POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 3001–3100 · Source records, not unique facilities.

Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2022-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2004-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2018-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2018-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source schedule candidates · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232545|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source snapshots by date · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_756fc85614cb2efa
stable_project_idkproj_fa7faf3c90a86d97
source_key202609|232545|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 서산-성연(2∏화) 건설사업
project_name_detail154kV 서산-성연(2∏화) 건설사업
region_summary_raw충청남도 서산시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 신규부하(대산석유화학단지)공급 및 주요 ?
Project region
  • Seosan City, South Chungcheong Province
Project period
  • 2018.06~2026.10
사업 규모
  • STACIR 330㎟×S×2C, 약 0.3㎞
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2019.05~2019.05 경과지(부지) 확정: 2018.10
환경/재해 영향평가
  • 환경영향평가: 2021.06 ~ 2022.06 재해영향평가: 2021.06 ~ 2022.06
주민의견 수렴
  • 지자체 공고 열람: 2021.04 ~ 2021.04 설명회·공청회: 2021.04 자체설명회: 2020.09 ~ 2022.04
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.07 ~ 2022.10 실시설계: 2022.11 ~ 2023.11 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.04 공사 기간: 2024.04 ~ 2026.03 감독자: [redacted], 실적): 99, 54
[추진실적] □‘18.06 : 제8차 장기 송변전설비계획 신규반영(단일계통 보강사업) □‘18.09 : 345kV 신성연S/S 및 연관T/L 건설사업 후보지 현장답사 □‘18.10 : C/H 철탑 부지 확정 □‘19.04 : 서산-성연 송전선로 경과지 측량 완료 □‘19.05 : 지자체 사업안내 및 지장유무조회 완료(서산시) □‘20.06 : 철탑 인접도로 지장유무조회 완료(서산시, 예산국토관리사무소) □‘20.09 : 마을주민 대상 사업설명회 시행(고남3리) □‘21.02 : 송전선로 예정 경과지 지장유무조회 회신 완료(서산시) □‘21.04 : 사업시행계획 제출(서산시, 산업부) 및 열람?공고 □‘21.04 : 실시계획승인신청을 위한 주민설명회 시행(고남3리, 오사3리) □‘22.02 : 중토위 협의요청 공문발송(산업통상자원부) 및 LTIS 입력 □‘22.06 : 실시계획 승인고시(산업통상자원부) □‘22.10 : 기본설계 완료 □‘23.05 : 기본안전보건대장 작성 □‘23.11 : 실시설계 완료 □‘24.01 : 공사계약 □‘24.04 : 공사착공 □‘25.04 : 154kV 서산-대산#3·4T/L 가선로 구성(04.23 ~ 05.02) □‘25.11 : 154kV 서산-대산#3·4T/L 본선로 구성 □‘25.07 : C/T 기초 시공 완료 [향후계획] □ ‘26.01 : C/T 전력구(입상부) 시공 완료 대기 □ ’26.03 : 154kV 서산-대산#3·4T/L 본선로 구성(휴전작업)
future_plan_redacted□ 향후계획 [추진실적] □‘18.06 : 제8차 장기 송변전설비계획 신규반영(단일계통 보강사업) □‘18.09 : 345kV 신성연S/S 및 연관T/L 건설사업 후보지 현장답사 □‘18.10 : C/H 철탑 부지 확정 □‘19.04 : 서산-성연 송전선로 경과지 측량 완료 □‘19.05 : 지자체 사업안내 및 지장유무조회 완료(서산시) □‘20.06 : 철탑 인접도로 지장유무조회 완료(서산시, 예산국토관리사무소) □‘20.09 : 마을주민 대상 사업설명회 시행(고남3리) □‘21.02 : 송전선로 예정 경과지 지장유무조회 회신 완료(서산시) □‘21.04 : 사업시행계획 제출(서산시, 산업부) 및 열람?공고 □‘21.04 : 실시계획승인신청을 위한 주민설명회 시행(고남3리, 오사3리) □‘22.02 : 중토위 협의요청 공문발송(산업통상자원부) 및 LTIS 입력 □‘22.06 : 실시계획 승인고시(산업통상자원부) □‘22.10 : 기본설계 완료 □‘23.05 : 기본안전보건대장 작성 □‘23.11 : 실시설계 완료 □‘24.01 : 공사계약 □‘24.04 : 공사착공 □‘25.04 : 154kV 서산-대산#3·4T/L 가선로 구성(04.23 ~ 05.02) □‘25.11 : 154kV 서산-대산#3·4T/L 본선로 구성 □‘25.07 : C/T 기초 시공 완료 [향후계획] □ ‘26.01 : C/T 전력구(입상부) 시공 완료 대기 □ ’26.03 : 154kV 서산-대산#3·4T/L 본선로 구성(휴전작업)
attachment_count0
source_detail_sha256b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232545|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_756fc85614cb2efa

Sources EV-f8dce1dabe0fcd7e6bac00d5
Evidence SHA-256 b0b04125cfe82d10e986680b7a571bad8f3e54d2eb80448d0a489be65ade05c5
행 SHA-256 c455bd95d295ad0c88aa793126a4d26fb89d916977a6e54788018a529ad4506e
Source snapshots by date · KOR · kepco_planned

154kV 서산-성연(2∏화) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fa7faf3c90a86d97
stable_project_keyprjtDef:232545:ESB
project_definition232545
first_region_codeESB
manual_source_formatfalse
project_name154kV 서산-성연(2∏화) 건설사업
project_name_list154kV 서산-성연(2∏화) 건설사업
purpose신규부하(대산석유화학단지)공급 및 주요 ?
project_region_detailSeosan City, South Chungcheong Province
project_period_raw2018.06~2026.10
project_scale_rawSTACIR 330㎟×S×2C, 약 0.3㎞
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_756fc85614cb2efa
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_fa7faf3c90a86d97

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fa7faf3c90a86d97

Sources EV-1ff667eb6c880d2287b73342
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d3b4e4718b5f2ecad5ff191d0b2e9d796e0e8e849a80fb087165b626bf59fbeb
Power assets and projects · KOR · kepco_planned

154kV 서송도S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-33e2c55f330ed794d1aafc3e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7cb8d480126b1ed6
stable_project_keyprjtDef:231371:ESB
project_definition231371
first_region_codeESB
manual_source_formatfalse
project_name154kV 서송도S/S 건설사업
project_name_list154kV 서송도S/S 건설사업
purpose송도국제도시 10공구 및 인천신항 부하공급
project_region_detail인천광역시 연수구
project_period_raw2023.02~2025.12
project_scale_raw60MVA X 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e8c5397ce26a7dda
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7cb8d480126b1ed6

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7cb8d480126b1ed6

Sources EV-33e2c55f330ed794d1aafc3e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c8922ea1ddff52a427abe8a86590332dd3bb0191ca0a09844a3627af6955b45
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2027-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2016-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source schedule candidates · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2016-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231371|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source snapshots by date · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e8c5397ce26a7dda
stable_project_idkproj_7cb8d480126b1ed6
source_key202609|231371|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 서송도S/S 건설사업
project_name_detail154kV 서송도S/S 건설사업
region_summary_raw인천광역시 연수구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 송도국제도시 10공구 및 인천신항 부하공급
Project region
  • 인천광역시 연수구
Project period
  • 2023.02~2025.12
사업 규모
  • 60MVA X 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제05차 장기송변전설비계획 반영()
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2016.10 참여 위원 수 : 15 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
  • 2022.05
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2023.02 공사 기간: 2023.02 ~ 2027.06 감독자: [redacted], 실적): 100, 89
1. 진행경과 - '24.07월 : 지상2층 Base channel 설치 - '24.12월 : 전력구 관련 준공 목표 변경 필요[(당초)25.06월 → (변경)26.12월] - '25.06월 : 토건공사 준공 - '25.12월 : 변전기기 설치완료 및 준공시험 2. 향후계획 - '26.01월 : 서송도S/S 건설사업 감리용역 및 관련 공사 중지 - '27.05월 : 서송도S/S 건설사업 감리용역 및 관련 공사 재개 - '27.06월 : 변전소 초기가압 및 준공
future_plan_redacted□ 향후계획 1. 진행경과 - '24.07월 : 지상2층 Base channel 설치 - '24.12월 : 전력구 관련 준공 목표 변경 필요[(당초)25.06월 → (변경)26.12월] - '25.06월 : 토건공사 준공 - '25.12월 : 변전기기 설치완료 및 준공시험 2. 향후계획 - '26.01월 : 서송도S/S 건설사업 감리용역 및 관련 공사 중지 - '27.05월 : 서송도S/S 건설사업 감리용역 및 관련 공사 재개 - '27.06월 : 변전소 초기가압 및 준공
attachment_count0
source_detail_sha256849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231371|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e8c5397ce26a7dda

Sources EV-32dc77cea13e26fc42b00a1c
Evidence SHA-256 849b597efe397889f561df1d346f7ae968ba2e2232759c44d52bf0fb954958e4
행 SHA-256 fd961497e4bd36a959e10fc51dc252342614fab13b000da9d6826965ed3eb27a
Source snapshots by date · KOR · kepco_planned

154kV 서송도S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7cb8d480126b1ed6
stable_project_keyprjtDef:231371:ESB
project_definition231371
first_region_codeESB
manual_source_formatfalse
project_name154kV 서송도S/S 건설사업
project_name_list154kV 서송도S/S 건설사업
purpose송도국제도시 10공구 및 인천신항 부하공급
project_region_detail인천광역시 연수구
project_period_raw2023.02~2025.12
project_scale_raw60MVA X 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e8c5397ce26a7dda
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7cb8d480126b1ed6

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7cb8d480126b1ed6

Sources EV-33e2c55f330ed794d1aafc3e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c8922ea1ddff52a427abe8a86590332dd3bb0191ca0a09844a3627af6955b45
Power assets and projects · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-3665ba6c13d24bafebe13dc2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aadc4d55cbabe1cb
stable_project_keyprjtDef:231470:ESB
project_definition231470
first_region_codeESB
manual_source_formatfalse
project_name154kV 서영광(영광#2)S/S 건설사업
project_name_list154kV 서영광(영광#2)S/S 건설사업
purpose영광지역 내 분산형전원 연계용량 확보
project_region_detail전남광주통합특별시 영광군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 2BANK(최종4BANK,SH.R 1BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bab5e32ff3e61f34
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aadc4d55cbabe1cb

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aadc4d55cbabe1cb

Sources EV-3665ba6c13d24bafebe13dc2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 eab9c8bc899b495d87a555a900493938d442344ef6a25d445ba9db29f4e65249
Source schedule candidates · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231470|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bab5e32ff3e61f34

Sources EV-34e3e719e329adfbd5d6a73d
Evidence SHA-256 1c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
행 SHA-256 eb77be1fae24f9e5bdc20ecb81b8357aa1e9a086c90b953022ea9e3684523167
Source schedule candidates · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231470|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bab5e32ff3e61f34

Sources EV-34e3e719e329adfbd5d6a73d
Evidence SHA-256 1c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
행 SHA-256 eb77be1fae24f9e5bdc20ecb81b8357aa1e9a086c90b953022ea9e3684523167
Source snapshots by date · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_bab5e32ff3e61f34
stable_project_idkproj_aadc4d55cbabe1cb
source_key202609|231470|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 서영광(영광#2)S/S 건설사업
project_name_detail154kV 서영광(영광#2)S/S 건설사업
region_summary_raw전남광주통합특별시 영광군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 영광지역 내 분산형전원 연계용량 확보
Project region
  • 전남광주통합특별시 영광군
Project period
  • 2018.06~2026.10
사업 규모
  • 154KV M.TR 2BANK(최종4BANK,SH.R 1BANK)
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2020.05 입지선정위원회 구성시기: 2020.08 참여 위원 수 : 15 지장유무 조회: 2021.02~2021.05 경과지(부지) 확정: 2021.05
환경/재해 영향평가
  • 환경영향평가: 2021.10 ~ 2022.10 재해영향평가: 2021.10 ~ 2022.10
주민의견 수렴
  • 지자체 공고 열람: 2022.03 ~ 2022.04 설명회·공청회: 2022.04 자체설명회: 2020.07 ~ 2021.03
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.08 ~ 2023.11 실시설계: 2024.12 ~ 2025.05 설계담당자: [redacted]
[계획확정~사업승인전 추진실적] ○'21.05 : 입지확정위원회 시행 및 부지확정 ○'21.10 : 사업시행계획서 제출(→산업통상자원부) ○'22.06 : 전원개발사업 실시계획 승인 신청(→산업통상자원부) [사업승인~공사착수전 추진실적] ○'23.05 : 전원개발 실시계획 승인 및 고시 ○'23.09 : 변전 기본설계 시행 ○'24.10 : 주자재 발주 착수 [공사착수] ○'26.03 : 변전소 건설공사(일반) 착공 [향후계획] ○'26.10 : 변전소 기기가압 및 준공
future_plan_redacted□ 향후계획 [계획확정~사업승인전 추진실적] ○'21.05 : 입지확정위원회 시행 및 부지확정 ○'21.10 : 사업시행계획서 제출(→산업통상자원부) ○'22.06 : 전원개발사업 실시계획 승인 신청(→산업통상자원부) [사업승인~공사착수전 추진실적] ○'23.05 : 전원개발 실시계획 승인 및 고시 ○'23.09 : 변전 기본설계 시행 ○'24.10 : 주자재 발주 착수 [공사착수] ○'26.03 : 변전소 건설공사(일반) 착공 [향후계획] ○'26.10 : 변전소 기기가압 및 준공
attachment_count0
source_detail_sha2561c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231470|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bab5e32ff3e61f34

Sources EV-34e3e719e329adfbd5d6a73d
Evidence SHA-256 1c0db0254a43d7a84328c1406787a8c19462c8f55c964dee20586401ecfaede3
행 SHA-256 eb77be1fae24f9e5bdc20ecb81b8357aa1e9a086c90b953022ea9e3684523167
Source snapshots by date · KOR · kepco_planned

154kV 서영광(영광#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_aadc4d55cbabe1cb
stable_project_keyprjtDef:231470:ESB
project_definition231470
first_region_codeESB
manual_source_formatfalse
project_name154kV 서영광(영광#2)S/S 건설사업
project_name_list154kV 서영광(영광#2)S/S 건설사업
purpose영광지역 내 분산형전원 연계용량 확보
project_region_detail전남광주통합특별시 영광군
project_period_raw2018.06~2026.10
project_scale_raw154KV M.TR 2BANK(최종4BANK,SH.R 1BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bab5e32ff3e61f34
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_aadc4d55cbabe1cb

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_aadc4d55cbabe1cb

Sources EV-3665ba6c13d24bafebe13dc2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 eab9c8bc899b495d87a555a900493938d442344ef6a25d445ba9db29f4e65249
Power assets and projects · KOR · kepco_planned

154kV 서예산S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2dd0635f6a37ba9b540cfc2d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5468a835f5d11a9f
stable_project_keyprjtDef:231380:ESB
project_definition231380
first_region_codeESB
manual_source_formatfalse
project_name154kV 서예산S/S 건설사업
project_name_list154kV 서예산변전소 건설사업
purpose내포신도시, 예산, 홍성지역 등 신규부하 공급 및 기설변전소(홍성, 응봉
project_region_detail충청남도 예산군
project_period_raw2024.02~2028.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_0a356efd873993c2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5468a835f5d11a9f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5468a835f5d11a9f

Sources EV-2dd0635f6a37ba9b540cfc2d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e9c1d3e2c8a8f38dc6557ebee6b6455c72fc52b080ecad005e06d73731f06057
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776
Source schedule candidates · KOR · kepco_planned

154kV 서예산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231380|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_0a356efd873993c2

Sources EV-ff7f5c5b6d46c917568434f4
Evidence SHA-256 4dd288e188448c749cb6436c81f5d0ad0167a3d13091c1a2d03674d62b989a66
행 SHA-256 426beff80f272cf6733103e9c6c3efda0d6e05cd0526354a1156a2a0ccd42776

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel