ ‘18. 5 : 설계용역 착수 □ ‘21. 6 : 실시설계완료 □ ‘22. 9 : 공사계약 □ ‘23. 9 : 공사 실착공 □ ‘24. 5 : 발진수직구 작업장 조성 및 사면 녹화작업 완료 □ ‘25. 5 : 발진수직구(68m) 굴착 완료, 전·후방터널 설치 착수 □ ‘25.11 : Shield TBM 굴진 및 도달수직구 굴착 착수 □ ‘26. 2 : Shield TBM 본굴진 및 도달수직구 굴착 □ ‘26. 9 : Shield TBM 굴진 완료(1,298m) 및 도달수직구 굴착 완료(46m)
attachment_count0
source_detail_sha256437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234515|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_37694d62dae4310e

Sources EV-144d5787141411c6b4295c93
Evidence SHA-256 437db23f4a8bbbd0193bfc86571010a87323b911cfbc53db64bd650bacf42d8c
행 SHA-256 121dd11822aebf5831e44b92aa84fc464343c14aa7279dd83a70aa7fb38d2054
Source snapshots by date · KOR · kepco_planned

154kV 삼호동-태화동 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_eb50a8326842a600
stable_project_keyprjtDef:234515:ESB
project_definition234515
first_region_codeESB
manual_source_formatfalse
project_name154kV 삼호동-태화동 전력구 건설사업
project_name_list울산지역 전기공급시설 전력구공사(삼호동, 태화동 지중화1차)
purpose울산시의 지중화사업 신청
project_region_detail울산광역시 남구,중구
project_period_raw2022.10~2026.11
project_scale_raw전력구 253M, 실드TBM 1,298M, C/H 4개소
responsible_office_raw남부건설본부/직할
equipment_type전력구
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_37694d62dae4310e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_eb50a8326842a600

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_eb50a8326842a600

Sources EV-cf7d67415e106267c586cc11
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f4f4c3562271483de7f8297634d65b59998e5f7c40695000e31f6270edd16884

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel