POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 2901–3000 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_031071665a287371 stable_project_id kproj_25e17613f6d92d0d source_key 202609|233979|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 새만금#3-수변도시 지중송전선로 건설사업 project_name_detail 154kV 새만금#3-수변도시 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields Project purpose 새만금 스마트 수변도시 조성사업에 따른 신규부하 공급능력 확보 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ '26.01 : 새만금 지역 계통안정화를 위한 설비계획 확정(새만금#3-수변) future_plan_redacted □ 향후계획 □ '26.01 : 새만금 지역 계통안정화를 위한 설비계획 확정(새만금#3-수변) attachment_count 0 source_detail_sha256 d7d8339573c1a3b23736c4ee5f7121df7272da27908b06d48e7ffb433973e552 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233979|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_031071665a287371
Sources EV-a867140b009f1b852836c73d Evidence SHA-256 d7d8339573c1a3b23736c4ee5f7121df7272da27908b06d48e7ffb433973e552 행 SHA-256 da0471a7f1c2fd4c3c5087dae9d40694d7bafb92b0198ef0ecc5dadb8ab2a044 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_25e17613f6d92d0d stable_project_key prjtDef:233979:ESB project_definition 233979 first_region_code ESB manual_source_format false project_name 154kV 새만금#3-수변도시 지중T/L 건설사업 project_name_list 154kV 새만금#3-수변도시 지중송전선로 건설사업 purpose 새만금 스마트 수변도시 조성사업에 따른 신규부하 공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.03~2032.12 project_scale_raw XLPE 2000㎟, 4C×2.4㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_25e17613f6d92d0d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_25e17613f6d92d0d
Sources EV-47d528e6ffa241e51eadecdc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 531ab024ff993741a4d4930c07d0b08ef673898e908d84550e6c32ae509d7b3f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d78c8fe48068221eb3e2ad1f
Detailed source fields Original source field Published value or condition stable_project_id kproj_5f8bb22c0599f45d stable_project_key prjtDef:234698:ESB project_definition 234698 first_region_code ESB manual_source_format false project_name 154kV 새만금-내초 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(새만금-내초) purpose 새만금지역 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2023.05~2031.12 project_scale_raw 154KV 송전 3회 responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_5f8bb22c0599f45d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5f8bb22c0599f45d
Sources EV-d78c8fe48068221eb3e2ad1f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ceb9f4bb848fea0144320c8fc20991df959502b7ce5c51d6e019613456700616 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234698|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_610eebb813dadb92
Sources EV-8bb6aaff9420cce932c0a31d Evidence SHA-256 a8b4346d7597b916e9b71114debb3c37c75542c3b3cb7dd52f901460f61dc477 행 SHA-256 b5342c28f5a224ccd13743f6a8609aaac4353714234d774730f7adf509589e77 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234698|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_610eebb813dadb92
Sources EV-8bb6aaff9420cce932c0a31d Evidence SHA-256 a8b4346d7597b916e9b71114debb3c37c75542c3b3cb7dd52f901460f61dc477 행 SHA-256 b5342c28f5a224ccd13743f6a8609aaac4353714234d774730f7adf509589e77 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_610eebb813dadb92 stable_project_id kproj_5f8bb22c0599f45d source_key 202609|234698|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 군산지역 전기공급시설 전력구공사(새만금-내초) project_name_detail 154kV 새만금-내초 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 계획확정 제11차 장기송변전설비계획 반영(2025.10) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 a8b4346d7597b916e9b71114debb3c37c75542c3b3cb7dd52f901460f61dc477 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234698|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_610eebb813dadb92
Sources EV-8bb6aaff9420cce932c0a31d Evidence SHA-256 a8b4346d7597b916e9b71114debb3c37c75542c3b3cb7dd52f901460f61dc477 행 SHA-256 b5342c28f5a224ccd13743f6a8609aaac4353714234d774730f7adf509589e77 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5f8bb22c0599f45d stable_project_key prjtDef:234698:ESB project_definition 234698 first_region_code ESB manual_source_format false project_name 154kV 새만금-내초 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(새만금-내초) purpose 새만금지역 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2023.05~2031.12 project_scale_raw 154KV 송전 3회 responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_5f8bb22c0599f45d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5f8bb22c0599f45d
Sources EV-d78c8fe48068221eb3e2ad1f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ceb9f4bb848fea0144320c8fc20991df959502b7ce5c51d6e019613456700616 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-38d84fe610c23d563985c534
Detailed source fields Original source field Published value or condition stable_project_id kproj_9430d7e862d294f4 stable_project_key prjtDef:233625:ESB project_definition 233625 first_region_code ESB manual_source_format false project_name 154kV 새만금-동비응 지중T/L 건설사업 project_name_list 154kV 새만금-동비응 지중송전선로 건설사업 purpose 새만금 산업단지 신규부하공급 및 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2023.06~2027.10 project_scale_raw XLPE2,000㎟(D)/2,500㎟(S), 2C×6.0KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_9430d7e862d294f4
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9430d7e862d294f4
Sources EV-38d84fe610c23d563985c534 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1eb3314e2f135965aa1daeb200a34fdfd570f0a9970b72e877427e70d0267948 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2017-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233625|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a34599579c42f064 stable_project_id kproj_9430d7e862d294f4 source_key 202609|233625|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 새만금-동비응 지중송전선로 건설사업 project_name_detail 154kV 새만금-동비응 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 XLPE2,000㎟(D)/2,500㎟(S), 2C×6.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 2024.11 ~ 2025.10 설계담당자: [redacted] 건설공사 개요 공사 착공: 2026.02 공사 기간: 2026.02 ~ 2027.03 감독자: [redacted], 실적): 92, 73 [진행경과] □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(새만금-비응#3 → 새만금-비응#2) □ '24.10 지중공사 기본설계 완료 □ '25.04 주자재(케이블 및 접속재 등) 발주 □ '26.02 지중공사 착공 [향후계획] □ '26.10 선로가압 future_plan_redacted □ 향후계획 [진행경과] □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(새만금-비응#3 → 새만금-비응#2) □ '24.10 지중공사 기본설계 완료 □ '25.04 주자재(케이블 및 접속재 등) 발주 □ '26.02 지중공사 착공 [향후계획] □ '26.10 선로가압 attachment_count 0 source_detail_sha256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233625|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a34599579c42f064
Sources EV-db8b8a87621e79bf7c19e584 Evidence SHA-256 b7f37f158803fd00723e34c8f2deece8388ccd995aaaa4ee755cb470b45423ac 행 SHA-256 6e26dcde3eceb5aa2ef01b1435902dd7e8535c7ce165f0a8c333c1eea4817871 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_9430d7e862d294f4 stable_project_key prjtDef:233625:ESB project_definition 233625 first_region_code ESB manual_source_format false project_name 154kV 새만금-동비응 지중T/L 건설사업 project_name_list 154kV 새만금-동비응 지중송전선로 건설사업 purpose 새만금 산업단지 신규부하공급 및 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2023.06~2027.10 project_scale_raw XLPE2,000㎟(D)/2,500㎟(S), 2C×6.0KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_9430d7e862d294f4
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9430d7e862d294f4
Sources EV-38d84fe610c23d563985c534 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1eb3314e2f135965aa1daeb200a34fdfd570f0a9970b72e877427e70d0267948 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4b4ba78c0960e6dac66d3065
Detailed source fields Original source field Published value or condition stable_project_id kproj_0171185a92d007a2 stable_project_key prjtDef:234662:ESB project_definition 234662 first_region_code ESB manual_source_format false project_name 154kV 새만금-비응#2 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(동비응-새만금)) purpose 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2024.02~2026.10 project_scale_raw 송전관로 4회선 5.4KM (터널 0.2KM 포함) responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_0171185a92d007a2
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0171185a92d007a2
Sources EV-4b4ba78c0960e6dac66d3065 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1dcc4455edf5b7a3d5f090064512a3b552ff07c5d64898f2639b3af4673a1ba1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234662|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4a4cf708ad24cb53
Sources EV-584c9120f13aefb4b758d506 Evidence SHA-256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3 행 SHA-256 29abb3e4dd51bcd55914ec7b4894984f0db7a457e13955ebc58dcad0447eab4b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234662|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4a4cf708ad24cb53
Sources EV-584c9120f13aefb4b758d506 Evidence SHA-256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3 행 SHA-256 29abb3e4dd51bcd55914ec7b4894984f0db7a457e13955ebc58dcad0447eab4b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4a4cf708ad24cb53 stable_project_id kproj_0171185a92d007a2 source_key 202609|234662|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 군산지역 전기공급시설 전력구공사(동비응-새만금)) project_name_detail 154kV 새만금-비응#2 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 송전관로 4회선 5.4KM (터널 0.2KM 포함) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.03 ~ 2024.11 기본설계: 2024.03 ~ 2024.06 실시설계: 2024.06 ~ 2024.11 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.07 공사 기간: 2025.07 ~ 2027.03 감독자: [redacted], 실적): 99, 80 ㅇ'24.11 설계 완료 ㅇ'25.01 시공사 입찰공고 ㅇ'25.06 시공사 계약 ㅇ'25.06 공사 착공(6/25) ㅇ'27.03 공사 준공(예정) future_plan_redacted □ 향후계획 ㅇ'24.11 설계 완료 ㅇ'25.01 시공사 입찰공고 ㅇ'25.06 시공사 계약 ㅇ'25.06 공사 착공(6/25) ㅇ'27.03 공사 준공(예정) attachment_count 0 source_detail_sha256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234662|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4a4cf708ad24cb53
Sources EV-584c9120f13aefb4b758d506 Evidence SHA-256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3 행 SHA-256 29abb3e4dd51bcd55914ec7b4894984f0db7a457e13955ebc58dcad0447eab4b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_0171185a92d007a2 stable_project_key prjtDef:234662:ESB project_definition 234662 first_region_code ESB manual_source_format false project_name 154kV 새만금-비응#2 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(동비응-새만금)) purpose 계통보강 project_region_detail 전북특별자치도 군산시 project_period_raw 2024.02~2026.10 project_scale_raw 송전관로 4회선 5.4KM (터널 0.2KM 포함) responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_0171185a92d007a2
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0171185a92d007a2
Sources EV-4b4ba78c0960e6dac66d3065 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1dcc4455edf5b7a3d5f090064512a3b552ff07c5d64898f2639b3af4673a1ba1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a46fa7c07fc9d382a81ce0b6
Detailed source fields Original source field Published value or condition stable_project_id kproj_547d82c9c29ed397 stable_project_key prjtDef:232331:ESB project_definition 232331 first_region_code ESB manual_source_format false project_name 154kV 서고창-고창T/L 건설사업 project_name_list 154kV 서고창-고창T/L 건설사업 purpose 서고창S/S 단일계통 해소 및 전북 지역 계통보강 project_region_detail 전북특별자치도 고창군 project_period_raw 2011.11~2027.12 project_scale_raw ACSR 410㎟×2B×2C responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_547d82c9c29ed397
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_547d82c9c29ed397
Sources EV-a46fa7c07fc9d382a81ce0b6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3ceced22a79445f71272567b91b4e812d8ca5fca2e15db72b1d8ca52354dd0a7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232331|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b9fb3d1efbc94d1
Sources EV-2edf24e1a9d9c374fea89225 Evidence SHA-256 cf1bf9b526182dddbe1fb9f7baf7ccc0321e758aad8d77ec12a331c8f4675702 행 SHA-256 4b68935e11d029178ee02d236307202c4d2d37bc8ffb3b4840d8ceb343f95904 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2011-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232331|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b9fb3d1efbc94d1
Sources EV-2edf24e1a9d9c374fea89225 Evidence SHA-256 cf1bf9b526182dddbe1fb9f7baf7ccc0321e758aad8d77ec12a331c8f4675702 행 SHA-256 4b68935e11d029178ee02d236307202c4d2d37bc8ffb3b4840d8ceb343f95904 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_3b9fb3d1efbc94d1 stable_project_id kproj_547d82c9c29ed397 source_key 202609|232331|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 서고창-고창T/L 건설사업 project_name_detail 154kV 서고창-고창T/L 건설사업 region_summary_raw 전북특별자치도 고창군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields Project purpose 서고창S/S 단일계통 해소 및 전북 지역 계통보강 입지선정 전력입지영향평가 용역 착수: 2012.02 입지선정위원회 구성시기: 2012.12 참여 위원 수 : 16 지장유무 조회: 2013.11~2014.12 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ○ '12.12~'14.12 : 입지선정위원회 시행(1~5차 회의) 및 중단 ○ '15.01~ : 입지선정 관련 지자체 지속 협의 중 line [추진실적] □ ‘12.05~‘12.12 : 사업설명 및 입지선정위원회 구성 □ ‘12.12~‘15.04 : 입지선정위원회 5차 회의(지자체 반대로 경과지 확정 불가) □ ‘15.10~‘19.04 : 서고창S/S 용도변경 관련 지자체 협의 및 최종 승인 □ ‘21.05 : 서남권 해상풍력 공동접속설비 건설사업과 4회선 추진계획 수립 □ ‘22.03~‘23.05 : 서남권 해상풍력 공동접속설비 건설사업 입지선정위원회 시행 (고창 : 4차 회의 完, 정읍 : 2차 회의 完) □ ‘24.03 : 서남권 해상풍력 공동접속설비 양육점 확정(부안군) □ ‘25.07~ : 고창지역 전력사업 추진 관련 고창군청 신활력경제정책관 지속 협의 중 [향후계획] □ ‘26.06 : 입지선정위원회 재시행 □ ‘27.06 : 최적경과지 선정 및 설계측량 시 future_plan_redacted line □ 향후계획 [추진실적] □ ‘12.05~‘12.12 : 사업설명 및 입지선정위원회 구성 □ ‘12.12~‘15.04 : 입지선정위원회 5차 회의(지자체 반대로 경과지 확정 불가) □ ‘15.10~‘19.04 : 서고창S/S 용도변경 관련 지자체 협의 및 최종 승인 □ ‘21.05 : 서남권 해상풍력 공동접속설비 건설사업과 4회선 추진계획 수립 □ ‘22.03~‘23.05 : 서남권 해상풍력 공동접속설비 건설사업 입지선정위원회 시행 (고창 : 4차 회의 完, 정읍 : 2차 회의 完) □ ‘24.03 : 서남권 해상풍력 공동접속설비 양육점 확정(부안군) □ ‘25.07~ : 고창지역 전력사업 추진 관련 고창군청 신활력경제정책관 지속 협의 중 [향후계획] □ ‘26.06 : 입지선정위원회 재시행 □ ‘27.06 : 최적경과지 선정 및 설계측량 시 attachment_count 0 source_detail_sha256 cf1bf9b526182dddbe1fb9f7baf7ccc0321e758aad8d77ec12a331c8f4675702 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232331|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b9fb3d1efbc94d1
Sources EV-2edf24e1a9d9c374fea89225 Evidence SHA-256 cf1bf9b526182dddbe1fb9f7baf7ccc0321e758aad8d77ec12a331c8f4675702 행 SHA-256 4b68935e11d029178ee02d236307202c4d2d37bc8ffb3b4840d8ceb343f95904 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_547d82c9c29ed397 stable_project_key prjtDef:232331:ESB project_definition 232331 first_region_code ESB manual_source_format false project_name 154kV 서고창-고창T/L 건설사업 project_name_list 154kV 서고창-고창T/L 건설사업 purpose 서고창S/S 단일계통 해소 및 전북 지역 계통보강 project_region_detail 전북특별자치도 고창군 project_period_raw 2011.11~2027.12 project_scale_raw ACSR 410㎟×2B×2C responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_547d82c9c29ed397
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_547d82c9c29ed397
Sources EV-a46fa7c07fc9d382a81ce0b6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3ceced22a79445f71272567b91b4e812d8ca5fca2e15db72b1d8ca52354dd0a7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-39b945b5dd982ea06733d16f
Detailed source fields Original source field Published value or condition stable_project_id kproj_82f0576435bc5295 stable_project_key prjtDef:231577:ESB project_definition 231577 first_region_code ESB manual_source_format false project_name 154kV 서동탄 건설사업 project_name_list 154kV 서동탄변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 화성시 project_period_raw 2021.07~2029.04 project_scale_raw 154/23KV 15/20MVA X 3대 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_82f0576435bc5295
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_82f0576435bc5295
Sources EV-39b945b5dd982ea06733d16f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 76e9434461ba094a4c39bcaf7421dad5d227e3b5fffe8045ea15bfb927f6f300 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231577|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e6f2d34ce3000d74 stable_project_id kproj_82f0576435bc5295 source_key 202609|231577|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 서동탄변전소 건설사업 project_name_detail 154kV 서동탄 건설사업 region_summary_raw 경기도 화성시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields 사업 규모 154/23KV 15/20MVA X 3대 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2023.01 참여 위원 수 : 14 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 진행경과 - 21. 7 : 제 9차 장기송변전설비계획 반영 - 23. 2 : 입지선정실무위원회 결과보고 - 24. 6 : 입지확정위원회 결과보고 사업설계 설계용역: 2027.05 ~ 2027.09 기본설계: 2027.01 ~ 2027.03 실시설계: 2027.05 ~ 2027.09 설계담당자: [redacted] 향후계획 - 28. 8 : 토건공사 착공 - 28. 9 : 변전공사 착공 - 30. 7 : 변전소 가압 future_plan_redacted □ 향후계획 향후계획 - 28. 8 : 토건공사 착공 - 28. 9 : 변전공사 착공 - 30. 7 : 변전소 가압 attachment_count 0 source_detail_sha256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231577|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e6f2d34ce3000d74
Sources EV-2245c52e2219aad6e6eabcae Evidence SHA-256 64fa37bf0668c18b48a80449677bfe696da07fe6e46cc60ccdae339ff4b31e3c 행 SHA-256 65942a422df8e73e9d2deaf0a5583f952dffa0f6ca596ed6b8996bd078e5ce40 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_82f0576435bc5295 stable_project_key prjtDef:231577:ESB project_definition 231577 first_region_code ESB manual_source_format false project_name 154kV 서동탄 건설사업 project_name_list 154kV 서동탄변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 화성시 project_period_raw 2021.07~2029.04 project_scale_raw 154/23KV 15/20MVA X 3대 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_82f0576435bc5295
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_82f0576435bc5295
Sources EV-39b945b5dd982ea06733d16f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 76e9434461ba094a4c39bcaf7421dad5d227e3b5fffe8045ea15bfb927f6f300 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-2c2426f1057c770d4da2252c
Detailed source fields Original source field Published value or condition stable_project_id kproj_f37a94b92070890e stable_project_key prjtDef:234641:ESB project_definition 234641 first_region_code ESB manual_source_format false project_name 154kV 서동탄분기 전력구 건설사업 project_name_list 154kV 서동탄분기 전력구공사 purpose 동탄지역 전력공급 project_region_detail 경기도 화성시 project_period_raw 2023.10~2029.04 project_scale_raw SHIELD TBM 1.3KM, 개착전력구 75M responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_f37a94b92070890e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f37a94b92070890e
Sources EV-2c2426f1057c770d4da2252c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 dda75d6b2c5e4023e9ba6555aca2ff8f97db8f865fa891d2a687ee675b625ab7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234641|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b5e341bfa1b32bcf
Sources EV-db70ff3283e591ba879ba39d Evidence SHA-256 ad378ad901cce76e2bd83ff1bb63e87bce34faacb94c61afd88d2cba29f3998f 행 SHA-256 a9b032675055b9ac54e7c39449830dc59c5a4f0b092153e00ec427db14399f1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234641|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b5e341bfa1b32bcf
Sources EV-db70ff3283e591ba879ba39d Evidence SHA-256 ad378ad901cce76e2bd83ff1bb63e87bce34faacb94c61afd88d2cba29f3998f 행 SHA-256 a9b032675055b9ac54e7c39449830dc59c5a4f0b092153e00ec427db14399f1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b5e341bfa1b32bcf stable_project_id kproj_f37a94b92070890e source_key 202609|234641|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 서동탄분기 전력구공사 project_name_detail 154kV 서동탄분기 전력구 건설사업 region_summary_raw 경기도 화성시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 SHIELD TBM 1.3KM, 개착전력구 75M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2023.10 ~ 2026.12 기본설계: 2023.10 ~ 2024.08 실시설계: 2024.08 ~ 2026.12 설계담당자: [redacted] future_plan_redacted □ 향후계획 ○ 계약의뢰 후 공고 준비 중 attachment_count 0 source_detail_sha256 ad378ad901cce76e2bd83ff1bb63e87bce34faacb94c61afd88d2cba29f3998f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234641|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b5e341bfa1b32bcf
Sources EV-db70ff3283e591ba879ba39d Evidence SHA-256 ad378ad901cce76e2bd83ff1bb63e87bce34faacb94c61afd88d2cba29f3998f 행 SHA-256 a9b032675055b9ac54e7c39449830dc59c5a4f0b092153e00ec427db14399f1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f37a94b92070890e stable_project_key prjtDef:234641:ESB project_definition 234641 first_region_code ESB manual_source_format false project_name 154kV 서동탄분기 전력구 건설사업 project_name_list 154kV 서동탄분기 전력구공사 purpose 동탄지역 전력공급 project_region_detail 경기도 화성시 project_period_raw 2023.10~2029.04 project_scale_raw SHIELD TBM 1.3KM, 개착전력구 75M responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_f37a94b92070890e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f37a94b92070890e
Sources EV-2c2426f1057c770d4da2252c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 dda75d6b2c5e4023e9ba6555aca2ff8f97db8f865fa891d2a687ee675b625ab7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-aa3514b19cd95c5b9a2eb923
Detailed source fields Original source field Published value or condition stable_project_id kproj_2bac602f91a9c6ac stable_project_key prjtDef:231661:ESB project_definition 231661 first_region_code ESB manual_source_format false project_name 154kV 서보은(수한)S/S 건설사업 project_name_list 154kV 서보은(수한)변전소 건설사업 purpose 보은지역 재생E 연계 project_region_detail 충청북도 보은군 project_period_raw 2024.06~2030.12 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_2bac602f91a9c6ac
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2bac602f91a9c6ac
Sources EV-aa3514b19cd95c5b9a2eb923 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 032621102d10d55222805fdf6f880dbeb91045dddcedc233a351bf44c15aa5d0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231661|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0b44ccd7ef13276a
Sources EV-86d17b4a1ec356cc97c4b379 Evidence SHA-256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8 행 SHA-256 6d1ccfbed25c06b1cd7440dbd94bc31ecff8402c4717f9a5a95e53729e4e5005 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231661|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0b44ccd7ef13276a
Sources EV-86d17b4a1ec356cc97c4b379 Evidence SHA-256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8 행 SHA-256 6d1ccfbed25c06b1cd7440dbd94bc31ecff8402c4717f9a5a95e53729e4e5005 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0b44ccd7ef13276a stable_project_id kproj_2bac602f91a9c6ac source_key 202609|231661|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 서보은(수한)변전소 건설사업 project_name_detail 154kV 서보은(수한)S/S 건설사업 region_summary_raw 충청북도 보은군등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2024.10 입지선정위원회 구성시기: 2025.04 참여 위원 수 : 13 경과지(부지) 확정: 2025.12 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 [진행경과] □ '23.05. : 제10차 장기 송변전설비계획 신규사업 반영 □ '24.10. : 전력영향평가 용역 착수 □ '24.12. : 지자체(보은군 및 4개읍면) 대상 사업설명 시행 □ '25.01. : 이장협의회 대상 사업설명 시행 □ '25.03. : 입지선정위원회 구성(주민대표 8, 전문가2, 지자체 1, 한전2) □ '25.04. : 입지선정위원회 1차 회의 시행 - 내용 : 위원장 선출, 운영규범 확정, 건설사업 개요 및 입지선정위원회 설명 등 □ '25.06. : 입지선정위원회 2차 회의 시행 - 내용 : 사업대상지역 개황조사 결과보고, 입지선정 기준 안내, 변전소 후보지역 선호도 설문 시행 등 □ '25.08. : 입지선정위원회 3차 회의 시행(입지선정위원 추가, 예비후보지답사, 후보지역도출 등) - 내용 : 입지선정위원 추가(주민대표 2명), 예비후보지답사, 후보지역도출 등 □ '25.11. : 입지선정위원회 4차 회의 시행 - 내용 : 지장유무조회, 간이환경성 분석 및 경관영향 검토 결과보고 등 □ '25.12. : 입지선정위원회 5차 회의 시행 - 내용 : 대안평가 결과보고, 변전소(송전선로) 최적부지 심의 및 의결, 입지선정위원회 폐회 등 □ '26.01 : 입지확정위원회 구성 및 심의 시행 중 □ '26.02 : 입지확정위원회 심의결과 보고 □ '26.03 : 입지확정 변경위원회 구성 및 심의 진행중 □ '26.03 : 입지확정 변경위원회 심의 결과 보고 □ '26.04 : 변전소 부지확정 □ '26.05 ~ '26.09 : 전원개발사업 사업시행계획서 작성 [향후계획] □‘26.10 : 사업시행계획 공람 공고 및 주민 설명회 시행 □‘28.01 : 용지매수 완료 □‘28.11 : 변전설계 완료 □‘29.04 : 변전공사 착공 □‘30.12 : 변전소 운전 future_plan_redacted □ 향후계획 [향후계획] □‘26.10 : 사업시행계획 공람 공고 및 주민 설명회 시행 □‘28.01 : 용지매수 완료 □‘28.11 : 변전설계 완료 □‘29.04 : 변전공사 착공 □‘30.12 : 변전소 운전 attachment_count 0 source_detail_sha256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231661|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0b44ccd7ef13276a
Sources EV-86d17b4a1ec356cc97c4b379 Evidence SHA-256 83a513898f1fbcafb0d45138b8c49952f16238607795557a42164ddc7a8811c8 행 SHA-256 6d1ccfbed25c06b1cd7440dbd94bc31ecff8402c4717f9a5a95e53729e4e5005 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2bac602f91a9c6ac stable_project_key prjtDef:231661:ESB project_definition 231661 first_region_code ESB manual_source_format false project_name 154kV 서보은(수한)S/S 건설사업 project_name_list 154kV 서보은(수한)변전소 건설사업 purpose 보은지역 재생E 연계 project_region_detail 충청북도 보은군 project_period_raw 2024.06~2030.12 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_2bac602f91a9c6ac
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2bac602f91a9c6ac
Sources EV-aa3514b19cd95c5b9a2eb923 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 032621102d10d55222805fdf6f880dbeb91045dddcedc233a351bf44c15aa5d0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-c653ef4e5c725b8ab26e7b1d
Detailed source fields Original source field Published value or condition stable_project_id kproj_c1135ac9af819cfd stable_project_key prjtDef:232678:ESB project_definition 232678 first_region_code ESB manual_source_format false project_name 154kV 서보은(수한)분기T/L 건설사업 project_name_list 154kV 서보은(수한)분기 송전선로 건설사업 purpose 보은지역 신재생E 접속용량 선제적 확보 project_region_detail 충청북도 보은군 project_period_raw 2024.01~2030.12 project_scale_raw A410 × 4C × 1KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c1135ac9af819cfd
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c1135ac9af819cfd
Sources EV-c653ef4e5c725b8ab26e7b1d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 fda4960e9a73f8ac1453f309d781256130e13b3a7560113c9312563cefff9da4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232678|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1834c7ce9e8f23ee
Sources EV-4d9049528da0bf0aec699598 Evidence SHA-256 2db9d5ec1bde94aa0090d1fe7c234b3930bd73e5dedeecfdcc0fe2db31639171 행 SHA-256 f829dbccb571c27980349cafd23bb4670505240a343c9668515f0a58128ea1b6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232678|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1834c7ce9e8f23ee
Sources EV-4d9049528da0bf0aec699598 Evidence SHA-256 2db9d5ec1bde94aa0090d1fe7c234b3930bd73e5dedeecfdcc0fe2db31639171 행 SHA-256 f829dbccb571c27980349cafd23bb4670505240a343c9668515f0a58128ea1b6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_1834c7ce9e8f23ee stable_project_id kproj_c1135ac9af819cfd source_key 202609|232678|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 서보은(수한)분기 송전선로 건설사업 project_name_detail 154kV 서보은(수한)분기T/L 건설사업 region_summary_raw 충청북도 보은군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2024.10 입지선정위원회 구성시기: 2025.04 참여 위원 수 : 13 경과지(부지) 확정: 2025.12 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 [진행경과] □ '23.05. : 제10차 장기 송변전설비계획 신규사업 반영 □ '24.10. : 전력영향평가 용역 착수 □ '24.12. : 지자체(보은군 및 4개읍면) 대상 사업설명 시행 □ '25.01. : 이장협의회 대상 사업설명 시행 □ '25.03. : 입지선정위원회 구성(주민대표 8, 전문가2, 지자체 1, 한전2) □ '25.04. : 입지선정위원회 1차 회의 시행 - 내용 : 위원장 선출, 운영규범 확정, 건설사업 개요 및 입지선정위원회 설명 등 □ '25.06. : 입지선정위원회 2차 회의 시행 - 내용 : 사업대상지역 개황조사 결과보고, 입지선정 기준 안내, 변전소 후보지역 선호도 설문 시행 등 □ '25.08. : 입지선정위원회 3차 회의 시행(입지선정위원 추가, 예비후보지답사, 후보지역도출 등) - 내용 : 입지선정위원 추가(주민대표 2명), 예비후보지답사, 후보지역도출 등 □ '25.11. : 입지선정위원회 4차 회의 시행 - 내용 : 지장유무조회, 간이환경성 분석 및 경관영향 검토 결과보고 등 □ '25.12. : 입지선정위원회 5차 회의 시행 - 내용 : 대안평가 결과보고, 변전소(송전선로) 최적부지 심의 및 의결, 입지선정위원회 폐회 등 □ '26.01 : 입지확정위원회 구성 및 심의 시행 중 □ '26.02 : 입지확정위원회 심의결과 보고 □ '26.03 : 입지확정 변경위원회 구성 및 심의 진행중 □ '26.03 : 입지확정 변경위원회 심의 결과 보고 □ '26.04 : 변전소 부지확정 □ '26.05 ~ '26.09 : 전원개발사업 사업시행계획서 작성 [추진실적] □ '23.05 : 제10차 장기 송변전설비계획 신규 반영 □ '24.08 : 변전소 명칭 변경(수한⇒서보은) □ '24.10 : 전력영향평가용역 착수 □ '24.11~`25.01 : 지자체(군,면) 및 이장협의회 등 사업설명 시행 □ '25.02 : 입지선정위원회 구성 완료(주민대표 8명, 전문가 2명, 지자체 1명, 한전 2명) □ '25.04 : 입지선정위원회 1차회의 시행(위원장 선출, 운영규범 결정) □ '25.06 : 입지선정위원회 2차회의 시행(사업대상지역 개황조사 결과보고, 입지선정 기준 안내) □ '25.08 : 입지선정위원회 3차회의 시행(예비후보지역 현장답사, 후보지역 도출, 심의 및 의결) □ '25.11 : 입지선정위원회 4차회의 시행(주변 마을 사업설명회 및 지장유무조회 결과보고, 간이입지 환경성 분석 및 경관영향 검토 결과 보고, 대안평가 안내) □ '25.12 : 입지선정위원회 5차회의 시행(최종후보지 및 경과지 선정 완료) □ '26.02 : 입지확정위원회 구성 및 심의결과 보고 □ '26.03 : 설계 측량 시행(3/30~31) □ '26.05 : 설계 측량 결과 검토 및 소규모 환경영향평가 발주 의뢰 [향후 계획] □ '26.10 : 주민설명회 시행 (사전환경성 평가 용역 초안 완료시) □ '26.11 : 사업시행계획서 작성 □ '27.01 : 실시계획 신청자료 작성 future_plan_redacted □ 향후계획 [추진실적] □ '23.05 : 제10차 장기 송변전설비계획 신규 반영 □ '24.08 : 변전소 명칭 변경(수한⇒서보은) □ '24.10 : 전력영향평가용역 착수 □ '24.11~`25.01 : 지자체(군,면) 및 이장협의회 등 사업설명 시행 □ '25.02 : 입지선정위원회 구성 완료(주민대표 8명, 전문가 2명, 지자체 1명, 한전 2명) □ '25.04 : 입지선정위원회 1차회의 시행(위원장 선출, 운영규범 결정) □ '25.06 : 입지선정위원회 2차회의 시행(사업대상지역 개황조사 결과보고, 입지선정 기준 안내) □ '25.08 : 입지선정위원회 3차회의 시행(예비후보지역 현장답사, 후보지역 도출, 심의 및 의결) □ '25.11 : 입지선정위원회 4차회의 시행(주변 마을 사업설명회 및 지장유무조회 결과보고, 간이입지 환경성 분석 및 경관영향 검토 결과 보고, 대안평가 안내) □ '25.12 : 입지선정위원회 5차회의 시행(최종후보지 및 경과지 선정 완료) □ '26.02 : 입지확정위원회 구성 및 심의결과 보고 □ '26.03 : 설계 측량 시행(3/30~31) □ '26.05 : 설계 측량 결과 검토 및 소규모 환경영향평가 발주 의뢰 [향후 계획] □ '26.10 : 주민설명회 시행 (사전환경성 평가 용역 초안 완료시) □ '26.11 : 사업시행계획서 작성 □ '27.01 : 실시계획 신청자료 작성 attachment_count 0 source_detail_sha256 2db9d5ec1bde94aa0090d1fe7c234b3930bd73e5dedeecfdcc0fe2db31639171 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232678|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1834c7ce9e8f23ee
Sources EV-4d9049528da0bf0aec699598 Evidence SHA-256 2db9d5ec1bde94aa0090d1fe7c234b3930bd73e5dedeecfdcc0fe2db31639171 행 SHA-256 f829dbccb571c27980349cafd23bb4670505240a343c9668515f0a58128ea1b6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_c1135ac9af819cfd stable_project_key prjtDef:232678:ESB project_definition 232678 first_region_code ESB manual_source_format false project_name 154kV 서보은(수한)분기T/L 건설사업 project_name_list 154kV 서보은(수한)분기 송전선로 건설사업 purpose 보은지역 신재생E 접속용량 선제적 확보 project_region_detail 충청북도 보은군 project_period_raw 2024.01~2030.12 project_scale_raw A410 × 4C × 1KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c1135ac9af819cfd
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c1135ac9af819cfd
Sources EV-c653ef4e5c725b8ab26e7b1d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 fda4960e9a73f8ac1453f309d781256130e13b3a7560113c9312563cefff9da4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-137d0ca0a249d64ffc0ce9ea
Detailed source fields Original source field Published value or condition stable_project_id kproj_c41bf66d3114ffeb stable_project_key prjtDef:231379:ESB project_definition 231379 first_region_code ESB manual_source_format false project_name 154kV 서비응 건설사업 project_name_list 154kV 서비응S/S 건설사업 purpose 새만금 산단 내 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.11~2027.12 project_scale_raw 170KV E-GIS 50KA X 4CCT responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_c41bf66d3114ffeb
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c41bf66d3114ffeb
Sources EV-137d0ca0a249d64ffc0ce9ea Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2b73b3ae5114c2228b2ec3440e3538fcd5df3dc6110d8f3d755ad6aa7de5d730 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231379|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_cd08f04575d447ba stable_project_id kproj_c41bf66d3114ffeb source_key 202609|231379|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 서비응S/S 건설사업 project_name_detail 154kV 서비응 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.12 참여 위원 수 : 경과지(부지) 확정: 2025.02 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2025.03 ~ 2025.06 실시설계: 설계담당자: [redacted] [진행경과] □ '24.10 : 154kV 비응#4변전소 및 연관사업 조기착수 □ '24.12 : 입지선정실무위원회 구성 및 시행 □ '25.01 : 입지선정실무위원회 결과보고 및 최종 후보지 선정 □ '25.02 : 입지확정위원회 구성 및 시행 □ '25.04 : 기본설계(안) 심의위원회 시행(통합) □ '25.04 : 새만금지구 국가산업단지 실시계획(26차) 변경 고시 □ '25.05 : 변전소 부지 매매계약서 체결 □ '25.06 : 기본설계 완료(토건, 변전) [향후계획] □ '26.04 : 설계 및 계약완료 □ '26.05 : 토건공사 착공 □ '27.12 : 변전소 가 future_plan_redacted □ 향후계획 [진행경과] □ '24.10 : 154kV 비응#4변전소 및 연관사업 조기착수 □ '24.12 : 입지선정실무위원회 구성 및 시행 □ '25.01 : 입지선정실무위원회 결과보고 및 최종 후보지 선정 □ '25.02 : 입지확정위원회 구성 및 시행 □ '25.04 : 기본설계(안) 심의위원회 시행(통합) □ '25.04 : 새만금지구 국가산업단지 실시계획(26차) 변경 고시 □ '25.05 : 변전소 부지 매매계약서 체결 □ '25.06 : 기본설계 완료(토건, 변전) [향후계획] □ '26.04 : 설계 및 계약완료 □ '26.05 : 토건공사 착공 □ '27.12 : 변전소 가 attachment_count 0 source_detail_sha256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231379|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cd08f04575d447ba
Sources EV-6347a3d7ea4ae3b00826435c Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26 행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_c41bf66d3114ffeb stable_project_key prjtDef:231379:ESB project_definition 231379 first_region_code ESB manual_source_format false project_name 154kV 서비응 건설사업 project_name_list 154kV 서비응S/S 건설사업 purpose 새만금 산단 내 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.11~2027.12 project_scale_raw 170KV E-GIS 50KA X 4CCT responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_c41bf66d3114ffeb
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c41bf66d3114ffeb
Sources EV-137d0ca0a249d64ffc0ce9ea Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2b73b3ae5114c2228b2ec3440e3538fcd5df3dc6110d8f3d755ad6aa7de5d730 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d2f8fb5f8d26c4d83991b8c6
Detailed source fields Original source field Published value or condition stable_project_id kproj_452c668ef46f4df3 stable_project_key prjtDef:234557:ESB project_definition 234557 first_region_code ESB manual_source_format false project_name 154kV 서산-성연 전력구 건설사업 project_name_list 서산지역 전기공급시설 전력구공사(서산-성연) purpose 서산지역 및 대산석유화학단지 내 안정적인 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2022.04~2026.06 project_scale_raw 실드TBM 2,052M, 개착식 전력구 527M, 수직구 2개소 responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_452c668ef46f4df3
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_452c668ef46f4df3
Sources EV-d2f8fb5f8d26c4d83991b8c6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2487f117da601a614ebd48da57196496ebeb12a5c8ccfa39b5d4226feb51f375 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234557|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_66e74f6e1be671ee
Sources EV-0fc53f5d5d3bc103c4877d7e Evidence SHA-256 97c7fff882b8a993600b84f6163cfa1f4a961cc8413bdf3de188a11f50e072b8 행 SHA-256 e87ccfebc6e9248ac0d113b32d07b56994c40e535c109882a209ef44b53ae423 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234557|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_66e74f6e1be671ee
Sources EV-0fc53f5d5d3bc103c4877d7e Evidence SHA-256 97c7fff882b8a993600b84f6163cfa1f4a961cc8413bdf3de188a11f50e072b8 행 SHA-256 e87ccfebc6e9248ac0d113b32d07b56994c40e535c109882a209ef44b53ae423 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_66e74f6e1be671ee stable_project_id kproj_452c668ef46f4df3 source_key 202609|234557|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 서산지역 전기공급시설 전력구공사(서산-성연) project_name_detail 154kV 서산-성연 전력구 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Seosan City, South Chungcheong Province 사업 규모 실드TBM 2,052M, 개착식 전력구 527M, 수직구 2개소 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2020.01 ~ 2021.07 기본설계: 2020.01 ~ 2020.08 실시설계: 2021.01 ~ 2021.07 설계담당자: [redacted] 건설공사 개요 공사 착공: 2022.04 공사 기간: 2022.04 ~ 2026.06 감독자: [redacted], 실적): 99, 94 future_plan_redacted □ 향후계획 '26.06 : 공사준공 attachment_count 0 source_detail_sha256 97c7fff882b8a993600b84f6163cfa1f4a961cc8413bdf3de188a11f50e072b8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234557|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_66e74f6e1be671ee
Sources EV-0fc53f5d5d3bc103c4877d7e Evidence SHA-256 97c7fff882b8a993600b84f6163cfa1f4a961cc8413bdf3de188a11f50e072b8 행 SHA-256 e87ccfebc6e9248ac0d113b32d07b56994c40e535c109882a209ef44b53ae423 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_452c668ef46f4df3 stable_project_key prjtDef:234557:ESB project_definition 234557 first_region_code ESB manual_source_format false project_name 154kV 서산-성연 전력구 건설사업 project_name_list 서산지역 전기공급시설 전력구공사(서산-성연) purpose 서산지역 및 대산석유화학단지 내 안정적인 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2022.04~2026.06 project_scale_raw 실드TBM 2,052M, 개착식 전력구 527M, 수직구 2개소 responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_452c668ef46f4df3
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_452c668ef46f4df3
Sources EV-d2f8fb5f8d26c4d83991b8c6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2487f117da601a614ebd48da57196496ebeb12a5c8ccfa39b5d4226feb51f375 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4f12db1e272ee511c2399cb2
Detailed source fields Original source field Published value or condition stable_project_id kproj_dc269645733bcbbb stable_project_key prjtDef:233579:ESB project_definition 233579 first_region_code ESB manual_source_format false project_name 154kV 서산-성연 지중T/L 건설사업 project_name_list 154kV 서산-성연 지중T/L 건설사업 purpose 충남 서산지역 공급능력 확충 및 계통보강 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2026.10 project_scale_raw 154KV XLPE 2,000, 2C-2.6KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_dc269645733bcbbb
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dc269645733bcbbb
Sources EV-4f12db1e272ee511c2399cb2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d888bd79e53f1c561f13e968390de8981626d99eb852bf62321cbd4b6e223e8d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_af0f921ba20f1e3c stable_project_id kproj_dc269645733bcbbb source_key 202609|233579|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 서산-성연 지중T/L 건설사업 project_name_detail 154kV 서산-성연 지중T/L 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Seosan City, South Chungcheong Province 사업 규모 154KV XLPE 2,000, 2C-2.6KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: -18.06 : 제8차 장기송변전설비계획 신규사업 반영 -25.06 : 착수시점 도래시 기본설계 등 사업착수 예정 future_plan_redacted □ 향후계획 -18.06 : 제8차 장기송변전설비계획 신규사업 반영 -25.06 : 착수시점 도래시 기본설계 등 사업착수 예정 attachment_count 0 source_detail_sha256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233579|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_af0f921ba20f1e3c
Sources EV-fcf6ef088aa193cf598f8fa7 Evidence SHA-256 8c84dc6d8d117e3149c8018432693facb453af8de7988fbd56f6f9487fd6b55f 행 SHA-256 094076a81dcd425d2390e38434fa35c64bbb02aca970da6bf00b44708286a224 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_dc269645733bcbbb stable_project_key prjtDef:233579:ESB project_definition 233579 first_region_code ESB manual_source_format false project_name 154kV 서산-성연 지중T/L 건설사업 project_name_list 154kV 서산-성연 지중T/L 건설사업 purpose 충남 서산지역 공급능력 확충 및 계통보강 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2026.10 project_scale_raw 154KV XLPE 2,000, 2C-2.6KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_dc269645733bcbbb
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dc269645733bcbbb
Sources EV-4f12db1e272ee511c2399cb2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d888bd79e53f1c561f13e968390de8981626d99eb852bf62321cbd4b6e223e8d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-1ff667eb6c880d2287b73342
Detailed source fields Original source field Published value or condition stable_project_id kproj_fa7faf3c90a86d97 stable_project_key prjtDef:232545:ESB project_definition 232545 first_region_code ESB manual_source_format false project_name 154kV 서산-성연(2∏화) 건설사업 project_name_list 154kV 서산-성연(2∏화) 건설사업 purpose 신규부하(대산석유화학단지)공급 및 주요 ? project_region_detail Seosan City, South Chungcheong Province project_period_raw 2018.06~2026.10 project_scale_raw STACIR 330㎟×S×2C, 약 0.3㎞ responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_fa7faf3c90a86d97
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fa7faf3c90a86d97
Sources EV-1ff667eb6c880d2287b73342 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d3b4e4718b5f2ecad5ff191d0b2e9d796e0e8e849a80fb087165b626bf59fbeb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232545|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_756fc85614cb2efa
Sources EV-f8dce1dabe0fcd7e6bac00d5 Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5 행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232545|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_756fc85614cb2efa
Sources EV-f8dce1dabe0fcd7e6bac00d5 Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5 행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2021-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232545|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_756fc85614cb2efa
Sources EV-f8dce1dabe0fcd7e6bac00d5 Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5 행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2005-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232545|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_756fc85614cb2efa
Sources EV-f8dce1dabe0fcd7e6bac00d5 Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5 행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e Observations for this power asset History for this project Previous Next