POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 13items · current page 1–13 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-f1a90c4c725bd1b15b3c4278
Detailed source fields Original source field Published value or condition stable_project_id kproj_7e00f2ed8c4a1afb stable_project_key prjtDef:231113:ESB project_definition 231113 first_region_code ESB manual_source_format false project_name 154kV 삼각지S/S 건설사업 project_name_list 154kV 삼각지변전소 건설사업 purpose 용산구일원의 안정적인 전력공급 project_region_detail 서울특별시 용산구 project_period_raw 1999.02~2039.06 project_scale_raw 154KV M.TR 60 MVA X 2 BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7e00f2ed8c4a1afb
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7e00f2ed8c4a1afb
Sources EV-f1a90c4c725bd1b15b3c4278 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 99615f4e6bb4ec59094daff4e2563f999fe2f5eaf4bf63456bf8541153b90864 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2008-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2039-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2010-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2030-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2008-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2039-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231113|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_29409b6c9b9aa86d stable_project_id kproj_7e00f2ed8c4a1afb source_key 202609|231113|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 삼각지변전소 건설사업 project_name_detail 154kV 삼각지S/S 건설사업 region_summary_raw 서울특별시 용산구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR 60 MVA X 2 BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ ’08.06 : 용산구청 건축허가(옥내변전소) □ ’08.11 : 변전소 형태 변경(지하변전소) 및 본사 재무처에서 잔여 부지 활용방안 검토 진행 결정 □ ’10.12 : 용산지구단위계획구역 ‘삼각맨션특별계획구역’ 편입 □ ’16.08 : 서울시, 도시환경정비 예정구역으로 지정 □ ’19.09 : 삼각지부지 활용T/F → 단독개발 결정(재무처 등 6개 부서) □ ’23.02 : 준공 목표 변경(’26.04 → ’30.06) □ ’24. 5 : 삼각맨션 일대 도시정비형 재개발사업 정비구역 지정 및 결정(안) 공람공고(용산구청) □ ’25. 4 : 용산구청 주관 주민설명회 개최 future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231113|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_29409b6c9b9aa86d
Sources EV-245da29c5e6d76ddf5fe337f Evidence SHA-256 631adfd0df439a7757054ee135d4fd2fe661b8005006198d382deb697d367db1 행 SHA-256 e308e08a318d71b75da37983a92cbc4402e9ebfda947bd53a1384846e8c18f32 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7e00f2ed8c4a1afb stable_project_key prjtDef:231113:ESB project_definition 231113 first_region_code ESB manual_source_format false project_name 154kV 삼각지S/S 건설사업 project_name_list 154kV 삼각지변전소 건설사업 purpose 용산구일원의 안정적인 전력공급 project_region_detail 서울특별시 용산구 project_period_raw 1999.02~2039.06 project_scale_raw 154KV M.TR 60 MVA X 2 BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7e00f2ed8c4a1afb
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7e00f2ed8c4a1afb
Sources EV-f1a90c4c725bd1b15b3c4278 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 99615f4e6bb4ec59094daff4e2563f999fe2f5eaf4bf63456bf8541153b90864 Observations for this power asset History for this project