POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 21items · current page 1–21 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서비응 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-137d0ca0a249d64ffc0ce9ea
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c41bf66d3114ffeb
stable_project_keyprjtDef:231379:ESB
project_definition231379
first_region_codeESB
manual_source_formatfalse
project_name154kV 서비응 건설사업
project_name_list154kV 서비응S/S 건설사업
purpose새만금 산단 내 전력공급
project_region_detail전북특별자치도 군산시
project_period_raw2026.11~2027.12
project_scale_raw170KV E-GIS 50KA X 4CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_cd08f04575d447ba
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_c41bf66d3114ffeb

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c41bf66d3114ffeb

Sources EV-137d0ca0a249d64ffc0ce9ea
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2b73b3ae5114c2228b2ec3440e3538fcd5df3dc6110d8f3d755ad6aa7de5d730
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-11
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source schedule candidates · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231379|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source snapshots by date · KOR · kepco_planned

154kV 서비응 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_cd08f04575d447ba
stable_project_idkproj_c41bf66d3114ffeb
source_key202609|231379|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 서비응S/S 건설사업
project_name_detail154kV 서비응 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금 산단 내 전력공급
Project region
  • 전북특별자치도 군산시
Project period
  • 2026.11~2027.12
사업 규모
  • 170KV E-GIS 50KA X 4CCT
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.12 참여 위원 수 : 경과지(부지) 확정: 2025.02
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2025.03 ~ 2025.06 실시설계: 설계담당자: [redacted]
[진행경과] □ '24.10 : 154kV 비응#4변전소 및 연관사업 조기착수 □ '24.12 : 입지선정실무위원회 구성 및 시행 □ '25.01 : 입지선정실무위원회 결과보고 및 최종 후보지 선정 □ '25.02 : 입지확정위원회 구성 및 시행 □ '25.04 : 기본설계(안) 심의위원회 시행(통합) □ '25.04 : 새만금지구 국가산업단지 실시계획(26차) 변경 고시 □ '25.05 : 변전소 부지 매매계약서 체결 □ '25.06 : 기본설계 완료(토건, 변전) [향후계획] □ '26.04 : 설계 및 계약완료 □ '26.05 : 토건공사 착공 □ '27.12 : 변전소 가
future_plan_redacted□ 향후계획 [진행경과] □ '24.10 : 154kV 비응#4변전소 및 연관사업 조기착수 □ '24.12 : 입지선정실무위원회 구성 및 시행 □ '25.01 : 입지선정실무위원회 결과보고 및 최종 후보지 선정 □ '25.02 : 입지확정위원회 구성 및 시행 □ '25.04 : 기본설계(안) 심의위원회 시행(통합) □ '25.04 : 새만금지구 국가산업단지 실시계획(26차) 변경 고시 □ '25.05 : 변전소 부지 매매계약서 체결 □ '25.06 : 기본설계 완료(토건, 변전) [향후계획] □ '26.04 : 설계 및 계약완료 □ '26.05 : 토건공사 착공 □ '27.12 : 변전소 가
attachment_count0
source_detail_sha256a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231379|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cd08f04575d447ba

Sources EV-6347a3d7ea4ae3b00826435c
Evidence SHA-256 a3d714dad054611792eb34789911585e29febf7c2b251185e16ab1bd6fd5dc26
행 SHA-256 5504e5fcede902f7c9ccfd03f410e75e7882ce68a92f521ffcdb0e884f370684
Source snapshots by date · KOR · kepco_planned

154kV 서비응 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c41bf66d3114ffeb
stable_project_keyprjtDef:231379:ESB
project_definition231379
first_region_codeESB
manual_source_formatfalse
project_name154kV 서비응 건설사업
project_name_list154kV 서비응S/S 건설사업
purpose새만금 산단 내 전력공급
project_region_detail전북특별자치도 군산시
project_period_raw2026.11~2027.12
project_scale_raw170KV E-GIS 50KA X 4CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_cd08f04575d447ba
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_c41bf66d3114ffeb

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c41bf66d3114ffeb

Sources EV-137d0ca0a249d64ffc0ce9ea
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2b73b3ae5114c2228b2ec3440e3538fcd5df3dc6110d8f3d755ad6aa7de5d730

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel