Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 상주#3T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d5b168e84722c08bae157086
Sources EV-3d86eaa19930d75b290a7f74 Evidence SHA-256 bdacb8686c6aec76a47f849d9984f95630e37afd8e88f15b9d028dcae50f937a 행 SHA-256 bb410de3082d42aab791bc33bc836c092dd3289117f27a7b9a596db4b017ad4eSource snapshots by date · KOR · kepco_planned
154kV 상주#3T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_39efa654b5cd0a80
stable_project_id
kproj_761da28f2338f388
source_key
202609|232507|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 상주#3분기 송전선로 건설사업
project_name_detail
154kV 상주#3T/L 건설사업
region_summary_raw
경상북도 상주시등 1 지역
equipment_type_raw
가공송전
headquarters_raw
남부건설본부
office_raw
대구경북건설지사
section_fields
Project purpose
상주지역 재생E연계 용량확보
Project region
경상북도 상주시
Project period
2030.06~2033.04
사업 규모
ACSR 330㎟ X S X 4C, 15KM, 34기
담당 사업소
남부건설본부/대구경북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 2026.03 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: