Power assets and projects · KOR · kepco_planned

154kV 새만금-비응#2 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4b4ba78c0960e6dac66d3065
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0171185a92d007a2
stable_project_keyprjtDef:234662:ESB
project_definition234662
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금-비응#2 전력구 건설사업
project_name_list군산지역 전기공급시설 전력구공사(동비응-새만금))
purpose계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.02~2026.10
project_scale_raw송전관로 4회선 5.4KM (터널 0.2KM 포함)
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4a4cf708ad24cb53
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0171185a92d007a2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0171185a92d007a2

Sources EV-4b4ba78c0960e6dac66d3065
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1dcc4455edf5b7a3d5f090064512a3b552ff07c5d64898f2639b3af4673a1ba1
Source schedule candidates · KOR · kepco_planned

154kV 새만금-비응#2 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234662|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4a4cf708ad24cb53

Sources EV-584c9120f13aefb4b758d506
Evidence SHA-256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3
행 SHA-256 29abb3e4dd51bcd55914ec7b4894984f0db7a457e13955ebc58dcad0447eab4b
Source schedule candidates · KOR · kepco_planned

154kV 새만금-비응#2 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234662|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4a4cf708ad24cb53

Sources EV-584c9120f13aefb4b758d506
Evidence SHA-256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3
행 SHA-256 29abb3e4dd51bcd55914ec7b4894984f0db7a457e13955ebc58dcad0447eab4b
Source snapshots by date · KOR · kepco_planned

154kV 새만금-비응#2 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_4a4cf708ad24cb53
stable_project_idkproj_0171185a92d007a2
source_key202609|234662|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list군산지역 전기공급시설 전력구공사(동비응-새만금))
project_name_detail154kV 새만금-비응#2 전력구 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 계통보강
Project region
  • 전북특별자치도 군산시
Project period
  • 2024.02~2026.10
사업 규모
  • 송전관로 4회선 5.4KM (터널 0.2KM 포함)
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.03 ~ 2024.11 기본설계: 2024.03 ~ 2024.06 실시설계: 2024.06 ~ 2024.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.07 공사 기간: 2025.07 ~ 2027.03 감독자: [redacted], 실적): 99, 80
ㅇ'24.11 설계 완료 ㅇ'25.01 시공사 입찰공고 ㅇ'25.06 시공사 계약 ㅇ'25.06 공사 착공(6/25) ㅇ'27.03 공사 준공(예정)
future_plan_redacted□ 향후계획 ㅇ'24.11 설계 완료 ㅇ'25.01 시공사 입찰공고 ㅇ'25.06 시공사 계약 ㅇ'25.06 공사 착공(6/25) ㅇ'27.03 공사 준공(예정)
attachment_count0
source_detail_sha25604697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234662|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4a4cf708ad24cb53

Sources EV-584c9120f13aefb4b758d506
Evidence SHA-256 04697d4dd07231e77608278afdf42e8716e79f58cea71a57db77a7fd982eeea3
행 SHA-256 29abb3e4dd51bcd55914ec7b4894984f0db7a457e13955ebc58dcad0447eab4b
Source snapshots by date · KOR · kepco_planned

154kV 새만금-비응#2 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0171185a92d007a2
stable_project_keyprjtDef:234662:ESB
project_definition234662
first_region_codeESB
manual_source_formatfalse
project_name154kV 새만금-비응#2 전력구 건설사업
project_name_list군산지역 전기공급시설 전력구공사(동비응-새만금))
purpose계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.02~2026.10
project_scale_raw송전관로 4회선 5.4KM (터널 0.2KM 포함)
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4a4cf708ad24cb53
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0171185a92d007a2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0171185a92d007a2

Sources EV-4b4ba78c0960e6dac66d3065
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1dcc4455edf5b7a3d5f090064512a3b552ff07c5d64898f2639b3af4673a1ba1

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel